Engineering PapersSearch

SEARCH · Engineering Papers

Results for “installation guides”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

HBET V3.0 Installation Manual

The Hydropower Biological Evaluation Toolset (HBET) V3.0 now requires Python v3.11.0 to be installed, following the addition of the absolute fish injury rate prediction feature. This version introduces two new strike metrics—based on velocity and pressure—to provide a more precise understanding of the biological effects of fish collisions with rigid structures within the fish passage system. Additionally, SQL Server 2019 is the supported database for this release. This installation guide will walk users through the process of installing HBET V3.0 along with all necessary dependencies.

13 HYDRO ENERGY

Numerical modeling of impurity powder injection in W7-X

In this work, we present numerical simulation results of powder injection in W7-X using the EMC3-EIRENE and DIS codes. First, we model powder injection experiments performed in W7-X with the Probe Mounted Powder Injector. The simulation results qualitatively agree with visible imaging measurements. Secondly, we perform predictive simulations to guide the installation of an Impurity Powder Dropper in W7-X, allowing to choose in between several available non-vertical ports to maximize the amount of powder penetrating into the plasma, as well as the verticality of the port, to minimize sticking of the powders in the in-vessel stainless steel guiding tube. Port AEM41 is selected as the best candidate for IPD installation. The robustness of the simulation results has been verified for different plasma densities, powder materials and sizes, powder friction coefficient and changes in the plasma flow.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

An Educational Guide for 2D Stellar Structure Calculations of Rapidly Rotating Stars using the ESTER code

The Evolution STEllaire en Rotation (ESTER) code is the first 2D stellar structure code to be made open-source and freely available to the astronomy and astrophysics community. An important and novel advancement of this code is that it can reproduce the distorted shape and observable signatures (e.g., gravity darkening) of rapidly rotating stars. ESTER also calculates the steady-state large-scale flows within the star, namely their differential rotation and associated meridional circulation. In this report, we explore and document the physics implemented within version 1.1.0rc2 of the ESTER code, in a way that complements published descriptions. We illustrate this physics by plotting how stellar structure parameters vary through stellar interiors at a range of latitudes and at different angular velocities. We investigate how the thin convective envelopes of intermediate mass stars vary with latitude when rapidly rotating, becoming deeper and thicker near the equator. Simple comparisons of ESTER model predictions (e.g., central temperature and density, luminosity) with the output from the Modules for Experiments in Stellar Astrophysics (MESA) code [Paxton et al., 2010] shows generally good agreement. Additional comparisons provide important benchmarking and verification for ESTER as a comparatively young code. Finally, we provide a guide for installing and running the code on our local university cluster, aimed at helping students to begin work.

79 ASTRONOMY AND ASTROPHYSICS

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY

Preliminary Workforce Development and Environmental and Co-use Management Plans for a Floating Offshore Wind Platform - CRADA 609 (Final Report)

Pacific Northwest National Laboratory (PNNL) provided technical assistance to Glosten, Inc. and its affiliate, PelaStar, LLC to advance the development of their floating offshore wind (FOSW) platform. PNNL provided guidance and assessment in two areas that are important to address in the development of FOSW platforms: (1) workforce development and (2) environmental impacts and ocean co-use considerations. This work was funded by the U.S. Department of Energy’s (DOE) Wind Energy Technologies Office (WETO) through Phase 2 of the FLoating Offshore Wind ReadINess (FLOWIN) Prize. It should be noted that the Plans presented in this report are specific to the PelaStar tension-leg platform (TLP) and may not be applicable to all FOSW platforms. Workforce development and environmental/co-use impacts are highly dependent on the geographical region in which activities take place. At the request of PelaStar, PNNL focused on two regions where development may take place: the Gulf of Maine and Northern California. PNNL generated a preliminary Workforce Development Plan for PelaStar, which includes estimated job numbers and skillsets required to establish a workforce to manufacture, install, and operate their platform as part of FOSW projects. The Plan offers methods to increase diversity, equity, and inclusion practices when developing a new workforce and includes colleges and training centers for potential recruitment. Both positive and negative impacts to communities are evaluated, with potential mitigation strategies for reducing negative impacts. The structure of Community Benefit Agreements and Project Labor Agreements are discussed, noting the limitations of the role of a platform manufacturer versus the offshore wind developer. PNNL also drafted a preliminary Environmental and Co-Use Management Plan that serves as a guide to preparing an environmental assessment related to the installation and operation of PelaStar’s unique TLP design, including its potential ecological, socioeconomic, and emissions impacts. The Plan summarizes information on relevant regulatory requirements, potential impact producing factors, monitoring and mitigation measures, and physical and biological resources in the Gulf of Maine and Northern California. One of the primary perceived benefits of the PelaStar TLP is its reduced footprint due to its tensioned tendons versus catenary or taut moorings, but more research must be done as there are no studies on PelaStar’s TLP system to-date. The section also highlights ocean co-use considerations for PelaStar’s TLP system, specifically for fisheries, including existing perspectives, methods, examples, and limitations. The PNNL team established through this preliminary work and review of available literature and resources that there is not yet much research or planning around FOSW. With FOSW being a new industry, many of the findings and planning are adapted from fixed bottom offshore wind, which itself is only just taking off in the United States. More research is needed to establish best practices for workforce development and to assess environmental and ocean co-use impacts and mitigation approaches.

17 WIND ENERGY

Decarbonizing Building Thermal Systems: A How-to Guide for Heat Pump Systems and Beyond

Buildings account for a substantial portion of carbon emissions, primarily due to the widespread use of fossil fuels in heating systems. Decarbonization of heating is essential to meet climate targets and reduce the environmental impact of buildings. Heat pumps are capable of leveraging renewable energy sources and can provide heating and cooling in an energy-efficient manner. By leveraging heat pump technology, buildings can significantly reduce their carbon footprint, minimize energy consumption, and decrease their reliance on fossil fuels. The design and construction community plays a pivotal role in facilitating the transition to heat pump systems for heating and cooling. However, this transition requires specialized knowledge and expertise. This resource was developed for architects, engineers, and contractors in response to an industry need for a comprehensive technical resource that guides them through the intricacies of heat pump system design, installation, and maintenance. This resource provides detailed information on system sizing, selection of appropriate heat systems, heat sources, and integration with existing building systems. Moreover, it emphasizes best practices for ensuring operational efficiency, system longevity, and reliability. The development of this recourse was a collaborative effort between NREL/DOE Better Buildings Design and Construction Allies and ASHRAE Task Force for Building Decarbonization. This resource is composed of two complimentary portions that will be completed and released on separate time frames. The first portion will be completed and released in 2023, while the second portion will be released in 2024.

building thermal systems

Non-Refrigerated Warehouse Design Guide [Slides]

Warehouses typically have a low energy use relative to their floor area. This make warehouses ideal to install solar panels and offset on-site energy use and have a surplus of energy if roof area is maximized. This surplus can be used to provide things like grid services or charge electric vehicle fleets. This document is intended to provide owners and operators of warehouse information on designing efficient/decarbonized warehouses and maximize on-site generation. The information here references outside publications to provide specific guidance, such as the ASHRAE Advanced Energy Design Guides, but tailors the information specifically to warehouses. This guide provides owners a better understanding of warehouse design as well as more specific information for themselves or outside designers to reference.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Manufactured Home Equipment Sizing and Selection Tool

This tool is for use for manufactured homes built to the HUD Code (thermal provisions of the Manufactured Housing Construction and Safety Standards, Subpart F, Section §3280), including manufactured homes certified as ENERGY STAR® and DOE Efficient New Homes. It provides a simple look-up procedure to assist equipment specifiers, HVAC contractors, home installers, retailers, manufacturers, and electric utility staff. For new manufactured homes, it guides in selection of single speed heat pumps and air conditioners. For existing homes, it determines design conditions and nominal equipment size. The guidelines provide a simple but accurate procedure that reduces oversizing and its associated problems.

Source record

Measuring Local Turbulence Along the Optical Path: Multi-Beam Optical Seeing Sensor

Deflection of light along the optical path is a major source of image degradation for ground-based telescopes. Methods have been developed to measure upper atmospheric seeing based on models of the turbulence in the atmosphere, but due to boundary conditions, transmission within telescope enclosures is more complex. The Multi-beam Optical Seeing Sensor (MOSS) directly measures the component of the image quality degradation from inhomogeneity of the index of refraction within the telescope dome. MOSS outputs four near-parallel beams of light that travel along the optical path and are imaged by the telescope’s detector, landing like starlight on the telescope’s focal plane. By using a strobed light source, we can ‘freeze’ the instantaneous index variations transverse to the optical path. This system captures both ‘dome’ and ‘mirror’ seeing. Through plotting the standard deviation of differential motion between pairs of beams, MOSS enables characterization of the length scale of turbulence within the dome. The temporal coherence of temperature gradients can be probed with different pulse lengths, and the spatial coherence by comparing pairs at different separations across the aperture of the telescope. Optical path turbulence measurements, alongside other telemetry metrics, will guide thermal and airflow management to optimize image quality. A MOSS prototype was installed in the 1.2[Formula: see text]m Auxiliary Telescope (AuxTel) at the Vera C. Rubin Observatory in Chile, and preliminary data constrain the optical path turbulence with a lower bound of 1.4 arcsec. The optical path turbulence varied throughout the night of observing.

Astronomical seeing

Rooftop Unit (RTU) Maintenance Guide

The commercial buildings industry has long emphasized affordability, energy efficiency, and useful service life in rooftop unit (RTU) equipment. The trade-offs between these characteristics can impact decisions about the initial cost of equipment and ongoing operating costs. Often, the desire for lower initial costs leads to adoption of low-efficiency systems or neglect of proper maintenance in the interest of short-term cost savings. Maintenance of these systems is a critical step to ensure system efficiency and reliability, low operating costs, and a reasonable payback period. This guide is intended for facility managers who own or are interested in purchasing and installing RTUs and need to familiarize themselves with the maintenance requirements. This resource contains best practices, important considerations, and additional information related to commercial RTU equipment, but does not replace manufacturer-specific instructions.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Pitch Bearing Rating and Service Life Analysis

Pitch bearings are an essential component in wind turbines used to connect the blade root to the hub. They support the resulting simultaneous radial, axial, and overturning moment loads while allowing relative rotation of the blade to the hub. The most recent evidence indicates the replacement rate for pitch bearings on 3+ MW turbines can be several percent per year, reaching 10% by year 5. This is a far higher replacement rate than both older 1.5 to 2 MW turbines and 2 to 3 MW turbines, which only reach a 10% replacement rate by 14 to 24 years compared to the expected design life of at least 20 years. Typical pitch bearing replacements require the use of a large, expensive crane and removal of the blade(s) or rotor, with a significant amount of downtime. Given the most recent developments in pitch bearing reliability and the publication of the updated NREL and Fraunhofer IWES pitch bearing design guide, the purpose of this report is to update the performance and rating analysis of the example 1.9-meter diameter pitch bearing representative of that installed on a 1.5 MW wind turbine, compare the rating life to the observed service life of similar pitch bearings, and validate the service life modification factor with this large population of bearings. The report will also summarize the pitch bearing contact conditions, thereby serving as a guide for planned bench-level fretting wear tests at Argonne National Laboratory.

17 WIND ENERGY

Utility Energy Service Contract Guide

This guide serves as a key resource for acquisition teams developing utility energy service contracts (UESC) with an emphasis on using a task order to acquire energy management services under a General Services Administration areawide contract. The guide features a compilation of templates to assist your efforts from acquisition planning through awarding a task order for design and installation.

Cali, Peter [National Renewable Energy Laboratory