Engineering PapersSearch

DOE OSTI · 2575201

Federal Workplace Charging Program Guide

Abstract

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Bennett, Jesse [National Renewable Energy Laboratory (NREL), Golden, CO (United States)] (ORCID:0000000341380110), Hodge, Cabell [National Renewable Energy Laboratory (NREL), Golden, CO (United States)] (ORCID:0000000220822269), Kotz, Emily [National Renewable Energy Laboratory (NREL), Golden, CO (United States)]. 2025-08-07. Federal Workplace Charging Program Guide. https://doi.org/10.2172/2575201

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

A framework and tool for designing cost-effective, resilient, and circular net-zero supply chains under uncertainty with an application to multilayer plastic films

While 55% of Fortune 500 companies have committed to achieving net-zero emissions and/or zero-waste operations by 2035, only 2% are currently on track, revealing a critical gap between ambition and action. Designing supply chains that reduce both emissions and waste is a complex non-intuitive, multi-objective challenge, compounded by the high costs of new technologies and the need for resilient, profitable solutions. This paper aims to address this challenge by presenting a generic framework and multi-objective optimization formulation for designing cost-effective, circular, and resilient supply chains under uncertainty, implemented through a user-friendly decision-support tool with intuitive data visualization capabilities, enabling communication of results to both technical and non-technical stakeholders. We demonstrate the application of this framework in the context of multilayer plastic films (barrier films), which are widely used in food packaging and composite materials. The model quantifies trade-offs across three objectives: minimizing global warming potential, maximizing circularity, and minimizing cost. A key contribution of this work is the explicit modeling of technological resilience, the ability of supply chains to maintain function under disruption. In the cost-minimization case, the resilience constraint makes the design approximately three times more expensive in the short-term metric, but shifts the system from relying on a single recovery pathway to a portfolio of four recovery pathways, improving the robustness of the optimization solution under uncertainty. Lastly, we introduce TranZero, a decision-support tool that integrates material flow analysis, hotspot identification, and optimization-based scenario planning to support net-zero and circularity decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Local Air Quality Impacts of a Peak-Shaving Diesel Generator Unit in Waynesville, North Carolina

The Waynesville Electric Department in Waynesville, North Carolina, operates a 2,000-kW diesel generator with a 4% capacity factor, emitting less than 1 ton annually of PM2.5, VOCs, carbon monoxide (CO), and sulfur dioxide (SO2), and approximately 1.8 tons of NO. The National Laboratory of the Rockies (NLR) conducted high-resolution, near-source air-quality modeling to evaluate the generator's impacts. Results indicate minimal effects on ambient pollutant concentrations: annual PM2.5 increases are below 0.0004 microgrm/m3 for local census tracts, while CO and SO2 levels increase by less than 0.00004 ppm and 0.0002 ppb, respectively. Estimated annual premature mortality attributable to PM2.5 exposure is less than 0.001 cases across Haywood County, with an associated economic impact of approximately $12,000. This report complements a separate technoeconomic analysis to inform Waynesville's investment strategies for demand reduction.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Energy Technology Innovation Partnership Project (Bilingual)

The U.S. Department of Energy's (DOE) Energy Technology Innovation Partnership Project (ETIPP) helps coastal, remote, and island communities increase the affordability, reliability, and security of their energy systems through energy planning and deep-dive technical assistance. This is a English and Spanish translation.

29 ENERGY PLANNING, POLICY, AND ECONOMY