Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

To Create Space on Earth: The Space Environment Simulation Laboratory and Project Apollo

Few undertakings in the history of humanity can compare to the great technological achievement known as Project Apollo. Among those who witnessed Armstrong#s flickering television image were thousands of people who had directly contributed to this historic moment. Amongst those in this vast anonymous cadre were the personnel of the Space Environment Simulation Laboratory (SESL) at the Manned Spacecraft Center (MSC) in Houston, Texas. SESL houses two large thermal-vacuum chambers with solar simulation capabilities. At a time when NASA engineers had a limited understanding of the effects of extremes of space on hardware and crews, SESL was designed to literally create the conditions of space on Earth. With interior dimensions of 90 feet in height and a 55-foot diameter, Chamber A dwarfed the Apollo command/service module (CSM) it was constructed to test. The chamber#s vacuum pumping capacity of 1 x 10(exp -6) torr can simulate an altitude greater than 130 miles above the Earth. A "lunar plane" capable of rotating a 150,000-pound test vehicle 180 deg replicates the revolution of a craft in space. To reproduce the temperature extremes of space, interior chamber walls cool to -280F as two banks of carbon arc modules simulate the unfiltered solar light/heat of the Sun. With capabilities similar to that of Chamber A, early Chamber B tests included the Gemini modular maneuvering unit, Apollo EVA mobility unit and the lunar module. Since Gemini astronaut Charles Bassett first ventured into the chamber in 1966, Chamber B has assisted astronauts in testing hardware and preparing them for work in the harsh extremes of space.

Walters, Lori C.↗

Design approach for a microprocessor-based GPS time transfer receiver

The design concept and characteristics of a self-contained microprocessor-based Global Positioning System time transfer receiver is described. A prototype of this unit is currently in the test phase. It employs two-bit digital baseband correlation rather than analog IF correlation of the signals with the reference code. The correlator, numerically controlled oscillators and code generator are implemented in a special-purpose digital signal processor. The time is recovered in the digital code tracking loop, and final corrections are applied in the control processor. Other features of this design are: (1) drift-free digital mechanization; (2) high reliability of digital circuits; (3) flexible control capability of the microprocessor; and (4) potential for a high degree of digital VLSI chip development leading to compact, low-cost units.

Ould, P. C.↗

The Perils of Paul: Near Disasters in Airborne Radiochemical Sampling

Beginning with the Trinity test in July 1945, Laboratory radiochemists have collected debris from nuclear tests by various means. At Trinity, two United States Army Sherman tanks were used. Beginning with Operation Crossroads and continuing throughout atmospheric testing, aircraft were used to fly in and around mushroom clouds to collect debris. Paul Guthals, the LASL project leader for sampling operations, flew on many of the B-57 sampling missions. Two such missions, one flown over the Nevada Test and one in the skies near Johnston Atoll, again proved the dangers involved in collecting airborne test debris. The events of these two missions are briefly recounted.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Performance results of a digital test signal generator

Performance results of a digital test signal-generator hardware-demonstration unit are reported. Capabilities available include baseband and intermediate frequency (IF) spectrum generation, for which test results are provided. Repeatability in the setting of a given signal-to-noise ratio (SNR) when a baseband or an IF spectrum is being generated ranges from 0.01 dB at high SNR's or high data rates to 0.3 dB at low data rates or low SNR's. Baseband symbol SNR and carrier SNR (Pc/No) accuracies of 0.1 dB were verified with the built-in statistics circuitry. At low SNR's that accuracy remains to be fully verified. These results were confirmed with measurements from a demodulator synchronizer assembly for the baseband spectrum generation, and with a digital receiver (Pioneer 10 receiver) for the IF spectrum generation.

Gutierrez-Luaces, B. O.↗

Redundancy: How Many Unreliable Spares are Needed for High Reliability and Confidence on a Time Limited Mission?

This paper investigates the number of redundant units needed to achieve high reliability with high confidence. The approach applies to the case where the unit failure rate is too high for a single unit to provide the required reliability over the mission duration. To achieve high reliability, the design then uses N redundant units, one operating unit and N – 1 spares. If the unit failure rate is f, the mission length is L, and f * L is small (not the case assumed here), the unit failure probability over the mission duration is F1 = f * L << 1. In this case, the probability that all N units will fail is FN = F1N, and the needed N = LN(FN)/LN(F1). For the case of large f * L assumed here, F1 = f * L > 1, and F1 is the expected number of failures during the mission. The needed redundancy, N, to achieve the specified N unit reliability, FN, can be computed using the cumulative Poisson distribution with mean equal to F1. The number of spares, N - 1, is increased until the probability - that the total number of failures will be less than N -1 - achieves the required reliability. The confidence that this reliability can be achieved can be computed using the cumulative Poisson distribution or the chi-square distribution. Since the measured unit failure rate, f, has some uncertainty, the confidence that the rate is not lower than the actual failure rate and the required reliability is not overestimated is about 50%. Adding more redundant units increases the confidence that the required reliability, FN, will be achieved. For a fixed number of redundant units, the expected reliability and confidence can be traded off, since lower reliability goals have higher confidence in being achieved. Both the required reliability and confidence can be specified initially and the needed number of redundant units computed using the measured failure rate. The unit failure rate is determined by initial reliability growth testing to remove design errors and to better estimate the final constant failure rate. Reducing the failure rate and reducing its variance both reduce the number of redundant units needed for the required reliability and confidence. Since the total cost is the sum of the costs of the units and of the testing, there is an optimum test time that produces minimum cost.

Harry W. Jones↗

AOI2 - Initial Engineering, Testing, and Design of a Commercial-Scale Postcombustion CO 2 Capture System on an Existing Coal-Fired Generating Unit (Project Carbon)

The continued long-term use of North Dakota lignite is likely dependent on creating a business case for carbon capture, utilization, and storage (CCUS) that also addresses society’s desire to reduce carbon emissions. CCUS coupled with enhanced oil recovery appears to be the most feasible option for utilities to sustain and grow the lignite industry. Establishing a market where lignite-powered utilities provide carbon dioxide (CO 2 ) to oil producers depends upon having a cost-effective method to capture CO 2 . The application of CO 2 capture technology to lignite-fired flue gas has challenges in addition to the cost of capture, including the effects of the buildup of heat-stable salts, aerosol formation, degradation of solvents or solid sorbents, or subsequent solvent loss. Lignite, especially North Dakota lignite, presents its own set of challenges that include the combination of high sodium, sulfur, and ash contents; NO x reduction; and footprint limitations. Project Carbon was designed to address these technical barriers and provide pre-FEED (preliminary front-end engineering and design) information necessary for additional commercial demonstrations to move forward. A long-term pilot-scale evaluation of Mitsubishi Heavy Industries’ (MHI’s) KS-1™ solvent at Minnkota Power Cooperative’s lignite-fired Milton R. Young Station Unit 2 (MRY2) was a major objective of the project. The purpose of the test was to demonstrate the technology’s compatibility with MRY2’s flue gas over an extended period of time. During the long-term test, aerosol sampling and measurement were performed, and a pilot-scale baghouse was tested to determine the effect of bag material and operation on aerosol concentrations in the flue gas. Project engineering and design work were performed to support the other major project objective: a pre-FEED study of CO 2 capture at MRY2. Finally, a techno-economic assessment (TEA) of the application of CO 2 capture to MRY2 was performed. This project was performed over a period of 28 months, with a total budget of $12,700,000. The U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory, through the Energy & Environmental Research Center’s (EERC’s) Cooperative Agreement, the North Dakota Industrial Commission, and industry partners ALLETE and Minnkota Power Cooperative, funded the project. The pilot-scale test system at MRY2 performed very well for the continuous test period of 83 days. The CO 2 capture plant achieved stable operation while utilizing MHI’s KS-1™ solvent and the MHI amine emission reduction unit. No major concerns were encountered when capturing CO 2 from lignite-fired flue gas. Challenges were encountered because the cooling water temperature was warmer than needed for the capture system to operate efficiently. This affected the ability of the solvent to capture CO 2 and promoted solvent loss through solvent entrainment caused by high CO 2 gas temperature within a cyclone separator. The KS-1™ solvent and the lignite-derived flue gas were analyzed during the long-term test. Analysis of the solvent indicates that, although some metals and heat-stable salts increased over the course of the long-term test, they were at levels that can be treated with filtration and reclaiming and do not pose a concern for effective solvent operation. Fourier transform infrared (FTIR) spectrometry was successfully used to determine the composition of the lignite-derived flue gas as well as concentrations of select components of the flue gas at various locations within the EERC’s CO 2 capture system. The formation of aerosols during the capture process is of interest, as are approaches for their reduction, especially in a baghouse. Testing of aerosol removal was performed using the EERC’s portable baghouse. It was found that both Ryton and polytetrafluoroethylene (PTFE) membrane bags were effective at reducing the level of aerosols during steady-state operation. During backpulse events, however, the amount of aerosols passing through the bags was an order of magnitude lower for the Ryton bags than the PTFE membrane bags. The testing showed that proper design of the baghouse air-to-cloth ratio as well as minimization of backpulsing can dramatically reduce the amount of aerosols that pass through the bags and remain in the flue gas stream exiting a baghouse system. A technology maturation plan (TMP) was performed to enable successful development of the Kansai Mitsubishi Carbon Dioxide Recovery® (KM CDR®) Process for application to a combustion flue gas for which the process has not yet been demonstrated. In the TMP, new challenges to the MHI CO 2 capture technology during its application to MRY2 were identified. These challenges included capture from lignite-fired (as opposed to subbituminous coal-fired) flue gas, a larger scope than previous applications of the technology, and implementation in a colder climate that could affect process and equipment operability. Because MRY2 is located where stack icing in the winter could be problematic, a rime icing study was performed. Rime icing modeling indicated that, under both 100% and 50% operating loads, there is a potential for many icing events during any given part of the year in which below-freezing weather conditions exist. The models showed that a critical amount of rime ice could be formed at the stack top during two or more events per year. CO 2 capture plant stack height and location will need to be determined in order to minimize the formation of rime ice. It was found that the integration of the MHI CO 2 capture process into the normal operation of the MRY2 steam turbine is a viable alternative to a cogeneration facility to provide steam and power for the carbon capture facility. The research performed under this project showed that CO 2 capture at a lignite-fired power plant can successfully be performed. No known fatal flaws that would prevent the continued development of the MRY2 CO 2 capture facility were identified during the pre-FEED study. A TEA performed following DOE methodology shows that applying capture technology to MRY2 may not only meet but exceed the DOE-recognized state-of-the-art baseline.

20 FOSSIL-FUELED POWER PLANTS↗

Power Take-off System for Marine Renewable Devices

The Power Take-off (PTO) System for Marine Renewable Devices (Project) envisioned the design, manufacture and testing of a generator that would ultimately be suitable for fully flooded seawater operation. This would require a generator design and bearing system capable of operating in the presence of seawater without corrosion. The original generator concept design focused on a switched reluctance electromagnetic design for the generator with the understanding that the switched reluctance design would be more robust and tolerant of a seawater medium. A trade study was conducted to prove that hypothesis, but the results of the study indicated that there was no benefit to adopting a switched reluctance design over a more conventional synchronous permanent magnet design. In addition, the novelty of the switched reluctance design added more technical risk to the Project than was warranted. ORPC’s cost of energy analyses pointed to reliability as being the most critical factor for achieving Project systems performance advancement (SPA) metrics. Consequently, the choice of a permanent magnet (PM) machine design over a potentially less reliable switched reluctance design was necessary to achieve the Project results. As a result, ORPC determined that a PM design was a more appropriate design to achieve the Project goals and ORPC selected a highly qualified PM generator firm for the design, manufacture and factory testing of the generator. The factory acceptance test (FAT) of the generator took place on March 20-22, 2017 and all tests were successfully passed. Developing a design for a driveline as part of the PTO system required a full understanding of the loads and operating conditions expected. Detailed analyses for developing turbine loads and subsequent definition of bearing specifications were performed using various analytical methods. Two candidate bearing designs were proposed as part of the Project. After initial design work had been completed, ORPC designed a representative full-scale driveline to validate the detailed design of the advanced driveline components. Full-scale components were manufactured, instrumented and tested, simulating actual system parameters. This full-scale bearing test was conducted at the University of Maine Advanced Structures and Composites Laboratory. The purpose of this test was to characterize the frictional losses associated with bearings and test the suitability and functionality of some commercially available shaft couplings and expansion bushings in cross-flow turbine drivelines. In parallel with component testing and dynamometer testing of the PTO system, ORPC performed design work to demonstrate how the advanced PTO system will be integrated with all ORPC turbine generator units (TGUs). The work would focus primarily on the TidGen® TGU and assess how the advanced PTO would be integrated into TidGen® 001 or other units, then field-deployed and tested in an open water environment under actual operational conditions. In addition to the benefits provided to the MHK industry in general, and ORPC in particular, the Project provided benefits to the general public, including the following: • Increased general awareness of the potential for generation of electricity from ocean energy resources • Demonstrated continuing advancements in the commercialization of MHK technologies, making them more likely to contribute to the electricity generation supply in America in the coming years • Continued awareness of the local economic benefits from the MHK industry through job creation and local spending • Confirmation of a path to improvements in availability, power-to-weight ratio (PWR) and reduction in levelized cost of energy (LCOE). All Project tasks were completed, and the Project objectives were accomplished. All project milestones and deliverables were met. The designs, methodologies, practices, testing, data, analysis and lessons learned from the Project are a step forward in the development of the U.S. MHK industry and provide a sound basis for ultimate commercialization of ORPC’s power systems. Based on the what was learned and demonstrated during the Project, ORPC has determined that the ORPC power systems have the potential of accelerating the commercialization of tidal and ocean current MHK power systems.

16 TIDAL AND WAVE POWER↗

The new Section 23 of DO160C/ED14C lightning testing of externally mounted electrical equipment

The new Section 23 is introduced which has only very recently been fully approved by the RTCA for incorporation into the first revision of DO160C/ED14C. Full threat lightning direct effects testing of equipment is entirely new to DO160, the only existing lightning testing is transient testing for LRU's (Line Replaceable Units) by pin or cable bundle injection methods, for equipment entirely contained within the airframe and assumed to be unaffected by direct effects. This testing required transients of very low amplitude compared with lightning itself, whereas the tests now to be described involve full threat lightning testing, that is using the previously established severe parameters of lightning appropriate to the Zone, such as 200 kA for Zone 1A as in AC20-136. Direct effects (i.e., damage) testing involves normally the lightning current arc attaching to the object under test (or very near to it) so submitting it to full potential for the electric, mechanical, thermal and shock damage which is caused by high current arcing. Since equipment for any part of the airframe require qualification, tests to demonstrate safety of equipment in fuel vapor regions of the airframe are also included.

Burrows, B. J. C.↗

Feasibility Assessment of Thermal Barrier Seals for Extreme Transient Temperatures

The assembly joints of modem solid rocket motor cases are generally sealed using conventional O-ring type seals. The 5500+ F combustion gases produced by rocket motors are kept a safe distance away from the seals by thick layers of phenolic insulation. Special compounds are used to fill insulation gaps leading up to the seals to prevent a direct flowpath to them. Design criteria require that the seals should not experience torching or charring during operation, or their sealing ability would be compromised. On limited occasions, NASA has observed charring of the primary O-rings of the Space Shuttle solid rocket nozzle assembly joints due to parasitic leakage paths opening up in the gap-fill compounds during rocket operation. NASA is investigating different approaches for preventing torching or charring of the primary O-rings. One approach is to implement a braided rope seal upstream of the primary O-ring to serve as a thermal barrier that prevents the hot gases from impinging on the O-ring seals. This paper presents flow, resiliency, and thermal resistance for several types of NASA rope seals braided out of carbon fibers. Burn tests were performed to determine the time to burn through each of the seals when exposed to the flame of an oxyacetylene torch (5500 F), representative of the 5500 F solid rocket motor combustion temperatures. Rope seals braided out of carbon fibers endured the flame for over six minutes, three times longer than solid rocket motor burn time. Room and high temperature flow tests are presented for the carbon seals for different amounts of linear compression. Room temperature compression tests were performed to assess seal resiliency and unit preloads as a function of compression. The thermal barrier seal was tested in a subscale "char" motor test in which the seal sealed an intentional defect in the gap insulation. Temperature measurements indicated that the seal blocked 2500 F combustion gases on the upstream side with very little temperature rise on the downstream side.

Steinetz, Bruce M.↗

Virtex-II Pro PowerPC SEE Characterization Test Methods and Results

The Xilinx Vix-11 Pro is a platform FPGA that embeds multiple microprocessors within the fabric of an SRAM-based reprogrammable FPGA. The variety and quantity of resources provided by this family of devices make them very attractive for spaceflight applications. However,these devices will be susceptible to single event effects (SEE), which must be mitigated. Observations from prior testing of the Xilinx Virtex-II Pro suggest that the PowerPC core has significant vulnerability to SEES. However, these initial tests were not designed to exclusively target the functionality of the PowerPC, therefore making it difficult to distinguish processor upsets from fabric upsets. The main focus of this paper involves detailed SEE testing of the embedded PowerPC core. Due to the complexity of the PowerPC, various custom test applications, both static and dynamic, will be designed to isolate each Unit of the processor. Collective analysis of the test results will provide insight into the exact upset mechanism of the PowerPC. With this information, mitigations schemes can be developed and tested that address the specific susceptibilities of these devices. The test bed will be the Xilinx SEE Consortium Virtex-II Pro test board, which allows for configuration scrubbing, design triplication, and ease of data collection. Testing will be performed at the Indiana University Cyclotron Facility using protons of varying energy levels and fluencies. This paper will present the detailed test approach along with the results.

Petrick, David↗

Restore-L Satellite Servicing Internship Final Report

An experiment was conducted to determine whether a sample of shorter flexible metal hoses could sustain tensile loads of up to 200 lbf and continue to meet the minimum mission requirements. The purpose of this experiment was to determine if tension loads during the processing of the hoses compromise performance. With this information, it will be decided whether the flight flex-hose manufacturer should proceed with the testing of the full-scale flex-hoses. To reduce the time and funding required for this test, a test fixture was designed and assembled in the Engineering Development & Operations (EDO) test facility. In this test fixture, two Engineering Development Unit (EDU) flex-hoses were loaded with free floating weights up to 350 lbf. A load of 200 lbf equates to the maximum expected loading with a margin of safety, thus all data recorded after 200 lbf was purely for reference. Measurements were taken using a tape measure and a custom datum measurement system to record the loaded and unloaded length of each flex-hose at various loads. Any permanent stretching beyond a 1/8th of an inch was indicative of inelastic yielding. The loading of each flex-hose was done with an initial weight 80 lbf and was increased to 100 lbf. Additional loading up to 350 lbf was done by 50 lbf increments thereafter. During the performance of the test, slippage occurred in the mounting of the flex-hoses in the test fixture. The first slippage occurred during the testing of the first flex-hose due to the collar of the flex-hose slipping within the collet of the top Kellem. As a result, the first flex-hose test was terminated early to modify the fixture. Due to the flex-hose not inelastically yielding, the test was repeated on the first flex hose. This test resulted in another instance of slippage in the upper collar of the Kellem due to tape interfering with the securing of a collet around the collar of the flex-hose. The test was then continued with one more slippage of the flex-hose within the collet of the bottom Kellem. Preventive measures were taken for future slippage, and the second hose remained secure during testing.Once the tests were concluded, the elongation of each hose was analyzed for inelastic yielding. Both flex-hoses stretched a measurable and repeatable amount under loading, however, this stretching was recovered once each hose was unloaded. As a result, both EDU flex-hoses did not experience any inelastic yielding during the tension testing. Once received, one additional flex-hose will be tested for yielding, but at the time of this paper, the recommendation is to proceed with testing of the full-scale flex-hoses at the flex-hose manufacturer.

Dziekan, Joseph↗

Improved Creep Testing Approach for Bentonite EBS

In the United States, the nuclear reactor contributes 18.7 percent of the nation’s total electricity generation and produces a significant amount of spent nuclear fuel (SNF) and high-level waste. Because SNF is being stored for longer periods than initially envisioned, the U.S. Department of Energy Office of Nuclear Energy, Office of Spent Fuel and Waste Science and Technology is assessing the technical performance of the SNF storage systems after extended durations. The concept of a sustainable geologic repository for SNF disposal relies heavily on the safety provided by multiple barriers, such as repository host rock, overlying rock formation, and human-made engineered barrier systems (EBS). One of the major components of EBS is bentonite-based buffer materials that isolate the nuclear-waste canisters from the host rock and fill the void left in the horizontally drilled boreholes. The resaturated bentonite has a swelling characteristic, which is useful for self-sealing the microcracks in the host rock and supporting the canister’s heavy weight. However, factors such as nonuniformity in the saturation, swelling pressure of bentonite, and the high temperature at the canister-bentonite interface may lead to instability of the waste canister inside the borehole. Therefore, evaluating the long-term deformation of bentonite-based material is necessary. RESPEC Company, LLC recently completed a preliminary study for the U.S. Department of Energy (DE SC0022804) that is attempting to understand the time-dependent deformation in the consolidated sand/bentonite (SB) specimens through triaxial creep experiments and improve the understanding of EBS performance under anticipated repository conditions. The project included developing a standard testing procedure for preparing the consolidated core specimen from a mixture of sand and bentonite in a 50:50 ratio by weight, fabricating a new pressure vessel in-house, modifying existing creep equipment to perform triaxial creep experiments on consolidated SB specimens, and performing six long-term triaxial creep experiments under low-deviatoric stress at two different temperature conditions, which is representative of hypothetical conditions that might be encountered in a geologic repository within a reasonable rate of success in completing creep experiments. The consolidated SB specimen was prepared using the novel specimen preparation procedure and had physical characteristics (e.g., moisture content and bulk density) reasonably comparable with the properties of bentonite-based buffer, which is proposed to be used in the EBS in the Swedish KBS-3H design and the Swiss design of SNF disposal in the horizontal drifts. The newly fabricated pressure vessel could withstand the confining pressure of up to 15 megapascals (MPa) while maintaining the test temperature of up to 90 degrees Celsius (°C) for long-term creep experiments. The preliminary results from the triaxial creep experiments suggested that the consolidated SB specimen may experience time-dependent deformation at a low-deviatoric stress state and room temperature condition. Based on the deformation recorded in the SB specimen from axial and radial linear variable differential transformers (LVDTs) and physical characteristic changes, it is apparent that the time-dependent deformation is a combination of consolidation and creep, which is influenced by the level of deviatoric stresses and temperature. The systematic creep testing of bentonite-based specimens helped develop a standard testing procedure applicable for analyzing the similar characteristics of shale or clay-like materials in different geologic conditions outside repository science, including in civil engineering and infrastructure projects, underground and open pit mining, and deep drilling.

58 GEOSCIENCES↗

Final Report on Reservoir Modeling (SECARB Phase III Work Product 4.2.4.c)

The SECARB Partnership Anthropogenic Test, located in the Southeast Unit of the Citronelle oilfield will inject CO 2 into the saline waters of the Cretaceous Paluxy sandstone formation for three years. In order to accurately model the injection, migration, and long-term fate of CO 2 in the subsurface, GEM, a Computer Modeling Group software program for transport and geochemical modeling, was selected for the simulation. GEM is a very robust compositional reservoir simulator, with all the necessary options available for modeling CO 2 trapping mechanisms (including solubility, residual gas and mineralization). This simulation tool is widely known and used in the petroleum and sequestration industries. A reservoir model was built, based on a previously developed comprehensive picture of the subsurface geology at the site (Work Product 4.2.1.d - Report on Subsurface Characterization for the Anthropogenic Test Project Site). This report describes in details the different inputs that were used to create the model as well as the results of the injection scenario in terms of achievable injection rates, plume extent and pressure response.

01 COAL, LIGNITE, AND PEAT↗

Coupled chemical–CFD modeling of unsealed dry storage of advanced test reactor spent fuel

We report given the current lack of long-term disposal for spent nuclear fuel storage in the United States, the current inventory of advanced test reactor (ATR) fuel at Idaho National Laboratory (INL) is expected to be stored in a dry storage facility for an extended storage period. As part of an effort to understand the conditions during a 50-year period, a three-dimensional computational fluid dynamics (CFD) of the unsealed canisters packed with spent fuel in the storage facility was constructed, this CFD model is coupled with radiolytic chemical reactions associated with water vapor and other species. The coupled model is simulated over a range of sensitivity parameters for the fuel decay heat, relative humidity, and oxyhydroxide film thickness for undried and fully-dried fuel. The most important parameter was the initial fuel decay heat. Over the range of cases, the hydrogen and nitric acid concentrations are low enough no significant impact is expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced life support control/monitor instrumentation concepts for flight application

Development of regenerative Environmental Control/Life Support Systems requires instrumentation characteristics which evolve with successive development phases. As the development phase moves toward flight hardware, the system availability becomes an important design aspect which requires high reliability and maintainability. This program was directed toward instrumentation designs which incorporate features compatible with anticipated flight requirements. The first task consisted of the design, fabrication and test of a Performance Diagnostic Unit. In interfacing with a subsystem's instrumentation, the Performance Diagnostic Unit is capable of determining faulty operation and components within a subsystem, perform on-line diagnostics of what maintenance is needed and accept historical status on subsystem performance as such information is retained in the memory of a subsystem's computerized controller. The second focus was development and demonstration of analog signal conditioning concepts which reduce the weight, power, volume, cost and maintenance and improve the reliability of this key assembly of advanced life support instrumentation. The approach was to develop a generic set of signal conditioning elements or cards which can be configured to fit various subsystems. Four generic sensor signal conditioning cards were identified as being required to handle more than 90 percent of the sensors encountered in life support systems. Under company funding, these were detail designed, built and successfully tested.

Heppner, D. B.↗

Drag Coefficient Analysis of Arbitrary Fragment Geometry with Emphasis on Meshing Sensitivity Studies.

This report characterizes Mach number effects in the hypersonic range from Mach 3 to Mach 7 for an arbitrary, computationally generated fragment. Force and moment coefficients in the x, y, z direction were successfully obtained and resulting trends were compared with theoretical expectations. Three orientations were tested in the form of unit vectors: [1,0,0], [0,1,0], and [0,0,1]; these represent the i, j, k principle axes. The final results ultimately showcased a trend very similar to that shown in previous literature — drag coefficients for a given orientation decreased with increasing Mach number by a very small amount in the hypersonic range. It was therefore concluded that the aerodynamic quantities used to obtain the fragment trajectory at low hypersonic Mach numbers (such as Mach 3) can be used to characterize the aerodynamic qualities at higher hypersonic Mach numbers (Mach 5, 7) with a reasonably small margin. A sensitivity study was also conducted which ultimately defined drag effects as a result of changing grid spacing and normal extrusion parameters for the unstructured tetrahedral mesh used in the simulation. Further work can be done in the form of experimental validation, specifically with regards to wind tunnels and ballistic range testing. Error can be reduced by testing more mesh variabilities and capturing a larger amount of fragment orientations. The results for force and moment characteristics dependent on meshing parameters and high Mach numbers are satisfactory and consistent with expected trends.

42 ENGINEERING↗

Oak Ridge Response to Versatile Test Reactor Environmental Impact Statement Data Request

The Versatile Test Reactor (VTR) is a fast-spectrum test reactor being developed in the United States under the direction of the US Department of Energy Office of Nuclear Energy (DOE-NE). The VTR mission is to enable accelerated testing of advanced reactor fuels and materials required for advanced reactor technologies. The conceptual design of the 300 MWth sodium-cooled metallic-fueled pool-type fast reactor has been led by the US National Laboratories in collaboration with General Electric–Hitachi and Bechtel National, Inc. In support of the VTR project, DOE issued a Notice of Intent (NOI) in the Federal Register on August 5, 2019, announcing the intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) and its implementing regulations. The EIS will evaluate alternatives for a versatile reactor–based fast-neutron source facility and associated facilities for the preparation, irradiation, and post-irradiation examination (PIE) of test/experimental fuels and materials. Specifically, the NOI identified two siting alternatives for the VTR reactor facility: Idaho National Laboratory (INL) or Oak Ridge National Laboratory (ORNL). In addition, the NOI also specified two siting alternatives for VTR fuel fabrication: INL and the Savannah River Site (SRS). This report provides information in response to data requests made to ORNL to fill in site-specific knowledge gaps to develop a high-quality EIS. The responses provided are not required to provide full details in every aspect; instead, they adequately bound possible environmental impacts or provide sufficient information to adequately assess likely environmental impacts. This work is being performed under a subcontract from INL to ORNL using DOE-NE funds and is directed by DOE-NE and DOE-ID. Leidos has been contracted by DOE-NE to write the VTR EIS, so most data requests have come from Leidos but were often routed through INL or DOE-ID. DOE-ID is overseeing the NEPA and EIS processes for the VTR project. Leidos will use the information provided in this report to inform the VTR EIS and will also cite this document to establish a clear, publicly available source of the information. Section 2 of this report briefly describes the proposed ORNL VTR Alternative and illustrates the location of the proposed site for the ORNL VTR Alternative. Sections 3 through 7 provide direct responses to data requests received by ORNL. These sections use a tabular format in which data requests are divided into separate items to be addressed; the items are numbered, the data requests are restated with more topical information included, and then the responses are provided. Initial data requests and follow-on requests for additional information (RAIs) are combined under the original data request fields. Finally, Section 8 presents summarized conclusions and describes future work.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Check out of rebuilt optical cross-beam units

Preliminary evaluations of limited cross beam data taken with the rebuilt optical cross beam units at the Gun Barrel Hill Test Site of ESSA are presented. The evaluations were made using the analogue Princeton Time Correlator. A study of these evaluations indicates that the rebuilt units are performing satisfactorily. However, there are indications that, in order to obtain useful information from the cross-correlations, it is essential to make judicious choices of computation time and frequency band pass filtering for the analysis of the data.

Huff, L. L.↗