Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WBS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Orbit transfer vehicle engine study. Volume 3: Program costs

Budgetary and planning cost estimates are presented that were prepared for the development, production and operation and flight support phases for each of the engines proposed for OTV propulsion. The major features of each category engine are described. The development program estimates were structured to the preliminary program Work Breakdown Structures (WBS). Program costs are provided within the applicable WBS elements to Level 4 for each category engine. The production program cost estimates assume a first production lot of 50 units produced at a rate of two units per month. Cumulative average unit costs assume a 90% learning capability. The operations and flight support cost estimates are based on 15, 30 and 45 missions per year for the period 1988 through 1999. Estimated funding requirements were developed for each category and program phase. All cost estimates and funding data are presented in 1979 dollars. The assumptions and ground rules for these estimates are summarized.

Source record↗

Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

Source record↗

The work breakdown structure in software project management

A work breakdown structure (WBS) is defined as an enumeration of all work activities in hierarchic refinement of detail which organizes work to be done into short manageable tasks with quantifiable inputs, outputs, schedules, and assigned responsibilities. Some of the characteristics and benefits of the WBS are reviewed, and ways in which these can be developed and applied in software implementation projects are discussed. Although the material is oriented principally toward new-software production tasks, many of the concepts are applicable to continuing maintenance and operations tasks.

Tausworthe, R. C.↗

Resourcee Escalation and Cost Analysis

Resource Escalation and Cost Analysis Program (RECAP) is cost compilation program for any project organized in work breakdown structure (WBS) format. In WBS at the high level includes those activities at lower level, so each activity at high level includes those activities at lower level. Permits the organization of activities into classes and subclasses.

Wood, D. A.↗

Space Station needs, attributes and architectural options, volume 2, book 3: Cost and programmatics

The cost and programmatic considerations which integrate mission requirements and architectural options into a cohesive system for exploitation of space opportunities within affordable limits are discussed. The mission requirements, baseline architecture, a top level baseline schedule, and acquisition costs are summarized. The work breakdown structure (WBS) used to structure the program, and the WBS dictionary are included. The costing approach used, including the operation of the primary costing tool, the SPACE cost model are described. The rationale for the choice of cost estimating relationships is given and costs at the module level are shown. Detailed costs at the subsystem level are shown. The baseline schedule and annual funding profiles are provided. Alternate schedules are developed to provide different funding profiles. Alternate funding sources are discussed and foreign and contractor participation is outlined. The results of the benefit analysis are given and the accrued benefits deriving from an implemented space station program are outlined.

Source record↗

GPACC program cost work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 3

The results of detailed cost estimates and economic analysis performed on the updated Model 101 configuration of the general purpose Aft Cargo Carrier (ACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the ACC on the Space Transportation System (STS). The detailed cost estimates for the ACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/ACC launch vehicle cost impacts for delivering payloads to a 160 NM low Earth orbit (LEO).

Source record↗

DACC program cost and work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 2

Results of detailed cost estimates and economic analysis performed on the updated 201 configuration of the dedicated Aft Cargo Carrier (DACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the DACC on the Space Transportation System (STS). The detailed cost estimates for the DACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/DACC launch vehicle cost impacts for delivering an orbital transfer vehicle to a 120 NM low Earth orbit (LEO).

Source record↗

Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks

Root Source Analysis (RoSA) is a systems engineering methodology that has been developed at NASA over the past five years. It is designed to reduce costs, schedule, and technical risks by systematically examining critical assumptions and the state of the knowledge needed to bring to fruition the products that satisfy mission-driven requirements, as defined for each element of the Work (or Product) Breakdown Structure (WBS or PBS). This methodology is sometimes referred to as the ValuStream method, as inherent in the process is the linking and prioritizing of uncertainties arising from knowledge shortfalls directly to the customer's mission driven requirements. RoSA and ValuStream are synonymous terms. RoSA is not simply an alternate or improved method for identifying risks. It represents a paradigm shift. The emphasis is placed on identifying very specific knowledge shortfalls and assumptions that are the root sources of the risk (the why), rather than on assessing the WBS product(s) themselves (the what). In so doing RoSA looks forward to anticipate, identify, and prioritize knowledge shortfalls and assumptions that are likely to create significant uncertainties/ risks (as compared to Root Cause Analysis, which is most often used to look back to discover what was not known, or was assumed, that caused the failure). Experience indicates that RoSA, with its primary focus on assumptions and the state of the underlying knowledge needed to define, design, build, verify, and operate the products, can identify critical risks that historically have been missed by the usual approaches (i.e., design review process and classical risk identification methods). Further, the methodology answers four critical questions for decision makers and risk managers: 1. What s been included? 2. What's been left out? 3. How has it been validated? 4. Has the real source of the uncertainty/ risk been identified, i.e., is the perceived problem the real problem? Users of the RoSA methodology have characterized it as a true bottoms up risk assessment.

Brown, Richard Lee↗

Examining the Trends in Financial Support Given to Science Teams for Data Analysis in Mission Proposals

Introduction: The goal of this summer internship research project was to analyze trends in financial support proposed for the science teams of planetary missions. The analysis focuses on the funding for Co-Investigators (Co-Is) to conduct research and/or data analysis needed to achieve the science objectives of the mission. The operational portion of the missions after launch (i.e., Phase E, including cruise and prime operations at the final destination) were examined since that is when the bulk of research is funded and conducted. The objectives of the project were to determine the average level of support for Co-Investigators, identify variation between mission competitions and over time, and determine the relationship between mission type and the amount of support requested. Methodology: This project was conducted using data from 90 proposals submitted to six mission competitions in the Discovery and New Frontiers programs. The level of support for Co-Is was determined by examining Work Breakdown Structure (WBS) 4 (Science Analysis) for Phase E, which was further subdivided into cruise and prime operations. This data represents a proxy rather than the actual funding Co-Is receive to perform research and data analysis because not every dollar in WBS 4 is spent on this activity. Therefore, the proxy obtained in this research represents an overestimate of the funds allocated to Co-Is for research and data analysis. Findings: Analysis shows that on average a Co-I receives approximately four full years of support spread across the entirety of Phase E for science analysis. The variation among proposed missions is less than expected given the variety of factors that are expected to drive this metric (length of mission, mission type, etc.). Additionally, the level of requested support for Co-Is has been remarkably consistent across every variable considered (by competition, over time, by mission type) over the six competitions and nearly 20 years spanned by this project. This remains true for cruise, primary operations, and all of Phase E. Conclusions: A remarkable amount of science is accomplished by the science teams of planetary missions. However, a surprisingly small amount of funding is requested to support the science analysis driving this productivity, both in terms of absolute magnitude of funding and as a portion of total mission cost. This suggests improvements are needed to refine the estimates of Co-I support and/or that Co-Is rely on other funding sources to conduct their research. Better estimates can be determined by engaging directly with Co-Is and NASA centers to obtain data as well as finding other data sources. Additionally, NASA could consider mandating improved reporting of requested funding levels in mission competitions.

E Murray↗

Complete Degradation of Be 2 C at Conditions Expected in Molten Salt Environments

This technical report is in submission of completion of the Level 3 milestone number M3AT24OR1101032, titled “Complete Degradation of Be 2 C at conditions expected in molten salt environments,” for the AT-24OR110103 “Beryllium Carbide as moderator for MSRs—ORNL” WBS number 2.04.11.01 within the larger Advanced Reactor Technologies program at Oak Ridge National Laboratory. This effort is an initial study of the viability of Be 2 C as a future neutron moderator for molten salt reactors and other high-temperature reactors. The research was awarded funding in September 2022, and this Level 2 milestone presents the work that completed by the end of July 2023. This work is a collaboration between Oak Ridge National Laboratory and the University of Michigan. This report discusses the status of this effort and planned work before the final reporting.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Final Report on Predictive Analyses of PRD as Function of Anomalies

This report summarizes the work completed in FY-2024 to analyze the power reactivity decrement (PRD) concepts of the ARC-100 core. The PRD has been traditionally defined by the reactivity change from a hot zero power (HZP) to a particular power. Consequently, the PRD accounts for the core reactivity changes due to increase coolant temperature gradient axially and radially across the core, and increased fuel temperature. The coolant temperature gradient leads to sodium and structure density changes, to radial core expansion from assembly flowering and bowing (due to axial and radial temperature gradients within the assemblies), and to control rod driveline thermal expansion. The fuel temperature increase associated with coolant temperature and power increases leads to Doppler effect and axial thermal expansion. In this work, the normal operating Hot Full Power (HFP) state is the only power level of interest, so analyses focus on the PRD calculated from HZP to HFP. The PRD has been used to assess the reactor safety features asymptotically in unprotected accident scenarios, including the loss of heat sink (LOHS), loss of flow (LOF), and transient overpower (TOP) without scram. The PRD concept relies on the “global” reactivity coefficients A, B, and C that are estimated based on “individual” reactivity effects (Doppler, sodium density, etc.). The objectives of this work are: 1) to improve and verify the methodology used to calculate the ABC coefficients used in the PRD, 2) to assess if the PRD can be used to reliably identify abnormal events. This report fulfills the FY-2024 scope of WBS#1.15.8.3 activity, “ANL0120 – Predictive Analyses of PRD as function of deformation”. The PRD concept is described in Sections 2. Additional effort in refining the methodology for core bowing modeling is performed in Sections 3. Then, two verification exercises are proposed in Section 4 to benchmark these coefficients based on direct neutronic-only calculations and on dynamic core transient simulations. Finally, the PRD approach is assessed for the detection of several unexpected events, such as primary flow perturbation or improper fuel loading, in Section 5.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

Degradation of Be 2 C at conditions expected in molten salt environments

This technical report is in submission of completion of the Level 4 milestone number M4AT-25OR1101021, titled “Degradation of Be 2 C at conditions expected in molten salt environments”, for the AT-25OR110102 “Beryllium Carbide as moderator for MSRs—ORNL” WBS number 2.04.11.01 within the larger Advanced Reactor Technologies program at Oak Ridge National Laboratory. This effort is an initial study of the viability of Be 2 C as a future neutron moderator for molten salt reactors and other high-temperature reactors. The research was awarded funding in September 2022, and this Level 4 milestone presents the work that completed by the end of July 2025. This work is a collaboration between Oak Ridge National Laboratory and the University of Michigan.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tug fleet and ground operations schedules and controls. Volume 3: Program cost estimates

Cost data for the tug DDT&E and operations phases are presented. Option 6 is the recommended option selected from seven options considered and was used as the basis for ground processing estimates. Option 6 provides for processing the tug in a factory clean environment in the low bay area of VAB with subsequent cleaning to visibly clean. The basis and results of the trade study to select Option 6 processing plan is included. Cost estimating methodology, a work breakdown structure, and a dictionary of WBS definitions is also provided.

Source record↗

The northern Utah satellite (NUSAT) communications link

During the planning Stages of the NUSAT satellite, an obvious issue to be discussed was the method of communications to be used. The frequencies would have to be high enough to pass through the atmosphere relatively unattenuated but low enough that antennas and transmission lines would not be so critical in length and properties that unexperienced students would have difficulty with handling them. In conversations with the Federal Communications Commission (FCC) in Washington D.C., the frequencies of 450.000 MHz and 137.900 MHz were decided upon and applied for licensing. The 450.000 MHt up-link is used on a "non-interference" basis to control the satellite while the 137.900 MHz frequency down-links data from the satellite. A reasonable amount of time was spent discussing the mods of transmission to be used in communication with the satellite. Representatives of the amateur radio satellite organization, AMSAT, were contacted for ides. This organization seems to favor AM types of emissions such as CW to control their OSCAR series of satellites and also the current Phase 111 unit. NUSAT personnel felt, however, that there would be merit in the improved signal to noise ratio usually obtained in an FM mode. Doppler shift of the transmitted information on the NUSAT also had to be considered. The final decision WBS to use Audio Frequency Shift Keying (AFSK) modulated on an FM carrier. In this mode the audio tones used would not shift frequency with Doppler - only the carrier would shift in frequency. If necessary, the receivers could be fitted with a form of AFC control or simply have enough bandwidth to handle the Doppler shift with an acceptable increase in noise.

Lee Barrett↗

Study of selected tether applications in space, phase 3, volume 2

The results of a Phase 3 study of two Selected Tether Applications in Space (STAIS); deorbit of a Shuttle and launch of an Orbital Transfer Vehicle (OTV), both from the space station using a tether were examined. The study objectives were to: perform a preliminary engineering design, define operational scenarios, develop a common cost model, perform cost benefits analyses, and develop a Work Breakdown Structure (WBS). Key features of the performance analysis were to identify the net increases in effective Shuttle cargo capability if tethers are used to assist in the deorbit of Shuttles and the launching of the OTVs from the space station and to define deployer system designs required to accomplish these tasks. Deployer concepts were designed and discussed. Operational scenarios, including timelines, for both tethered and nontethered Shuttle and OTV operations at the space station were evaluated. A summary discussion of the Selected Tether Applications Cost Model (STACOM) and the results of the cost benefits analysis are presented. Several critical technologies needed to implement tether assisted deployment of payloads are also discussed. Conclusions and recommendations are presented.

Source record↗

Test results on re-use of reclaimed shower water: Summary

A microgravity whole body shower (WBS) and waste water recovery systems (WWRS) were evaluated in three separate closed loop tests. Following a protocol similar to that anticipated for the U.S. Space Station, test subjects showered in a prototype whole body shower. The WWRS processes evaluated during the test series were phase change and reverse osmosis (RO). A preprototype Thermoelectric Integrated Hollow Fiber Membrane Evaporation Subsystem phase change process was used for the initial test with chemical pretreatment of the shower water waste input. The second and third tests concentrated on RO technologies. The second test evaluated a dynamic RO membrane consisting of zirconium oxide polyacrylic acid (ZOPA) membranes deposited on the interior diameter of 316L porous stainless steel tubes while the final test employed a thin semipermeable RO membrane deposited on the interior surface of polysulfone hollow fibers. All reclaimed water was post-treated for purity using ion exchange and granular activated carbon beds immediately followed by microbial control treatment using both heat and iodine. The test hardware, controls exercised for whole body showering, types of soaps evaluated, shower subject response to reclaimed water showering, and shower water collection and chemical pretreatment (if required) for microbial control are described. The WWRS recovered water performance and the effectiveness of the reclaimed water post-treatment techniques used for maintaining water purity and microorganism control are compared. Results on chemical and microbial impurity content of the water samples obtained from various locations in the shower water reuse system are summarized.

Verostko, C. E.↗

NASP aeroservothermoelasticity studies

Some illustrative results obtained from work accomplished under the aerothermoelasticity work breakdown structure (WBS) element of the National Aerospace Plane (NASP) Technology Maturation Program (TMP) are presented and discussed. The objectives of the aerothermoelasticity element were to develop analytical methods applicable to aerospace plane type configurations, to conduct analytical studies to identify potential problems, to evaluate potential solutions to problems, and to provide an experimental data base to verify codes and analytical trends. Work accomplished in the three areas of experimental data base, unsteady aerodynamics, and integrated analysis methodology are described. Some of the specific topics discussed are: (1) transonic wind tunnel aeroelastic model tests of cantilever delta wing models, of an all-moveable delta-wing model, and of aileron buzz models; (2) unsteady aerodynamic theory correlation with experiment and theory improvements; and (3) integrated analysis methodology results for thermal effects on vibration, for thermal effects on flutter, and for improving aeroelastic performance by using active controls.

Doggett, Robert V., Jr.↗