Orbit transfer vehicle engine study. Volume 3: Program costs

Abstract

Budgetary and planning cost estimates are presented that were prepared for the development, production and operation and flight support phases for each of the engines proposed for OTV propulsion. The major features of each category engine are described. The development program estimates were structured to the preliminary program Work Breakdown Structures (WBS). Program costs are provided within the applicable WBS elements to Level 4 for each category engine. The production program cost estimates assume a first production lot of 50 units produced at a rate of two units per month. Cumulative average unit costs assume a 90% learning capability. The operations and flight support cost estimates are based on 15, 30 and 45 missions per year for the period 1988 through 1999. Estimated funding requirements were developed for each category and program phase. All cost estimates and funding data are presented in 1979 dollars. The assumptions and ground rules for these estimates are summarized.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1980-07-31. Orbit transfer vehicle engine study. Volume 3: Program costs. https://ntrs.nasa.gov/citations/19800023925

Cite the original work for its findings. Save a collection to share your selection of sources.