GPACC program cost work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 3

Abstract

The results of detailed cost estimates and economic analysis performed on the updated Model 101 configuration of the general purpose Aft Cargo Carrier (ACC) are given. The objective of this economic analysis is to provide the National Aeronautics and Space Administration (NASA) with information on the economics of using the ACC on the Space Transportation System (STS). The detailed cost estimates for the ACC are presented by a work breakdown structure (WBS) to ensure that all elements of cost are considered in the economic analysis and related subsystem trades. Costs reported by WBS provide NASA with a basis for comparing competing designs and provide detailed cost information that can be used to forecast phase C/D planning for new projects or programs derived from preliminary conceptual design studies. The scope covers all STS and STS/ACC launch vehicle cost impacts for delivering payloads to a 160 NM low Earth orbit (LEO).

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1985-05-01. GPACC program cost work breakdown structure-dictionary. General purpose aft cargo carrier study, volume 3. https://ntrs.nasa.gov/citations/19870009157

Cite the original work for its findings. Save a collection to share your selection of sources.