RHIC Recovery Review Report [See also: RHIC Recovery Review - Hybrid Meeting (11/28/2023) - Indico.bnl.gov]
Just after 12:30 PM on August 1, 2023, the RHIC superconducting magnet quench system triggered and consequently the energy dump resistors were switched into the blue ring quad and dipole circuits and the interaction region DX dipole heaters were switched on. This was a spurious trip (there was no actual quench) and was not unusual as the outdoor summer temperature often caused the quench detectors to cause such trips. The collider control room notified the on-duty cryogenics technical staff of the quench trip. A short time later building 1004B cryogenic low-helium and valve box insulation vacuum failure alarms were observed. The cryogenics technical staff observed the cryo-relief line from the blue ring valve box was exhausting helium outside the building.