Engineering PapersSearch

DOE OSTI · 2478256

EMP, Attachment 1: Sampling and Analysis Plan (Rev.1)

Abstract

This Sampling and Analysis Plan (SAP) is written for the Environmental Radiation Task activities related to radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance of Pacific Northwest National Laboratory (PNNL) operations at the PNNL-Richland campus and PNNL-Sequim campus. PNNL is a U.S. Department of Energy Office of Science laboratory in Richland, Washington. This plan is an attachment to PNNL’s Environmental Radiological Air Monitoring Plan (EMP) (PNNL-20919) and addresses a discrete, vital subject area that is subject to revision independent of the main text of the EMP document. This SAP provides the requirements for planning sampling events and the requirements imposed on the services provided by the analytical laboratory to the PNNL Environmental Radiation Task.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Bisping, Lynn E., Ramos Sanchez, Sergio G., Barnett, John M., Snyder, Sandra F.. 2024-11-20. EMP, Attachment 1: Sampling and Analysis Plan (Rev.1). https://doi.org/10.2172/2478256

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2025

This report documents radionuclide air emissions that result in the 2025 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The total dose to the MEI from all PNNL Richland Campus radionuclide emissions in 2025, including fugitive emissions and radon, is 1.8E-05 mrem (1.8E-07 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance. The dose attributable to radon emissions is 1.5E-13 mrem (1.5E-15 mSv) EDE.

40 CFR 61 Subpart H

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2025 : Department of Energy – Office of Science Pacific Northwest National Laboratory

The U.S. Department of Energy Office of Science’s Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Facility operations include radiological operations with the potential-to-emit low levels of radioactive materials. This report is prepared to document compliance with the 40 CFR Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities,” and Washington Administrative Code Chapter 246-247, Radiation Protection–Air Emissions. The PNNL Sequim Campus is in compliance with the federal and state 10 mrem/yr standard for 2025 operations.

40 CFR 61 Subpart H

PNNL Dose-per-Unit-Release Factors for Calculating Radionuclide Emissions Potential-to-Emit Doses

Revised PNNL-Richland campus dose-per-unit release factors based on the Environmental Protection Agency code CAP88-PC Version 4.1.1 code are provided. In addition to maximum receptor dose factors, maximum air concentration dose factors are provided. The PNNL-Sequim campus dose-per-unit release factors are included, as well, based on the Environmental Protection Agency code COMPLY Version 1.7.1.

40 CFR 61 Subpart H