Engineering PapersSearch

Engineering topics

Snyder, Sandra F.

Publications and source records attributed to Snyder, Sandra F..

EMP, Attachment 1: Sampling and Analysis Plan (Rev.1)

This Sampling and Analysis Plan (SAP) is written for the Environmental Radiation Task activities related to radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance of Pacific Northwest National Laboratory (PNNL) operations at the PNNL-Richland campus and PNNL-Sequim campus. PNNL is a U.S. Department of Energy Office of Science laboratory in Richland, Washington. This plan is an attachment to PNNL’s Environmental Radiological Air Monitoring Plan (EMP) (PNNL-20919) and addresses a discrete, vital subject area that is subject to revision independent of the main text of the EMP document. This SAP provides the requirements for planning sampling events and the requirements imposed on the services provided by the analytical laboratory to the PNNL Environmental Radiation Task.

40 CFR 61 Subpart H

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL)-Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems.

54 ENVIRONMENTAL SCIENCES

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H