Engineering Papers⌕ Search

Engineering topics

Barnett, John M.

Publications and source records attributed to Barnett, John M..

At least 19 records

EMP, Attachment 1: Sampling and Analysis Plan (Rev.1)

This Sampling and Analysis Plan (SAP) is written for the Environmental Radiation Task activities related to radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance of Pacific Northwest National Laboratory (PNNL) operations at the PNNL-Richland campus and PNNL-Sequim campus. PNNL is a U.S. Department of Energy Office of Science laboratory in Richland, Washington. This plan is an attachment to PNNL’s Environmental Radiological Air Monitoring Plan (EMP) (PNNL-20919) and addresses a discrete, vital subject area that is subject to revision independent of the main text of the EMP document. This SAP provides the requirements for planning sampling events and the requirements imposed on the services provided by the analytical laboratory to the PNNL Environmental Radiation Task.

40 CFR 61 Subpart H↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL)-Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems.

54 ENVIRONMENTAL SCIENCES↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated off-site doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL–Richland campus) and in Sequim, Washington, (PNNL–Sequim campus). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in January 2024 for calendar year ending 2023.

40 CFR 61 Subpart H↗

EMP, Attachment 2: Data Management Plan

This Data Management Plan (DMP) is an attachment to the Pacific Northwest National Laboratory Environmental Radiological Air Monitoring Plan (EMP). PNNL is a U.S. Department of Energy Office of Science national laboratory. Radioactive effluent monitoring and environmental surveillance for PNNL operations in Washington State are the responsibility of the PNNL Environmental Protection and Regulatory Programs division and are conducted by the Environmental Radiation Task staff. This DMP describes the data management processes for PNNL radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance activities.

40 CFR 61 Subpart H↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2023

This report documents radionuclide air emissions that result in the 2023 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL-Richland campus MEI from routine emissions sources, excluding radon, in 2023 from campus sources is 2.0E-5 mrem (2.0E-7 mSv) EDE. The dose from radon emissions is 4.0E-7 mrem (4.0E-09 mSv) EDE. No nonroutine emissions occurred in 2023. The total radiological dose to the MEI from all PNNL-Richland campus radionuclide emissions, including fugitive emissions and radon, is 2.1E-5 mrem (2.1E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL-Richland campus is in compliance.

40 CFR 61 Subpart H↗

Qualification of Mixing Criteria by Computational Fluid Dynamics Modeling for the 325 Building Stack Revision

Additional ventilation capacity has been designed for the 325 Building filtered exhaust stack system. The four (4) existing main facility exhaust fans are past the end of their useful life. The fans are being replaced to provide additional exhaust capacity for future growth and to provide a more robust system. Stack operations will involve running various fan combinations at any given time. The air monitoring system of the existing stack previously was found to comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard. Full-scale, three-dimensional computational fluid dynamics (CFD) modeling was used to evaluate the modified four-fan system for compliance with the ANSI/HPS N13.1-2021 standard, which essentially is equivalent in mixing requirements to the ANSI/HPS N13.1-1999 standard (and ANSI/HPS N13.1-2011). The four mixing criteria evaluated are 1) flow angle, 2) velocity, 3) gas tracer, and 4) particle tracer. In addition to the evaluating the modified four-fan system a temporary single fan stack configuration was also evaluated with CFD modeling. The temporary stack is planned to be used while the four-fan system is being modified. Modeling of the modified four-fan design and temporary ductwork showed that flow angles, velocity uniformity, gas tracer, and particle tracer were acceptable.

42 ENGINEERING↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2023

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim campus has only fugitive emissions sources.

40 CFR 61 Subpart H↗

PNNL OS3700 Tritium Monitoring System Software and Hardware Operations Manual (Rev.2)

The Pacific Northwest National Laboratory (PNNL) OS3700 Tritium Monitoring System Software and Hardware Operations Manual describes how to install and operate the software and hardware on a personal computer operating in conjunction with the Berthold Technologies LB110 flow-through proportional counter detector system. Included are operational details for the software functions, how to read and use the dropdown menus, how to understand readings and calculations, and how to access the database tables.

54 ENVIRONMENTAL SCIENCES↗

PNNL OS3300 Alpha/Beta Monitoring System Software and Hardware Operations Manual (Rev.2)

The Pacific Northwest National Laboratory (PNNL) OS3300 Alpha/Beta Monitoring System Software and Hardware Operations Manual describes how to operate the software and hardware on a personal computer in conjunction with the Berthold Technologies LB150D continuous air monitor. Included are operational details for the software functions and information about how to read and use the dropdown menus and how to understand readings and calculations.

54 ENVIRONMENTAL SCIENCES↗

Data Quality Objectives Supporting Radiological Air Emissions Monitoring for the PNNL-Richland Campus: North Campus Construction (Rev. 3)

Starting in fiscal year 2023, the north area of the PNNL-Richland Campus will undergo development. Initially, infrastructure (water, electrical) improvements will be installed. Later development includes the construction of several new office buildings. The area to be developed currently contains no buildings but does have two existing solar-powered ambient air sampling stations. Under the requirements of Washington State Department of Health Radioactive Air Emissions License -005, the PNNL-Richland Campus must operate and maintain a radiological air monitoring program. This revision documents and evaluates how the new North Campus construction impacts ambient air surveillance stations within the development region. This revision also considers current stack configurations and uses an updated environmental dispersion model and updated meteorological data. The DQO team concluded that one sampling station in the construction area will be relocated and the other remain in place. The evaluations conducted for this DQO also identified a third sampling station outside the development area that is recommended for relocation as a result of updated dispersion modeling. Recommended sites for the relocations are presented. Considerations for sampling in and around a construction zone are also addressed. Additionally, programmatic improvements to the ambient air sampling program were identified in the DQO process.

54 ENVIRONMENTAL SCIENCES↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2022 (Final Report)

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office (PNSO) oversees PNNL. PNNL prepares this Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, assuring that the public is informed of any PNNL-Richland Campus or PNNL-Sequim Campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur on the PNNL-Richland Campus in Richland, Washington, and at the PNNL-Sequim Campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

PNNL-Richland Campus Radionuclide Air Emissions Report for Calendar Year 2022

This report documents radionuclide air emissions that result in the 2022 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2022 from PNNL Richland Campus sources is 2.1E-5 mrem (2.1E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 9.2E-9 mrem (9.2E-11 mSv) EDE. No nonroutine emissions occurred in 2022. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 2.3E-5 mrem (2.3E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2022

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2022 was 7.5E-07 mrem (7.5E-09 mSv). No non-routine emissions occurred in 2022. The PNNL-Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2021 (Final Report)

The U.S. Department of Energy requires that all its site facilities develop an annual site environmental report to comply with DOE Order 231.1B Chg 1 and DOE Order 458.1 Admin Chg 4. This report provides a synopsis of calendar year 2021 information related to environmental management performance and compliance efforts at the Pacific Northwest National Laboratory. It summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

PNNL Richland Campus Radionuclide Air Emissions Report for Calendar Year 2021

This report documents radionuclide air emissions that result in the 2021 highest effective dose equivalent (EDE) to an offsite member of the public, referred to as the maximally exposed individual (MEI). The report has been prepared in compliance with the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, “Radiation Protection–Air Emissions.” The dose to the PNNL Richland Campus MEI from routine major and minor point source emissions in 2021 from PNNL Richland Campus sources is 1.7E-5 mrem (1.7E-7 mSv) EDE. The dose from all fugitive sources is 1.2E-6 mrem (1.2E-8 mSv) EDE. The dose from radon emissions is 2.1E-9 mrem (2.1E-11 mSv) EDE. No nonroutine emissions occurred in 2021. The total radiological dose to the MEI from all PNNL Richland Campus radionuclide emissions, including fugitive emissions and radon, is 1.8E-5 mrem (1.8E-7 mSv) EDE, or more than 100,000 times less than the federal and state standard of 10 mrem/yr, with which the PNNL Richland Campus is in compliance.

40 CFR 61 Subpart H↗

PNNL Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2021

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2021 was 5.4E-05 mrem (5.4E-07 mSv). No non-routine emissions occurred in 2021. The Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

Qualification of ANSI/HPS N13.1-2011 Mixing Criteria by Computational Fluid Dynamics Modeling for the 3430 Building Fan Addition and Increased Ventilation Capacity

Additional ventilation capacity has been designed for the 3430 Building filtered exhaust stack system. The updated system will increase the number of fans from two to three and include new ductwork with a larger diameter to integrate the new fan into the existing stack. Stack operations will involve running various fan combinations at any given time. The air monitoring system of the existing two-fan stack previously was found to comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard. Full-scale, three-dimensional computational fluid dynamics (CFD) modeling was used to evaluate the modified three-fan system for compliance with the ANSI/HPS N13.1-2011 standard, which essentially is equivalent to the ANSI/HPS N13.1-1999 standard. The four mixing criteria evaluated are 1) flow angle, 2) velocity, 3) gas tracer, and 4) particle tracer. Benchmarking of the CFD modeling methodology showed good agreement with previous testing used to qualify the stack, and modeling of the existing two-fan system showed good agreement with test data collected from the 3430 Building stack. Modeling was performed to develop a suitable three-fan design. Initial modeling of the three-fan design and basic ductwork showed that flow angles and velocity uniformity were acceptable; however, the gas tracer and particle tracer mixing results were not acceptable. To meet ANSI/HPS N13.1-2011 criteria, an air blender was added to the stack design. This revision models the individual maximum fan reduced flow capacity from 38,000 cfm to 31,200 cfm; no changes to the duct design are made.

42 ENGINEERING↗