Spin Resonance Free Electron Ring Injector

We have developed an intrinsic resonance free circular electron accelerator. This lattice could be placed in the existing RHIC tunnel and accelerate electrons from 100 MeV to 20 GeV avoiding all major polarization loss usual in such machines.

43 PARTICLE ACCELERATORS↗

Report on LEReC Recombination Monitor APEX Study on June 15th 2016

During the prospective Low Energy RHIC electron Cooling (LEReC) operation, the electron beam will overlap and interact with the low energy ion beam to provide transverse cooling. Cooling is needed to facilitate reaching the BES-2 (Beam Energy Scan 2) program goals of an average store luminosity of 5 × 10 24 cm -2 s -1 at 3.85 GeV/n and 17.3 × 10 24 cm -2 s -1 at 9.1 GeV/n. The RHIC phase of BES-2 is currently planned for the RHIC runs in 2019 and 2020. Effective cooling will depend on the accuracy of velocity matching between the two beams. Another process, the rate of ion-electron recombination, is also maximized when the velocities are matched, but the exact matching requirement is less stringent. Therefore, as suggested by one of us, detecting and maximizing recombination signals should be helpful in finding the narrow velocity matching window conducive to cooling. When 197 Au 79+ RHIC ions pick up an electron from the LEREeC electron beam they are converted into 197 Au 78+ ions with nearly the same momentum while having about 1.3% higher magnetic rigidity than the original 197 Au 79+ particles. The detection of the recombined ions can be done by driving the 197 Au 78+ beam into the beam pipe wall, creating showers of secondary particles which then can be detected outside the cryostat by using appropriately positioned detectors. For the purpose of forcing losses of the expected off-momentum particles a dedicated lattice with large horizontal dispersion in one arc was proposed and designed.

43 PARTICLE ACCELERATORS↗

Beam energy scan with asymmetric collision at RHIC

A beam energy scan of deuteron-gold collision, with center-of-mass energy at 19.6, 39, 62.4 and 200.7 GeV/n, was performed at the Relativistic Heavy Ion Collider in 2016 to study the threshold for quark-gluon plasma (QGP) production. The lattice, RF, stochastic cooling and other subsystems were in different configurations for the various energies. The operational challenges changed with every new energy. The operational experience at each energy, the operation performance, highlights and lessons of the beam energy scan are reviewed in this report.

43 PARTICLE ACCELERATORS↗

Report of the eRHIC Ring-Ring Working Group

This report evaluates the ring-ring option for eRHIC as a lower risk alternative to the linac-ring option. The reduced risk goes along with a reduced initial luminosity performance. However, a luminosity upgrade path is kept open. This upgrade path consists of two branches, with the ultimate upgrade being either a ring-ring or a linac-ring scheme. The linac-ring upgrade could be almost identical to the proposed linac-ring scheme, which is based on an ERL in the RHIC tunnel. This linac-ring version has been studied in great detail over the past ten years, and its significant risks are known. On the other hand, no detailed work on an ultimate performance ring-ring scenario has been performed yet, other than the development of a consistent parameter set. Pursuing the ring-ring upgrade path introduces high risks and requires significant design work that is beyond the scope of this report.

43 PARTICLE ACCELERATORS↗

Pin diode calibration - beam overlap monitoring for low energy cooling

We were trying to address the question whether or not the Pin Diodes, currently installed approximately 1 meter downstream of the RHIC primary collimators, are suitable to monitor a recombination signal from the future RHIC low energy cooling section. A maximized recombination signal, with the Au+78 ions being lost on the collimator, will indicate optimal Au-electron beam overlap as well as velocity matching of the electron beam in the cooling section.

43 PARTICLE ACCELERATORS↗

RHIC operation with asymmetric collisions in 2015

To study low-x shadowing/saturation physics as well as other nuclear effects [1], [2], proton-gold (p-Au, for 5 weeks) and proton-Aluminum (p-Al, for 2 weeks) collisions were provided for experiments in 2015 at the Relativistic Heavy Ion Collider (RHIC), with polarized proton beam in the Blue ring and Au/Al beam in the Yellow ring. The special features of the asymmetric run in 2015 will be introduced. The operation experience will be reviewed as well in the report.

43 PARTICLE ACCELERATORS↗

Transverse profile of the electron beam for the RHIC electron lenses

To compensate for the beam-beam effects from the proton-proton interactions at the two interaction points IP6 and IP8 in the Relativistic Heavy Ion Collider (RHIC), we are constructing two electron lenses (e-lenses) that we plan to install in the interaction region IR10. Before installing them, the electron gun, collector, instrumentation were tested and the electron beam properties were qualified on an electron lens test bench. We will present the test results and discuss our measurement of the electron beam current and of the electron gun perveance. We achieved a maximum current of 1 A with 5 kV energy for both the pulsed- and the DC-beam (which is a long turn-by-turn pulse beam). We measured beam transverse profiles with an Yttrium Aluminum Garnet (YAG) screen and pinhole detector, and compared those to simulated beam profiles. Measurements of the pulsed electron beam stability were obtained by measuring the modulator voltage.

43 PARTICLE ACCELERATORS↗

Design and test of the RHIC CMD10 abort kicker

In recent RHIC operational runs, planned and unplanned pre-fire triggered beam aborts have been observed that resulted in quenches of SC main ring magnets, indicating a weakened magnet kick strength due to beam-induced ferrite heating. An improvement program was initiated to reduce the longitudinal coupling impedance with changes to the ferrite material and the eddy-current strip geometry. Results of the impedance measurements and of magnet heating tests with CMD10 ferrite up to 190°C are reported. All 10 abort kickers in the tunnel have been modified and were provided with a cooling system for the RUN 15.

43 PARTICLE ACCELERATORS↗