Engineering Papers⌕ Search

Engineering topics

Montag, C.

Publications and source records attributed to Montag, C..

At least 37 records · Page 2

Studies of the Imperfection in Crab Crossing Scheme for Electron-Ion Collider

Crab crossing scheme is the essential scheme that accommodates large crossing angle without loss of luminosity in the design of Electron-Ion collider (EIC). The ideal optics and phase advances of the crab cavity pair are set to create a local crabbing bump in the interaction region (IR). However, there are always small errors in the actual lattice of IR. In this article, we will present the simulation and analytical studies on the imperfections in the crab crossing scheme in the EIC design. The tolerance of the imperfection and the possible remedies can be concluded from these studies.

Hao, Y.↗

Beam-Beam Related Design Parameter Optimization for the Electron-Ion Collider

The design luminosity goal for the Electron-Ion Collider (EIC) is 1e34 cm⁻²s⁻¹. To achieve such a high luminosity, the EIC design adopts high bunch intensities, flat beams at the interaction point (IP) with a small vertical β^{*}-function, and a high collision frequency, together with crab cavities to compensate the geometrical luminosity loss due to the large crossing angle of 25mrad. In this article, we present our strategies and approaches to obtain the design luminosity by optimizing some key beam-beam related design parameters. Through our extensive strong-strong and weak-strong beam-beam simulations, we found that beam flatness, electron and proton beam size matching at the IP, electron and proton working points, and synchro-betatron resonances arising from the crossing angle collision play a crucial role in proton beam size growth and luminosity degradation. After optimizing those parameters, we found a set of beam-beam related design parameters to reach the design luminosity with an acceptable beam-beam performance.

Luo, Y.↗

Dynamic Aperture Evaluation for the Hadron Storage Ring in the Electron-Ion Collider

The Electron-Ion Collider (EIC) is aiming at a design luminosity of 1e34 cm⁻²s⁻¹. To maintain such a high luminosity, both beams in the EIC need an acceptable beam lifetime in the presence of the beam-beam interaction. For this purpose, we carried out weak-strong element-by-element particle tracking to evaluate the long-term dynamic aperture for the hadron ring lattice design. We improved our simulation code SimTrack to treat some new lattice design features, such as radially offset on-momentum orbits, coordinate transformations in the interaction region, etc. In this article, we will present the preliminary dynamic aperture calculation results with β^{*}- function scan, radial orbit shift, crossing angle collision, and magnetic field errors.

Luo, Y.↗

Design concept for the second interaction region for electron-ion collider

The possibility of two interaction regions (IRs) is a design requirement for Electron-Ion Collider (EIC). There is also a significant interest from the nuclear physics community to have a 2nd IR with measurement capabilities complementary to those of the 1st IR. While the 2nd IR will be in operation over the entire energy range of ~20GeV to ~140GeV center of mass (CM). The 2nd IR can also provide an acceptance coverage complementary to that of the 1st. In this paper, we present a brief overview and the current progress of the 2nd IR design in terms of the parameters, magnet layout, and beam dynamics.

Gamage, B. R.↗

The RCS Design Status for the Electron Ion Collider

The design of the Electron-Ion Collider Rapid Cycling Synchrotron (RCS) to be constructed at Brookhaven National Laboratory is advancing to meet the injection requirements for the Electron Storage Ring (ESR). Over the past year activities are focused on developing the approach to inject two 28 nC bunches every second, up from the original design of one 10nC bunch every second. The solution requires several key changes concerning the injection and extraction kickers, charge accumulation via bunch merging and a carefully calibrated RF acceleration profile to match the longitudinal emittance required by the ESR.

Ranjbar, V. H.↗

Electron lenses in RHIC: status and prospects

Two electron lenses are installed in Relativistic Heavy Ion Collider (RHIC). They were used as operational head-on beam-beam compensators in proton-proton collisions, with Gaussian transverse electron beam profiles. One of the lenses was also used with a hollow transverse profile to test hadron beam halo removal under various conditions. Although presently not in the design, the lenses may find applications in the Electron-ion Collider (EIC) for either collimation or beam-beam mitigation.

43 PARTICLE ACCELERATORS↗

Lowering the RHIC-Injection Lambertson Septum magnet to reduce the strength of the RHIC Injection Kickers

The present RHIC beam-injection-system and one of its components the Lambertson septum magnet will be used by the EIC project to inject the hadrons from the AGS into the EIC hadron ring for further acceleration. The number of hadron bunches injected to fill the EIC ring will be almost three times as many as compared to the number of bunches to fill RHIC. The increase of the injected bunches requires new type of kickers known as “transmission line” or “strip line” kickers which provide faster rise time of ~18 nsec, but this type of kickers may not be strong enough to provide the kick required to place the injected beam trajectory into the reference orbit of the circulating beam. In this technical note we provide a modification of the RHIC injection system which consists of lowering the Lambertson septum to decrease the strength of the kickers required to place the injected beam into the reference orbit of the circulating beam.

43 PARTICLE ACCELERATORS↗

Preparation for the Beam Energy Scan II at RHIC in 2020

RHIC will provide Au-Au collisions at beam energies of 5.75, 4.59 GeV/nucleon for physics program in 2020, and at beam energy of 3.85 GeV/nucleon for physics program in 2021 as part of the BeamEnergy Scan II (BES-II). The oper- ational experience gained in the first year (2019) of BES-II operation will be applied toward operations in the coming years. This article will present some technical details and the outlook of the BES-II operations in the coming years.

43 PARTICLE ACCELERATORS↗