Engineering Papers⌕ Search

Engineering topics

Montag, C.

Publications and source records attributed to Montag, C..

At least 73 records · Page 4

RHIC polarized proton-proton operation at 100 GeV in Run 15

The first part of RHIC Run 15 consisted of ten weeks of polarized proton on proton collisions at a beam energy of 100 GeV at two interaction points. In this paper we discuss several of the upgrades to the collider complex that allowed for improved performance. The largest effort consisted in commissioning of the electron lenses, one in each ring, which are designed to compensate one of the two beam-beam interactions experienced by the proton bunches. The e-lenses raise the per bunch intensity at which luminosity becomes beam-beam limited. A new lattice was designed to create the phase advances necessary for a beam-beam compensation with the e-lens, which also has an improved off-momentum dynamic aperture relative to previous runs. In order to take advantage of the new, higher intensity limit without suffering intensity driven emittance deterioration, other features were commissioned including a continuous transverse bunch-by-bunch damper in RHIC and a double harmonic RF cature scheme in the Booster. Other high intensity protections include improvements to the abort system and the installation of masks to intercept beam lost due to abort kicker pre-fires.

43 PARTICLE ACCELERATORS↗

RHIC Prefire Protection Masks

The protection of the RHIC experimental detectors from damage due to beam hitting close upstream elements in cases of abort kicker prefires requires some dedicated precautionary measures with two general options: to bring the beam close to a limiting aperture (i.e. the beam pipe wall), as far upstream of the detector components as possible or, alternatively, to bring a limiting aperture close to the circulating beam. During the FY 2014 RHIC Heavy Ion run the first option was chosen because of the limited time available for preparation before the start of the run. For future runs the second option, in this case the installation of dual-sided movable masks, is preferred. The installation of the masks, one per ring, is planned before the start of the FY 2015 run.

43 PARTICLE ACCELERATORS↗

p-Au ramp test

During FY2015 RHIC will be providing proton-gold collisions for the first time. The large difference in Z/A of these species results in challenging conditions at injection. The two injection scenarios under investigation are injection at equal Bρ which results in different revolution frequencies of the two beams, and injection at equal revolution frequencies, which requires different rigidities of Bρ of protons and gold.

43 PARTICLE ACCELERATORS↗