Engineering PapersSearch

SEARCH · Engineering Papers

Results for “power exhaust”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Power and particle exhaust in the ST-E1 fusion power plant

Power exhaust challenges and potential solutions for a 5 m major radius, low-aspect ratio burning tokamak have been explored. 1D edge plasma models have been used to screen for access to detachment using short and long outer divertor legs in double and single null configurations, using Ar as the primary impurity and assuming tungsten plasma-facing components (PFCs). These show that detachment access can be accessed for all but the most conservative assumptions on scrape-off layer (SOL) width and power, but that trade-offs will be required between magnet engineering and the size of the acceptable window of as-yet uncertain plasma parameters. SOLPS-ITER was used to further model selected plasma scenarios, confirming that Ar seeding can be used to achieve dissipative divertor scenarios with peak deposited heat fluxes below 15 MWm -2 . Initial scoping of first wall loads and positioning of limiters has been carried out, showing the feasibility of protecting the breeding blanket wall during steady state without impeding tritium breeding. Initial PFC technology selection is also presented, identifying this as a critical area where further work is needed to find an attractive solution for helium-cooled PFCs that can handle high heat fluxes without excessive power requirements. Key questions and trade-offs for concept development have been identified, including: how to achieve high radiation for reduction of SOL power without core performance degradation; whether power exhaust can be well-controlled in a double null plasma; mechanical design and materials challenges of high-heat flux PFCs; and control of material erosion, redeposition and tritium retention.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Radiative divertor detachment and impurity transport with nitrogen and neon seeding in KSTAR H-mode plasmas

Achieving core-edge compatible divertor detachment is a critical requirement for stable operation in future fusion devices. This study compares nitrogen and neon seeding in KSTAR H-mode plasmas with carbon walls, combining experiments and SOLPS-ITER modelling to evaluate their radiative dissipation and core-edge compatibility. Experimentally, N seeding achieved stronger divertor detachment, with larger reductions in target particle and heat fluxes, a higher divertor radiation fraction, and a lower core radiation fraction than Ne. In contrast, Ne seeding triggered a significant rise in core radiation followed by H–L back transitions, limiting the maximum total radiated power fraction to roughly half that of N. SOLPS-ITER simulations reproduced the experimental trends and revealed that the better core-edge compatibility of N arises from its higher divertor retention in addition to its higher cooling factor. The relative positions of the stagnation points of impurity poloidal velocity and ionization sources did not explain the different divertor compression. Instead, in the present modelling, the higher impurity parallel particle flux, resulting from the higher parallel impurity velocity, explains the stronger nitrogen impurity compression in the divertor region. The parallel temperature distribution with N was more favourable for achieving higher impurity parallel velocity than with Ne, because the impurity velocity is governed by modifications of the main ion flow due to friction and thermal forces, both of which strongly depend on the temperature. Ultimately, this behaviour is attributed to the strongly divertor-localized radiation of N. These results demonstrate that N is more effective than Ne in achieving radiative divertor detachment while maintaining low core contamination in KSTAR, consistent with observations in other present tokamaks.

KSTAR

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Bypass heat exchanger configuration to reroute core flow

A turbine engine assembly includes a heat exchanger that is in thermal communication with an exhaust gas flow. A bypass passage is provided that is configured to selectively route at least a portion of the exhaust gas flow around the heat exchanger in response to a predefined engine operating condition.

Terwilliger, Neil

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

Carbon Tetrachloride Degradation Results for 200-ZP-1 Operable Unit

Carbon tetrachloride (CT) contamination in the 200-ZP-1 Operable Unit (OU) at the Hanford Site originated from large-volume discharges to the subsurface during plutonium production operations between 1955 and 1973. Contamination migrated through more than 70 meters of unsaturated sediment to reach the underlying unconfined aquifer, where it persists as a large and complex groundwater plume. The 200-ZP-1 OU Record of Decision (ROD) requires that groundwater CT concentrations be reduced to 3.4 µg/L within 125 years. Current groundwater modeling projections estimate that the existing pump-and-treat, even when combined with monitored natural attenuation (specifically hydrolysis), will not achieve this target within the designated timeframe. A fundamental contributor to this shortfall is the extremely slow rate of CT hydrolysis under Hanford aquifer conditions, which has been estimated to have a half-life of 630 years. If faster-acting biotic and abiotic degradation processes are operating within the aquifer, their contribution to CT mass reduction could have a meaningful impact. However, site-specific measurements of these processes and their rates have not previously been performed. This report documents the results of a two-phase laboratory investigation designed to characterize and quantify the capacity of site-specific 200-ZP-1 OU sediments and groundwater to support natural attenuation of CT through biotic and abiotic pathways. In this context, degradation capacity is defined as the intrinsic potential of the subsurface matrix to transform CT under optimized, controlled conditions. System capacity is evaluated in two ways: (1) as rate-limited capacity, which establishes the maximum kinetic velocity of CT transformation and is measured using half-lives and first order rate constants; and (2) as mass limited capacity, which defines the total contaminant mass the batch experimental system can degrade before reactants are exhausted, representing the maximum amount of contaminant the microbial community and reactive mineral phases can transform under the experimental conditions.

abiotic degradation

Recommendations for Establishing Local Rural Electrification Programs Using Photovoltaic Systems [Recomendaciones Para la Implantacidn de Programas Locales de Electrificacidn Rural con Sistemas Fotovoltaicos]

Photovoltaic (PV) technology is becoming one the best options for supplying electricity to rural communities far from electrical networks and which have a small and disperse demand for electricity. As the cost of the technology goes down and its development advances, opportunities for applying it continue to grow. As a result, in the near future we will probably see an increase in massive application programs of this technology in rural Mexico. This document presents some of the most relevant problems needing immediate solution to increase the possibility of success in establishing photovoltaic programs for rural electrification in Mexico. These problems are influenced by economic, technological, engineering, infrastructural, social and political issues. The paper presents the requirements for an industrial center based on PV technology, the accessibility of replacement parts and maintenance service, development of financial solutions, training of the users and introducing norms and technical regulations. The document summarizes the issue of rural electrification in Mexico, emphasizing the low population density in these areas. A brief description is given of photovoltaics showing different configurations that can be utilized for supplying electricity to the rural areas. The issues involved and recommendations for introducing PV systems to the rural area are described.

14 SOLAR ENERGY

Measuring Climate and Water Risk across the Bulk Power System

As climate impacts increase and power systems transition to renewables, planners and operators need insights into climate risks to power generation and infrastructure to ensure reliable decision-making in the short and long-term. We present a standardized, consistent mechanism for utilities and system operators to evaluate the climate- and water-related risks of their current and future grid assets. Using a risk-based approach on the combined outcomes of high-fidelity climate drivers together with water and power system models, we examine the temperature and water availability impacts within the contiguous United States to power system assets at the water basin level in three different time periods and report resulting outcomes on lost capacity across different expansion scenarios and climate models. The results indicate that air temperature has the highest effect on derating. Changes in streamflow do not have a large impact on generation capacity at the national level. Electric sector buildout scenarios each have a unique regional risk profile, depending on the technology mix and total capacity, although risks from high temperatures are significant for both traditional and renewable energy generation. Stakeholders can use this approach to monitor effects of generation capacity losses and potential impacts as climate, generation mix, and infrastructure change.

24 POWER TRANSMISSION AND DISTRIBUTION

Tritium Betavoltaic Powered Sensor Platforms: Power Augmentation with Scintillating Particles

Betavoltaics (BV) are long-life power sources that typically convert beta particle radiation into electricity. Largely, the radioactive decays within the source go unharvested by the device. This work seeks to augment the power generation of BV devices by integration of scintillating particles within the radiative getter to convert beta emission which would otherwise not leave the getter into usable light for power generation. Silica-covered barium fluoride scintillating particles were integrated into a tritiated water getter. Power generation was increased from 100s of nW to µW levels with the addition of 0.2 wt. % particles into the getter. Nanowatt-scale sensor platforms were demonstrated with the µW BV devices and the maximum possible lifetime of such platforms was estimated. As this technique enables higher power density BV devices from conventional Si semiconductors (compared to wider bandgap BVs), the further implementation may lower the barrier-to-deployment of these long-life power/sensor platforms.

42 ENGINEERING