Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “filer technologies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study

NorthStar Clean Energy Company (NorthStar) conducted the Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study to develop a conceptual design and cost estimate for retrofitting the TES Filer City Station with post-combustion carbon capture technology in Mainstee Michigan. The Filer City BiCRS Net-Negative Study allowed NorthStar and team to confirm the commercial feasibility of a post-combustion carbon capture system applied to biomass-fired boilers. At the time of the study, there were no operating facilities in the world with carbon capture applied to flue gas from woody biomass as proposed for Filer City. Due to the solvent-agnostic nature of B&W’s SolveBright™ technology, the team determined that multiple amines, both traditional and proprietary, would be capable of 95% CO 2 capture efficiency with the steam available from Filer City’s existing boilers after modifications to burn 100% biomass. Based on the cost estimates produced, NorthStar can now confirm the Filer City BiCRS Project is economically viable with a combination of tax credits available from the Inflation Reduction Act of 2022 and high-quality Carbon Dioxide Removal Credits sold on the Voluntary Carbon Market. The Filer City BiCRS project is uniquely positioned to become one of the first projects to capture and sequester large volumes of CO 2 from a biogenic source, removing existing CO 2 from the atmosphere. The unlimited version of the Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study Final Technical Report is attached.

01 COAL, LIGNITE, AND PEAT↗

Wide-Bandgap Semiconductor Amplifiers for Fusion Plasma Heating and Control

This paper discusses power electronics developed under the ARPA-E GAMOW program to support nuclear fusion power production. The goal of this project was to develop and assess the potential for wide-bandgap (WBG) semiconductor devices in power electronics to enable high-efficiency and high-voltage solid-state systems for fusion plasma generation, heating, and control. The power electronics use an architecture in which multiple high-power boards can be combined to produce megawatt-level power, where using multiple boards provides high reliability. Two main areas of power electronics boards are developed in this project for fusion plasma heating and control applications: (1) pulse generation and control and (2) radiofrequency generation. The first area is for boards capable of driving high-voltage millisecond pulses at high duty cycles. The envisioned application of these pulses is in plasma control of magnetohydrodynamic instabilities, plasma position, and edge-localized modes. Pulse-width modulation allows for the implementation of a wide variety of linear and nonlinear control systems. The boards developed for this project could actuate control coils based on digital input signals and can be parallelized to provide megawatts of output power. The design of the pulse generator is a low-side load switch. A load switch was designed and constructed that utilized 2-kV-rated field-effect transistor (FET)-based cascodes developed by Qorvo under this project to perform initial testing of these cascodes. The second area is being implemented using class E amplifiers with WBG devices and a reactance steering network to handle inductive or capacitive plasma loads. Applications include ion cyclotron resonance heating (ICRH) and high-harmonic fast-wave (HHFW) heating. A class E reactance steering network is demonstrated in modeling and experiment with a resistive-inductive load that models an inductively-coupled plasma. Power combining of boards with class E reactance steering networks is also simulated and demonstrated experimentally, to enable scaling up to high power. Modeling of high-power-density cooling and remaining useful life is conducted to enable reliable, effectively cooled high-power electronics for fusion applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TU-FG-BRB-11: Design and Evaluation of a Robotic C-Arm CBCT System for Image-Guided Proton Therapy

Purpose: To describe the design and performance of a ceiling-mounted robotic C-arm CBCT system for image-guided proton therapy. Methods: Uniquely different from traditional C-arm CBCT used in interventional radiology, the imaging system was designed to provide volumetric image guidance for patients treated on a 190-degree proton gantry system and a 6 degree-of-freedom (DOF) robotic patient positioner. The mounting of robotic arms to the ceiling rails, rather than gantry or nozzle, provides the flexibility in imaging locations (isocenter, iso+27cm in X, iso+100cm in Y) in the room and easier upgrade as technology advances. A kV X-ray tube and a 43×43cm flat panel imager were mounted to a rotating C-ring (87cm diameter), which is coupled to the C-arm concentrically. Both C-arm and the robotic arm remain stationary during imaging to maintain high position accuracy. Source-to-axis distance and source-to-imager distance are 100 and 150cm, respectively. A 14:1 focused anti-scatter grid and a bowtie filer are used for image acquisition. A unique automatic collimator device of 4 independent blades for adjusting field of view and reducing patient dose has also been developed. Results: Sub-millimeter position accuracy and repeatability of the robotic C-arm were measured with a laser tracker. High quality CBCT images for positioning can be acquired with a weighted CTDI of 3.6mGy (head in 200° full fan mode: 100kV, 20mA, 20ms, 10fps)-8.7 mGy (pelvis in 360° half fan mode: 125kV, 42mA, 20ms, 10fps). Image guidance accuracy achieved <1mm (3D vector) with automatic 3D-3D registration for anthropomorphic head and pelvis phantoms. Since November 2015, 22 proton therapy patients have undergone daily CBCT imaging for 6 DOF positioning. Conclusion: Decoupled from gantry and nozzle, this CBCT system provides a unique solution for volumetric image guidance with half/partial proton gantry systems. We demonstrated that daily CBCT can be integrated into proton therapy for pre-treatment position verification.

60 APPLIED LIFE SCIENCES↗