Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “evaluation process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Hand controller commonality evaluation process

A hand controller evaluation process has been developed to determine the appropriate hand controller configurations for supporting remotely controlled devices. These devices include remote manipulator systems (RMS), dexterous robots, and remotely-piloted free flyers. Standard interfaces were developed to evaluate six different hand controllers in three test facilities including dynamic computer simulations, kinematic computer simulations, and physical simulations. The hand controllers under consideration were six degree-of-freedom (DOF) position and rate minimaster and joystick controllers, and three-DOF rate controllers. Task performance data, subjective comments, and anthropometric data obtained during tests were used for controller configuration recommendations to the SSF Program.

Stuart, Mark A.↗

Process evaluation distributed system

The distributed system includes a database server, an administration module, a process evaluation module, and a data display module. The administration module is in communication with the database server for providing observation criteria information to the database server. The process evaluation module is in communication with the database server for obtaining the observation criteria information from the database server and collecting process data based on the observation criteria information. The process evaluation module utilizes a personal digital assistant (PDA). A data display module in communication with the database server, including a website for viewing collected process data in a desired metrics form, the data display module also for providing desired editing and modification of the collected process data. The connectivity established by the database server to the administration module, the process evaluation module, and the data display module, minimizes the requirement for manual input of the collected process data.

Moffatt, Christopher L.↗

Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

Sapp, T. P.↗

Human-in-the-Loop Evaluations: Process and Mockup Fidelity

Human-in-the-loop (HITL) evaluations are iterative events used during design and development to identify issues with the implementation of human systems integration. HITL evaluations involve human test subjects who are user-representative participants performing activities with representative hardware, software, and procedures. The paper will describe the process by which HITL evaluations can be implemented in a program or project. This will include definitions for developmental and verification HITL evaluations, levels of mockup fidelity, and certification of HITL articles. The proposed process can be tailored depending on the type of HITL evaluation being conducted. It is highly recommended that findings are timely reported and incorporated in the hardware and/or software design.

Jackelynne Silva-Martinez↗

Silicon production process evaluations

Chemical engineering analysis of the HSC process (Hemlock Semiconductor Corporation) for producing silicon from dichlorosilane in a 1,000 MT/yr plant was continued. Progress and status for the chemical engineering analysis of the HSC process are reported for the primary process design engineering activities: base case conditions (85%), reaction chemistry (85%), process flow diagram (60%), material balance (60%), energy balance (30%), property data (30%), equipment design (20%) and major equipment list (10%). Engineering design of the initial distillation column (D-01, stripper column) in the process was initiated. The function of the distillation column is to remove volatile gases (such as hydrogen and nitrogen) which are dissolved in liquid chlorosilanes. Initial specifications and results for the distillation column design are reported including the variation of tray requirements (equilibrium stages) with reflux ratio for the distillation.

Source record↗

Silicon production process evaluations

Chemical engineering analyses involving the preliminary process design of a plant (1,000 metric tons/year capacity) to produce silicon via the technology under consideration were accomplished. Major activities in the chemical engineering analyses included base case conditions, reaction chemistry, process flowsheet, material balance, energy balance, property data, equipment design, major equipment list, production labor and forward for economic analysis. The process design package provided detailed data for raw materials, utilities, major process equipment and production labor requirements necessary for polysilicon production in each process.

Source record↗

The GEWEX Process Evaluation Study: GEWEX-PROES

Progress in realistically simulating the energy and water cycles in weather and climate models has been slower than desirable. Climate models submitted to the Coupled Model Intercomparison Project Phase-5 (CMIP-5), while more comprehensive than their predecessors, have shown little to no improvement in their biases in simulating key features of the climate system. As a result, uncertainties in global climate and hydrological sensitivities, and in the simulation of regional climate change, have not been reduced significantly. It is time to make use of these opportunities to significantly advance our understanding of key energy and water cycle processes at a wide range of space and time scales, and to provide a more insightful evaluation of the representation of these processes within models. This will require new ways of both analyzing the observations and diagnosing model behavior. The keys to success will be in skillfully combining different data sets and exploring relationships between them, as well as in the ability of models to reproduce those relationships correctly. In response to this challenge, a new GEWEX-wide activity, the GEWEX Process Evaluation Study, will take advantage of the opportunities that the combination of many of the existing data sets provide.

climate models↗

Silicon production process evaluations

The chemical engineering analysis of the preliminary process design of a process for producing solar cell grade silicon from dichlorosilane is presented. A plant to produce 1,000 MT/yr of silicon is analyzed. Progress and status for the plant design are reported for the primary activities of base case conditions (60 percent), reaction chemistry (50 percent), process flow diagram (35 percent), energy balance (10 percent), property data (10 percent) and equipment design (5 percent).

Source record↗

Silicon production process evaluations

Chemical engineering analysis was continued for the HSC process (Hemlock Semiconductor Corporation) in which solar cell silicon is produced in a 1,000 MT/yr plant. Progress and status are reported for the primary engineering activities involved in the preliminary process engineering design of the plant base case conditions (96%), reaction chemistry (96%), process flow diagram (85%), material balance (85%), energy balance (60%), property data (60%), equipment design (40%), major equipment list (30%) and labor requirements (10%). Engineering design of the second distillation column (D-02, TCS column) in the process was completed. The design is based on a 97% recovery of the light key (TCS, trichlorosilane) in the distillate and a 97% recovery of the heavy key (TET, silicon tetrachloride) in the bottoms. At a reflux ratio of 2, the specified recovery of TCS and TET is achieved with 20 trays (equilibrium stages, N=20). Respective feed tray locations are 9, 12 and 15 (NF sub 1 = 9, NF sub 2 = 12,, and NF sub 3 = 15). A total condenser is used for the distillation which is conducted at a pressure of 90 psia.

Source record↗

Silicon production process evaluations

Engineering design of the third distillation column in the process was accomplished. The initial design is based on a 94.35% recovery of dichlorosilane in the distillate and a 99.9% recovery of trichlorosilane in the bottoms. The specified separation is achieved at a reflux ratio of 15 with 20 trays (equilibrium stages). Additional specifications and results are reported including equipment size, temperatures and pressure. Specific raw material requirements necessary to produce the silicon in the process are presented. The primary raw materials include metallurgical grade silicon, silicon tetrachloride, hydrogen, copper (catalyst) and lime (waste treatment). Hydrogen chloride is produced as by product in the silicon deposition. Cost analysis of the process was initiated during this reporting period.

Source record↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Hand controller commonality evaluation process

Hand controller selection for NASA's Orbiter and Space Station Freedom is an important area of human-telerobot interface design and evaluation. These input devices will control remotely operated systems that include large crane-like manipulators (e.g., Remote Manipulator System or RMS), smaller, more dexterous manipulators (e.g., Flight Telerobotic Servicer or FTS), and free flyers (e.g., Orbital Maneuvering Vehicle or OMV). Candidate hand controller configurations for these systems vary in many ways: shape, size, number of degrees-of-freedom (DOF), operating modes, provision of force reflection, range of movement, and 'naturalness' of use. Unresolved design implementation issues remain, including such topics as how the current Orbiter RMS rotational and translational rate hand controllers compare with the proposed Space Station Freedom hand controllers, the advantages that position hand controllers offer for these applications, and whether separate hand controller configurations are required for each application. Since previous studies contain little empirical hand controller task performance data, a controlled study is needed that tests Space Station Freedom candidate hand controllers during representative tasks. This study also needs to include anthropometric and biomechanical considerations.

Stuart, Mark A.↗

Comb/serpentine/cross-bridge test structure for fabrication process evaluation

The comb/serpentine/cross-bridge structure was developed to monitor and evaluate same layer shorts and step coverage problems (open and high-resistance wire over steps) for integrated circuit fabrication processes. The cross-bridge provides local measurements of wire sheet resistance and wirewidth. These local parametric measurements are used in the analysis of the serpentine wire, which identifies step coverage problems. The comb/serpentine/cross-bridge structure was fabricated with 3 microns CMOS/bulk p-well process and tested using a computer-controlled parametric test system.

Sayah, Hoshyar R.↗

Quadruple Lap Shear Processing Evaluation

The Thiokol, Science and Engineering Huntsville Operations (SEHO) Laboratory has previously experienced significant levels of variation in testing Quadruple Lap Shear (QLS) specimens. The QLS test is used at Thiokol / Utah for the qualification of Reusable Solid Rocket Motor (RSRM) nozzle flex bearing materials. A test was conducted to verify that process changes instituted by SEHO personnel effectively reduced variability, even with normal processing variables introduced. A test matrix was designed to progress in a series of steps; the first establishing a baseline, then introducing additional solvents or other variables. Variables included normal test plan delay times, pre-bond solvent hand-wipes and contaminants. Each condition tested utilized standard QLS hardware bonded with natural rubber, two separate technicians and three replicates. This paper will report the results and conclusions of this investigation.

Thornton, Tony N.↗