Engineering PapersSearch

SEARCH · Engineering Papers

Results for “charging station costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Economic Storage Size Optimization for Electric Vehicle Extreme-Fast Charging Stations

En-route charging infrastructure for electric vehicles is critical to support transportation needs. These charging stations are likely to have high loads and especially sharp peak loads given fast charging capabilities needed to meet transportation schedules. In order to reduce both strain on distribution grid infrastructure and charging station operational costs, many stations are likely to employ behind the meter storage. This paper demonstrates a behind the meter storage sizing optimization that employs an open-source agent-based vehicle behavior model (BEAM) to determine the best sizing across many scenarios. This optimization and analysis is novel in that it examines how storage size impacts not only charging station cost and peak load, but also vehicle queue times. The optimization is also applied across a wide analysis region with sufficient diversity and numbers to provide novel statistical analysis of optimal sizes.

Aka, Julius

Cost of convenience in long-dwell public electric vehicle charging

This paper presents a comprehensive methodology for quantifying trade offs between the cost of charging at public Level-2 charging stations and the inconvenience of using those stations. The paper also includes a methodology for generating synthetic travel itineraries of tens of thousands of drivers and for sizing and placing charging infrastructure to support those itineraries. Inconvenience is quantified by a weighted sum of the time a driver spends traveling between their intended destination and the charging station; weights are derived from the activity interrupted by the driver’s need to move their car. We demonstrate a trade off between cost of charging and inconvenience by varying how far away from their destination drivers are willing to charge. Our results demonstrate the importance of access to stations and suggest that other methods for increasing access, such as increasing the spatial density of stations, could significantly impact charging cost and inconvenience. Moreover, average energy cost may be reduced by introducing managed charging, which also affects inconvenience. The framework presented here can be used to evaluate the overlapping effects of both access and charge management. Furthermore, the framework can be easily extended to include additional factors such as capital costs, enabling thorough evaluation and planning of regional Level-2 charging networks.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA

Key Performance Indicators for Vehicle Grid Integration

Electric vehicle (EV) sales account for a rapidly growing portion of the light-duty vehicle market and a portion of medium and heavy-duty fleet vehicles. However, in many locations, charging stations will require costly utility grid upgrades with long lead times. Today, there are a few methods of smart charge management (SCM) which can reduce the costs and wait times for electric vehicle supply equipment (EVSE) interconnection approvals, as well as reduce impacts of the charging stations on the grid and on EV driver transportation costs. It is crucial for the EV charging industry to understand the vehicle grid integration (VGI) requirements for EVSE to prevent adverse impacts from EVSE interconnections and assure that charging loads and interconnections are affordable.

33 - ADVANCED PROPULSION SYSTEMS

Station Impact Analysis 2025

As part of the U.S. DOE EVs@Scale consortium, the NextGen Profiles (NGP) project presents analysis and results from the study of High Power Charging Electric Vehicles and Battery Charging Infrastructure. High Power Charging equipment is capable of recharging electric vehicle traction batteries at power levels of 200KW and above. The intent of the project is to further understand the most recent technological capabilities of the electric mobility industry related to charging performance. The project aims to develop EV, EVSE, and Fleet characterization testing practices and comprehensive analysis with inputs from key industry stakeholders. The results published in this NextGen Profiles project report provide data and insight for use by numerous entities including modeling and simulation organizations, policy makers, fleet planners, industry stakeholders and the general public involved with the development, deployment and operation of electrified transportation technologies. The factors influencing Electric Vehicle (EV) Direct Current Fast Charging (DCFC), including EV battery specifications, temperature effects on lithium-ion battery and power electronics performance, lithium-ion battery SOC bounding and charging station design considerations are specifically investigated to analyze their impacts on charging station operation and recommendations are made to minimize charge station dwell time, reduce charging costs and mitigate electric grid and charge station congestion. Additional high-power charging results are anticipated in future publications in support of the U.S. DOE EVs@Scale consortium NextGen Profiles project.

33 ADVANCED PROPULSION SYSTEMS

EVSE Soft Costs

This presentation is an overview of the VTO Annual Merit Review for EVSE soft costs project.

ADVANCED PROPULSION SYSTEMS

Electric Vehicle Charging Stations as a Climate Change Mitigation Strategy

In order to facilitate the use of electric vehicles at NASA Langley Research Center (LaRC), charging stations should be made available to LaRC employees. The implementation of charging stations would decrease the need for gasoline thus decreasing CO2 emissions improving local air quality and providing a cost savings for LaRC employees. A charging station pilot program is described that would install stations as the need increased and also presents a business model that pays for the electricity used and installation at no cost to the government.

Cave, Bridget

A Stochastic Framework for Estimating Load Profiles at EV Fast Charging Stations

This paper formulates a methodology for estimating the average daily load profiles of EV fast charging stations over a planning horizon of five to ten years. The developed methodology uses historic vehicle registration data, state-level EV adoption targets, seasonal driving patterns, local demographics, competition, and traffic volume information to predict average station usage. Through Monte Carlo simulations, an average daily load profile is obtained for each month in the planning horizon, and prediction uncertainty is quantified. The proposed framework will facilitate the accurate estimation of energy and demand costs incurred by the charging station over the planning period, thereby informing return-on-investment calculations.

Biswas, Shuchismita

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION

Siting and sizing of public–private charging stations impacts on household and electric vehicle fleets

To facilitate the provision of electric vehicle charging stations (EVCS) in urban areas, this study investigates the benefits of co-locating fleet-owned chargers with public charging stations to enable construction incentives and cord-sharing cost savings. Shared EVCS can serve charging demand from both user types: private (household) EV owners and those managing fleet vehicles – like shared and fully automated EV (SAEV) fleets. Using POLARIS to simulate all person-travel across the 6-county Austin, Texas region, new EVCS were sited and sized with DC fast-charging (DCFC) plugs to lower operating and construction costs while providing public + private (PP) service across an 81-square-mile core geofence (where 200 SAEVs were active) over 24-hour days. When co-location is permitted, 115 DCFC cords were added to the 23 existing (publicly available) stations to enable SAEVs and household EVs (HHEVs) charging access, within the geofence. Each 250-mile-range SAEV was simulated to travel an average of 330 miles per day, serve over 92 person-trips, and recharge 2.7 times a day (for 2.4 h per session). The new DCFC plugs were primarily added to public EVCS at shopping centers and schools, and in residential settings along freeways. The average plug served 4.8 EVs per day. Most co-located PP EVCS permitted immediate (no-wait) charging, except for 2 stations along freeways that averaged 8 min of wait time to begin charging. In conclusion, the co-location strategy lowered fleet owners’ initial EVCS construction costs by 12 % (thanks to cord-sharing to avoid cord duplication), while reducing SAEV wait times to just 3.1 min (versus 10.7 min if SAEV managers had to build and operate their own EVCS).

EV charging modeling

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC

Economics of electric vehicle corridor fast charging in the United States

Corridor direct-current fast charging (DCFC) stations enable long-distance electric vehicle travel, yet their economics remain uncertain due to high capital costs, low initial utilization, and exposure to utility demand charges. This study evaluates the long-term economics of corridor DCFC across the United States, incorporating capital and operating expenses-including charging equipment and real-world utility tariffs-alongside modeled station utilization, financial incentives, and ancillary retail revenue. In the Baseline scenario, modeled breakeven costs for corridor DCFC average $\$$0.42/kWh over 20 years, yet fewer than half of stations reach cost parity with gasoline on a per-mile basis. Utilization is the primary driver of cost variation, with low-utilization stations costing roughly six times more per kilowatt-hour than the national average. Excluding stations that fail to reach cost parity reduces National Highway System coverage within 50 miles from 94% to 67%, underscoring the trade-off between market-driven deployment and comprehensive network coverage. These results provide guidance for charging providers, utilities, planners, and policymakers seeking to develop and sustain a financially viable national corridor charging network.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Techno-Economic Assessments of Second-Life Batteries for Electric Vehicle Charging Stations

When electric vehicle (EV) batteries degrade below a certain capacity, they may no longer be suitable for automotive use but can be repurposed as second-life batteries (SLBs) for other applications, such as EV charging stations. When integrated with photovoltaic (PV) systems, SLB can store surplus solar energy, reducing reliance on the grid and lowering operational costs. This paper presents a novel techno-economic assessment framework for deploying SLBs in combination with PV in grid-connected EV charging stations. The proposed framework integrates the value proposition, charging station operation, optimal dispatch strategies, battery degradation modeling, input data requirements, and detailed procedures for generating key economic performance metrics. Insightful analyses are performed to assess the performance of SLBs in comparison to new batteries across various cost scenarios. The results indicate that SLBs become financially attractive when their cost is 40% or lower than new batteries.

energy storage

Equitable Urban Electric Vehicle Charging: Feasibility and Benefits of Streetlight Charging in Kansas City Right-of-Way

With an increasing global emphasis on sustainability, electric vehicles (EVs) play a crucial role in reducing urban pollution and carbon emissions. For EVs to be widely adopted, equitable and convenient access to charging infrastructure is essential. Equity in this paper refers to the proactive engagement with the community to ensure that the benefits of streetlight charging are distributed equitably across diverse neighborhoods in Kansas City, providing fair charging opportunities and resources to all community members. This research explores the potential of utilizing streetlights—ubiquitous elements of urban electrical infrastructure—as low-cost, equitable EV charging solutions. Compared with conventional chargers, streetlight charging offers several notable advantages, including proximity to roadways, potential boosts to the local economy, and easier usage due to city ownership. These chargers also leverage existing power setups to minimize costs and maximize efficiency by reutilizing existing structures. In this manuscript, we introduce a systematic framework to develop, analyze, and evaluate a scalable and cost-effective streetlight charging solution. Initially, we employ a two-tiered site selection framework that accounts for both charging demand and equity considerations to identify optimal locations for streetlight chargers. We then assess the feasibility of these chargers through observational data from 23 units installed in Kansas City, Missouri, comparing their performance with traditional chargers. Here, our evaluation extends to the environmental impact, comparing reduced gasoline consumption and greenhouse gas (GHG) emission reductions between streetlights and regular charging stations. Our findings reveal that streetlight charging stations offer faster charging speeds than conventional stations, validating their viability for EV charging. Additionally, the duration of stay at streetlight chargers tends to be shorter, likely due to parking constraints or associated costs. Furthermore, streetlight-powered chargers demonstrate considerable environmental advantages, achieving 11.94% greater avoided gasoline consumption and 11.24% higher GHG reductions compared with regular charging stations, highlighting their substantial environmental benefits.

42 ENGINEERING

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Space station: Cost and benefits

Costs for developing, producing, operating, and supporting the initial space station, a 4 to 8 man space station, and a 4 to 24 man space station are estimated and compared. These costs include contractor hardware; space station assembly and logistics flight costs; and payload support elements. Transportation system options examined include orbiter modules; standard and extended duration STS fights; reusable spacebased perigee kick motor OTV; and upper stages. Space station service charges assessed include crew hours; energy requirements; payload support module storage; pressurized port usage; and OTV service facility. Graphs show costs for science missions, space processing research, small communication satellites; large GEO transportation; OVT launch costs; DOD payload costs, and user costs.

Source record