Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “bus split”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Interface of the transport systems research vehicle monochrome display system to the digital autonomous terminal access communication data bus

An upgrade of the transport systems research vehicle (TSRV) experimental flight system retained the original monochrome display system. The original host computer was replaced with a Norden 11/70, a new digital autonomous terminal access communication (DATAC) data bus was installed for data transfer between display system and host, while a new data interface method was required. The new display data interface uses four split phase bipolar (SPBP) serial busses. The DATAC bus uses a shared interface ram (SIR) for intermediate storage of its data transfer. A display interface unit (DIU) was designed and configured to read from and write to the SIR to properly convert the data from parallel to SPBP serial and vice versa. It is found that separation of data for use by each SPBP bus and synchronization of data tranfer throughout the entire experimental flight system are major problems which require solution in DIU design. The techniques used to accomplish these new data interface requirements are described.

Easley, W. C.↗

A contention-based bus-control scheme for multiprocessor systems

The authors study contention-based bus-control schemes for scheduling processors in using a bit-parallel shared bus. The protocol is designed under the requirements that each processor exhibit a random access behavior, that there be no centralized bus control in the system, and that access be granted in real time. The proposed scheme is based on splitting algorithms used in conventional contention-resolution schemes, and utilizes two-state information obtained from collision detection. Two versions of the bus-control scheme are studied. The static one resolves contentions of N requesting processors in an average of O(logW/2N) iterations, where W is the number of bits in the bit-parallel bus. An adaptive version resolves contentions in an average time that is independent of N.

Juang, Jie-Yong↗

Trend Monitoring System (TMS) graphics software

A prototype bus communications systems, which is being used to support the Trend Monitoring System (TMS) and to evaluate the bus concept is considered. A set of FORTRAN-callable graphics subroutines for the host MODCOMP comuter, and an approach to splitting graphics work between the host and the system's intelligent graphics terminals are described. The graphics software in the MODCOMP and the operating software package written for the graphics terminals are included.

Brown, J. S.↗

A solar power system for an early Mars expedition

As NASA looks at missions that will expand human presence in the solar system, the power requirements for such missions need to be defined, developed and analyzed. One mission under consideration consists of a 40 day manned Mars surface expedition to perform science experiments. The mission time was centered around an aerocentric longitude (Ls) of 90 deg to lessen the probability of an occurrence of a local or planetary dust storm. The mission site was arbitrarily located at the Martian equator. The power requirements were assumed to be 40 kWe for life support and experiment power during the Martian day and 20 kWe for life support during the Martian night. A solar energy system consisting of roll-out amorphous silicon arrays and a hydrogen-oxygen regenerative fuel cell energy storage system was chosen for the study. The power available from a roll-out array, when plotted against time, approaches a cosine-like curve and depends on both array area and the amount of solar irradiance impinging on its horizontal surface. The array is sized to provide at least 20 KWe when the sun is 12.5 deg above the horizon and ramp up to 140 kWe peak power at Martian noon. In this configuration, the array is capable of supplying 40 KWe continuously to the user for the majority of the Martian day while supplying the excess energy to the electrolyzer portion of the energy storage system. A roll-out, pumped loop radiator system is used to dissipate the waste heat produced by the fuel cell. The power management and distribution system inverts the power from the individual solar array sub-modules and the fuel cell stacks and connects them to a 440 VAC single phase 20 kHz main bus. The total power system is comprised of 80 individual solar array modules with an integral bus and three energy storage modules consisting of fuel cell and electrolyzer stacks, reactant storage tanks, and a roll-out radiator. Power system mass, stowed volume, and deployed area were determined. Day/night power splits of 40/10 kWe, 40/30 kWe, and 40/40 kWe were also considered to determine the impact of a range of nighttime power requirements on the baseline system.

Mckissock, Barbara I.↗

Space shuttle data handling and communications considerations.

Operational and development flight instrumentation, data handling subsystems and communication requirements of the space shuttle orbiter are discussed. Emphasis is made on data gathering methods, crew display data, computer processing, recording, and telemetry by means of a digital data bus. Also considered are overall communication conceptual system aspects and design features allowing a proper specification of telemetry encoders and instrumentation recorders. An adaptive bit rate concept is proposed to handle the telemetry bit rates which vary with the amount of operational and experimental data to be transmitted. A split-phase encoding technique is proposed for telemetry to cope with the excessive bit jitter and low bit transition density which may affect television performance.

Stoker, C. J.↗

NASA Tech Briefs, March 2008

Topics covered include: WRATS Integrated Data Acquisition System; Breadboard Signal Processor for Arraying DSN Antennas; Digital Receiver Phase Meter; Split-Block Waveguide Polarization Twist for 220 to 325 GHz; Nano-Multiplication-Region Avalanche Photodiodes and Arrays; Tailored Asymmetry for Enhanced Coupling to WGM Resonators; Disabling CNT Electronic Devices by Use of Electron Beams; Conical Bearingless Motor/Generators; Integrated Force Method for Indeterminate Structures; Carbon-Nanotube-Based Electrodes for Biomedical Applications; Compact Directional Microwave Antenna for Localized Heating; Using Hyperspectral Imagery to Identify Turfgrass Stresses; Shaping Diffraction-Grating Grooves to Optimize Efficiency; Low-Light-Shift Cesium Fountain without Mechanical Shutters; Magnetic Compensation for Second-Order Doppler Shift in LITS; Nanostructures Exploit Hybrid-Polariton Resonances; Microfluidics, Chromatography, and Atomic-Force Microscopy; Model of Image Artifacts from Dust Particles; Pattern-Recognition System for Approaching a Known Target; Orchestrator Telemetry Processing Pipeline; Scheme for Quantum Computing Immune to Decoherence; Spin-Stabilized Microsatellites with Solar Concentrators; Phase Calibration of Antenna Arrays Aimed at Spacecraft; Ring Bus Architecture for a Solid-State Recorder; and Image Compression Algorithm Altered to Improve Stereo Ranging.

Source record↗

Comet P/Halley's periodic brightness variations in 1910

Periodic variations in Comet Halley's production of gas and dust during its 1910 apparition were searched for using measurements from a homogeneous set of photographic plates obtained at the National Observatory of Argentina at Cordoba. After applying corrections to the observations to compensate for geometric and heliocentric distance effects, the data, spanning the two months immediately following perihelion, were split into two sections for analysis. Of the possible periods indicated in either half of the dataset, only those in the range of 7.3-7.8 days were present in both halves. The additional constraint of similarity in the shape of the resulting, phased light curves further constrained the period from about 7.35 to 7.60 days. Allowing for the inherent limitations of the 1910 data, comparison of these light curves to the equivalent 1986 light curve indicates that a match in features between the two apparitions is made possible by utilizng one of two phase shifts. While not conclusive, this ability to match features suggests long-term stability in many aspects of Halley's intrinsic activity.

Schleicher, David G.↗