Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Verification of data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗

A Discussion of Time Management Concepts and Time Constraint Equations for Multi-Rate Federation Executions

The High Level Architecture (HLA) is a simulation interoperability standard developed by the Simulation Interoperability Standards Organization (SISO) and published as the international standard IEEE 1516-2010 by the Institute for Electrical and Electronics Engineers (IEEE). HLA is a widely used standard for the development and execution of collaborative distributed simulations. HLA provides a number of Management Services to simulation developers: Federation, Declaration, Object, Ownership, Data Distribution, and Time. Of those services, Time Management Services is probably one of the least understood and least used. However, Time Management Services are critical to technical simulations like those created for space systems using the Space Reference Federation Object Model (SpaceFOM). Time Management can be used to insure data coherence and execution repeatability in distributed simulations. When combined with real time execution policies, Time Management is being used to support real time execution of mixed software and hardware in the loop integration, verification, and validation simulations for active space systems development. This paper starts by providing an overview of the HLA Time Management Services. This provides the background to discuss the challenges associated with Time Management and its use, starting with simple common rate frame scheduled simulations, then simple multi-rate simulations, and ending with complex mixed rate simulations. The authors then formulate the significant time constraint relationships between identified frame scheduling parameters. The intent of the paper is to provide a concise discussion of how to use Time Management in both simple cases and in more complex mixed frame rate federation executions.

Simulation Interoperability↗

Verification and Validation Tests of Gamma Library of MC2-3 for Coupled Neutron and Gamma Heating Calculation

For the accurate assessment of the heat generation rate in fast reactors, the gamma library of MC2 -3 and the MC2 -3 + GAMSOR procedure employing the coupled neutron and gamma heating calculation has been thoroughly verified against Monte Carlo results and validated using the ZPPR-15D gamma dose measurement data. NJOY outputs are post-processed in a consistent way with the NJOY procedure to avoid any missing data or double counting of data. Prompt heating for 379 out of 391 isotopes in the gamma library was verified against MCNP6.2 to within 1% relative error in total heating for most isotopes. For both a simple one-dimensional slab problem representing a sodium cooled fast reactor and the Experimental Breeder Reactor II (EBR-II) benchmark problem, the root-mean-square values of assembly power error were less than 0.5% for fuel assemblies, ~1% in blankets and ~1 to ~3% in reflectors compared to MCNP6.2 results. The most plausible cause for the 3% error in a reflector assembly is believed to be the error in the multigroup neutron cross sections for the reflector assembly. For validation, gamma doses measured with thermoluminiscent dosimeters (TLDs) in the ZPPR-15D experiment were calculated using GAMSOR. Due to the uncertainty in the TLD measurement with regards to the energy deposition of photons and neutrons, the validation data leads to a 12.7% uncertainty on the experimental measurement. With this uncertainty bound, the calculated doses all fell within one standard deviation of the measured value. Combined with the accurate calculation of reaction rate distributions and neutron spectrum measurements, these results indicate good agreement for the neutron and gamma heating calculations that were performed.

coupled neutron and gamma heating↗

AI for Nuclear Safeguards Verification

The International Atomic Energy Agency (IAEA) utilizes AI/ML to analyze open-source information, including satellite imagery and scientific publications, to verify the completeness of State declarations regarding nuclear activities. AI/ML already assist the IAEA with automating processes and analysis of large datasets, including satellite imagery and unstructured data, improving efficiency and effectiveness of safeguards implementation. AI/ML in nuclear safeguards come with its own challenges that include the need for large, unbiased datasets, the risk of AI-generated fake information, including the potential for manipulation of satellite imagery.

97 MATHEMATICS AND COMPUTING↗

Summary of results and conclusions based on analysis of volume imaging and high spectral resolution lidar data acquired during FIRE phase 1, part 1

The collection of long term global statistics on cloud cover may be most easily accomplished with satellite based observations; however, measurements derived from passive satellite retrieval methods must be calibrated and verified by in situ or ground based remote sensor observations. Verification is not straight forward, however, because the highly variable nature of cloud altitude, morphology, and optical characteristics complicates the scaling of point measurements to satellite footprint sized areas. This is particularly evident for cirrus clouds which may be organized on horizontal scales of 10's of meters to 8 km or more, and have optical depths ranging from less than .003 to greater than 3. Cirrus clouds can strongly influence earths' radiative balance, but, because they are often transmissive, cirrus clouds are difficult to detect and characterize from satellite measurements. Because of its precise ranging capabilities, spatial resolution and sensitivity, lidar observations have played an important role in the detection, depiction, and characterization of cirrus clouds. Some of the characteristics of cirrus clouds are summarized which observed the High Spectral Resolution and Volume Imaging Lidars during the phase 1 IFO and ETO periods.

Grund, Christian J.↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Payload Performance of Third Generation TDRS and Future Services

NASA has accepted two of the 3rd generation Tracking and Data Relay Satellites, TDRS K, L, and M, designed and built by Boeing Defense, Space & Security (DSS). TDRS K, L, and M provide S-band Multiple Access (MA) service and S-band, Ku-band and Ka-band Single Access (SA) services to near Earth orbiting satellites. The TDRS KLM satellites offer improved services relative to the 1st generation TDRS spacecraft, such as: an enhanced MA service featuring increased EIRPs and G/T; and Ka-band SA capability which provides a 225 and 650 MHz return service (customer-to-TDRS direction) bandwidth and a 50 MHz forward service (TDRS-to-customer direction) bandwidth. MA services are provided through a 15 element forward phased array that forms up to two beams with onboard active beamforming and a 32 element return phased array supported by ground-based beamforming. SA services are provided through two 4.6m tri-band reflector antennas which support program track pointing and autotrack pointing. Prior to NASAs acceptance of the satellites, payload on-orbit testing was performed on each satellite to determine on-orbit compliance with design requirements. Performance parameters evaluated include: EIRP, G/T, antenna gain patterns, SA antenna autotrack performance, and radiometric tracking performance. On-orbit antenna calibration and pointing optimization was also performed on the MA and SA antennas including 24 hour duration tests to characterize and calibrate out diurnal effects. Bit-Error-Rate (BER) tests were performed to evaluate the end-to-end link BER performance of service through a TDRS K and L spacecraft. The TDRS M is planned to be launched in August 2017. This paper summarizes the results of the TDRS KL communications payload on-orbit performance verification and end-to-end service characterization and compares the results with the performance of the 2nd generation TDRS J. The paper also provides a high-level overview of an optical communications application that will augment the data rates supported by the Space Network.

RF↗

Payload Performance of TDRS KL and Future Services

NASA has accepted two of the 3nd generation Tracking and Data Relay Satellites, TDRS K, L, and M, designed and built by Boeing Defense, Space Security (DSS). TDRS K, L, and M provide S-band Multiple Access (MA) service and S-band, Ku-band and Ka-band Single Access (SA) services to near Earth orbiting satellites. The TDRS KLM satellites offer improved services relative to the 1st generation TDRS spacecraft, such as: an enhanced MA service featuring increased EIRPs and GT; and Ka-band SA capability which provides a 225 and 650 MHz return service (customer-to-TDRS direction) bandwidth and a 50 MHz forward service (TDRS-to-customer direction) bandwidth. MA services are provided through a 15 element forward phased array that forms up to two beams with onboard active beamforming and a 32 element return phased array supported by ground-based beamforming. SA services are provided through two 4.6m tri-band reflector antennas which support program track pointing and autotrack pointing. Prior to NASAs acceptance of the satellites, payload on-orbit testing was performed on each satellite to determine on-orbit compliance with design requirements. Performance parameters evaluated include: EIRP, GT, antenna gain patterns, SA antenna autotrack performance, and radiometric tracking performance. On-orbit antenna calibration and pointing optimization was also performed on the MA and SA antennas including 24 hour duration tests to characterize and calibrate out diurnal effects. Bit-Error-Rate (BER) tests were performed to evaluate the end-to-end link BER performance of service through a TDRS K and L spacecraft. The TDRS M is planned to be launched in August 2017. This paper summarizes the results of the TDRS KL communications payload on-orbit performance verification and end-to-end service characterization and compares the results with the performance of the 2nd generation TDRS J. The paper also provides a high-level overview of an optical communications application that will augment the data rates supported by the Space Network.

Laser↗

Operational Modal Analysis of the Space Launch System Mobile Launcher on the Crawler Transporter ISVV-010 Rollout

NASA is developing an expendable heavy lift launch vehicle capability, the Space Launch System, to support lunar and deep space exploration. To support this capability, an updated ground infrastructure is required including modifying an existing Mobile Launcher system. The Mobile Launcher is a very large heavy beam/truss steel structure designed to support the Space Launch System during its buildup and integration in the Vehicle Assembly Building, transportation between the Vehicle Assembly Building and launch pad 39B by the Crawler Transporter, and provides the launch platform at the launch pad. As part of the Verification and Validation of the Mobile Launcher and Crawler Transporter, two rollouts of the Mobile Launcher transported by the Crawler Transporter, Integrated System Verification and Validation (ISVV) 005 and 010, have been performed to demonstrate the Crawler Transporter’s ability to transport the Mobile Launcher. ISVV-005 occurred in September 2018 and ISVV-010 occurred in late June 2019. ISVV-005 and ISVV-010 also provided the opportunity to gather data that can be used identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics and refine the estimates of the Artemis I integrated launch vehicle rollout forcing functions. While the rollout environment has historically produced relatively small launch vehicle structural loads for the Saturn/Apollo and Space Shuttle programs in comparison to launch and ascent loads, these relatively small structural loads are inputs to structural fatigue analyses. The same holds true for the Space Launch System. Because the rollout forces acting on the Mobile Launcher and the Crawler Transporter are not directly measurable, Operational Modal Analysis techniques, instead of traditional Experimental Modal Analysis techniques, provide an empirical means to identify the Mobile Launcher on the Crawler Transporter rollout modal characteristics. The ISVV-010 rollout modal characteristics provide important supplemental modal information, which along with the Mobile Launcher modal test that was performed in June 2019 immediately prior to ISVV-010 rollout, combine to reduce uncertainty in the test correlated Mobile Launcher on the Crawler Transporter finite element model. A well test correlated finite element model will play a key role in the Building Block approach the Space Launch System program has implemented as part of its certification process for the Artemis I flight and in refining the Artemis I rollout forcing functions. At the time of the ISVV-005 rollout in September 2018, the Mobile Launcher was still undergoing construction, and therefore its modal characteristics are not directly comparable to those of the Mobile Launcher during the June 2019 Mobile Launcher modal test and subsequent ISVV-010 rollout. Hence the ISVV-005 rollout modal characteristics will not be looked at in this paper. This paper will briefly describe the Mobile Launcher and Crawler Transporter physical characteristics, ISVV-010 rollout data collection, the challenges in implementing Operational Modal Analysis techniques due in part to the Crawler Transporter harmonics, and how these challenges were overcome to obtain the ISVV-010 Mobile Launcher on the Crawler Transporter rollout modal characteristics.

Apollo↗

Flight performance of the High Energy Astronomy Observatory /HEAO 1/ power subsystem

The design and flight performance of the HEAO-1 power subsystem is described. Solar array power analysis and test data are compared to orbital performance. The batteries are described along with parametric cell tests which led to the temperature-compensated voltage limits used in the charge controls. Battery life test results, used for verification of battery charger temperature-compensated voltage limits, are compared with orbital performance. The control electronics are

Reppucci, G. M.↗

Station stability measurement

Methods and instrumentation are being developed to determine the frequency stability of Deep Space Stations. The efforts are presently focused on the verification of the stability of the X-band uplink and other RF and microwave subsystems which contribute to the overall stability of the system. The measurement methodology is presented as well as frequency stability data generated with the development measurement system. The system characteristics are highlighted and the potential areas where improvements could be made are discussed.

Sosa, E. N.↗

Image based SAR product simulation for analysis

SAR product simulation serves to predict SAR image gray values for various flight paths. Input typically consists of a digital elevation model and backscatter curves. A new method is described of product simulation that employs also a real SAR input image for image simulation. This can be denoted as 'image-based simulation'. Different methods to perform this SAR prediction are presented and advantages and disadvantages discussed. Ascending and descending orbit images from NASA's SIR-B experiment were used for verification of the concept: input images from ascending orbits were converted into images from a descending orbit; the results are compared to the available real imagery to verify that the prediction technique produces meaningful image data.

Domik, G.↗

Meteorological radar methods for validating space observations of precipitation

Meteorological approaches to verification of space measurements of rainfall are examined; validation of Tropical Rainfall Measuring Mission (TRMM) observations is expected to depend significantly on ground-based radars. Two methods of comparison are initially contemplated. TRMM rainfall data over time periods of a month for large areas (500 x 500 km) are averaged and compared with similarly averaged ground truth measurements. Both the rainfall and height distribution data from TRMM are compared with the instantaneous values observed at one or more 'ground truth' stations and from airborne radar and radiometers as available.

Thiele, Otto W.↗

Extended Operation of Stirling Convertors

A high-efficiency 110 W Stirling Radioisotope Generator 110 (SRG110) is being developed for potential NASA exploration missions. The SRG system efficiency is greater than 20%, making it an attractive candidate power system for deep space missions and unmanned rovers. The Department of Energy SRG110 Project team consists of the System Integrator, Lockheed Martin (LM), Stirling Technology Company (STC), and NASA Glenn Research Center (GRC). One of the GRC roles is to provide Independent Verification and Validation of the Stirling TDC s. At the request of LM, a part of this effort includes the Extended Operation of the TDC s in the dynamically balanced dual-opposed configuration. Performance data of Stirling Convertors over time is required to demonstrate that an SRG110 can meet long-duration mission requirements. A test plan and test system were developed to evaluate TDC s #13 and #14 steady-state performance for a minimum of 5000 hours. Hardware, software and TDC preparation processes were developed to support this test and insure safe, round-the-clock operation of the TDC s. This paper will discuss the design and development, and status of the Extended Operation Test.

Roth, Mary Ellen↗

Extended Operation of Stirling Convertors

A high-efficiency 110 watt Stirling Radioisotope Generator 110 (SRG110) is being developed for potential NASA exploration missions. The SRG system efficiency is greater than 20%, making it an attractive candidate power system for deep space missions and unmanned rovers. The Department of Energy SRG110 Project team consists of the System Integrator, Lockheed Martin (LM), Stirling Technology Company (STC), and NASA Glenn Research Center (GRC). One of the GRC roles is to provide Independent Verification and Validation of the Stirling TDC's. At the request of LM, a part of this effort includes the extended operation of the TDC's in the dynamically balanced dual-opposed configuration. Performance data of the Stirling Converters over time is required to demonstrate that an SRG110 can meet long-duration mission requirements. A test plan and test system were developed to evaluate TDC's #13 and #14 steady-state performance for a minimum of 5000 hours and insure safe, round-the-clock operation of the TDC's. This paper will discuss the design and development, and status of the Extended Operation Test.

Roth, Mary Ellen↗

Validation and Verification of Composite Pressure Vessel Design

Ten composite pressure vessels were instrumented with fiber Bragg grating sensors and pressure tested Through burst. This paper and presentation will discuss the testing methodology, the test results, compare the testing results to the analytical model, and also compare the fiber Bragg grating sensor data with data obtained against that obtained from foil strain gages.

Kreger, Stephen T.↗

Verification and Validation of NASA-Supported Enhancements to PECAD's Decision Support Tools

The NASA Applied Sciences Directorate (ASD), part of the Earth-Sun System Division of NASA's Science Mission Directorate, has partnered with the U.S. Department of Agriculture (USDA) to enhance decision support in the area of agricultural efficiency-an application of national importance. The ASD integrated the results of NASA Earth science research into USDA decision support tools employed by the USDA Foreign Agricultural Service (FAS) Production Estimates and Crop Assessment Division (PECAD), which supports national decision making by gathering, analyzing, and disseminating global crop intelligence. Verification and validation of the following enhancements are summarized: 1) Near-real-time Moderate Resolution Imaging Spectroradiometer (MODIS) products through PECAD's MODIS Image Gallery; 2) MODIS Normalized Difference Vegetation Index (NDVI) time series data through the USDA-FAS MODIS NDVI Database; and 3) Jason-1 and TOPEX/Poseidon lake level estimates through PECAD's Global Reservoir and Lake Monitor. Where possible, each enhanced product was characterized for accuracy, timeliness, and coverage, and the characterized performance was compared to PECAD operational requirements. The MODIS Image Gallery and the GRLM are more mature and have achieved a semi-operational status, whereas the USDA-FAS MODIS NDVI Database is still evolving and should be considered

McKellipo, Rodney↗

An Update on the Lithium-Ion Cell Low-Earth-Orbit Verification Test Program

A Lithium-Ion Cell Low-Earth-Orbit Verification Test Program is being conducted by NASA Glenn Research Center to assess the performance of lithium-ion (Li-ion) cells over a wide range of low-Earth-orbit (LEO) conditions. The data generated will be used to build an empirical model for Li-ion batteries. The goal of the modeling will be to develop a tool to predict the performance and cycle life of Li-ion batteries operating at a specified set of mission conditions. Using this tool, mission planners will be able to design operation points of the battery system while factoring in mission requirements and the expected life and performance of the batteries. Test conditions for the program were selected via a statistical design of experiments to span a range of feasible operational conditions for LEO aerospace applications. The variables under evaluation are temperature, depth-of-discharge (DOD), and end-of-charge voltage (EOCV). The baseline matrix was formed by generating combinations from a set of three values for each variable. Temperature values are 10 C, 20 C and 30 C. Depth-of-discharge values are 20%, 30% and 40%. EOCV values are 3.85 V, 3.95 V, and 4.05 V. Test conditions for individual cells may vary slightly from the baseline test matrix depending upon the cell manufacturer s recommended operating conditions. Cells from each vendor are being evaluated at each of ten sets of test conditions. Cells from four cell manufacturers are undergoing life cycle tests. Life cycling on the first sets of cells began in September 2004. These cells consist of Saft 40 ampere-hour (Ah) cells and Lith ion 30 Ah cells. These cells have achieved over 10,000 cycles each, equivalent to about 20 months in LEO. In the past year, the test program has expanded to include the evaluation of Mine Safety Appliances (MSA) 50 Ah cells and ABSL battery modules. The MSA cells will begin life cycling in October 2006. The ABSL battery modules consist of commercial Sony hard carbon 18650 lithium-ion cells configured in series and parallel combinations to create nominal 14.4 volt, 3 Ah packs (4s-2p). These modules have accumulated approximately 3000 cycles. Results on the performance of the cells and modules will be presented in this paper. The life prediction and performance model for Li-ion cells in LEO will be built by analyzing the data statistically and performing regression analysis. Cells are being cycled to failure so that differences in performance trends that occur at different stages in the life of the cell can be observed and accurately modeled. Cell testing is being performed at the Naval Surface Warfare Center in Crane, IN.

Reid, Concha M.↗