Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada, (Rev.0, with ROTC 1)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site (formerly, the Nevada Test Site): 25-41-03, EMAD Facility; 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV); and 25-33-05, Building 3901, Engine Transport System Maintenance Building. This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the SAFER Plan, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report will be prepared and submitted to NDEP for review and approval. The schedule for completion of the closure report will be established at the FFACO annual meeting.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Security, LLCSite 300: Toxic Emissions Inventory Plan for ABA 2588 California Air Toxics "Hot Spots" Information and Assessment Act of 1987 (Revision 3.0)

The Air Toxics "Hot Spots" Information and Assessment Act (AB 2588 or the “Act”) was enacted in September 1987. Under the Act, stationary sources are required to report the types and quantities of certain toxic substances their facilities routinely release into the air. AB 2588 is designed to provide information to state and local agencies and to the general public on the extent of airborne emissions from stationary sources and the potential public health impacts of those emissions. The San Joaquin Valley Air Pollution Control District (the District) is mandated by the State to implement AB 2588. On March 6, 2015, The State Office of Environmental Health Hazard Assessment (OEHHA) adopted changes to the Air Toxics Hot Spots Program Guidance Manual for the Preparation of Health Risk Assessments. These revisions were designed to incorporate three technical support documents and to provide enhanced protection of children as required under state law (SB 25, Escutia, 1999). Due to these recent changes, and the corresponding potential increases in calculated health risk, the District notified LAWRENCE LIVERMORE NATIONAL SECURITY, LLC that we must be re-evaluated under AB 2588. Pursuant to the Air Toxics "Hot Spots" Information and Assessment Act of 1987, we have prepared a comprehensive, site-specific Toxics Emissions Inventory Plan. The plan specifies in detail how LAWRENCE LIVERMORE NATIONAL SECURITY, LLC will inventory our facility's emissions of all toxic substances on the list of substances subject to the Act. The plan provides a comprehensive and detailed description of the methods that will be used to quantify air releases or potential air releases of listed substances from all points of release. The plan also includes quantification methods which result in accurate and comprehensive characterization of releases and comply with all applicable requirements of the “Hot Spots” regulation.

54 ENVIRONMENTAL SCIENCES↗

The Low-Yield Nuclear Monitoring (LYNM) Experimental Science Plan

The Low-Yield Nuclear Monitoring (LYNM) Program is a long-term NNSA research and development effort designed to improve the United States’ explosion monitoring capabilities, particularly with respect to low-yield and potentially evasive underground nuclear testing. The LYNM Program focuses on researching, discovering, and exploiting unique and useful signatures, from all available technologies and sensors (e.g., seismic, acoustic, electromagnetic, gases, and particulates (both stable and radioactive)). Four Department of Energy laboratories participate in LYNM and together are referred to as the ‘quad-lab’. The R&D program execution is performed under NNSA defined structures known as “ventures”. Four science ventures were established: 1) Explosion Source Functions; 2) Containment of Low-Yield Underground Tests; 3) Local Signatures; 4) Dynamic Monitoring Networks. To organize and execute the large field scale experiment a fifth venture was established: 5) Physics Experiment One (PE-1). As part of the LYNM Program, a series of experiments are planned at various scales and levels of venture involvement. These vary from those that involve a subset of labs and/or LYNM ventures (e.g., small experiments), to full quad-lab LYNM Program field-scale integrated experiments. Such experiments may involve chemical explosions with tracer materials or other means of simulating the expected signals from a nuclear explosion. The LYNM Program does not conduct actual nuclear explosions. Since 1992, the U.S. has observed a moratorium on underground nuclear explosions. This document is intended to provide the underlying scientific basis for the LYNM planned experimental work. Each specific LYNM experiment will develop a goals, objectives, and requirements (GOR) plan following the guidance in this document. The LYNM technical staff will define the numbers and types of experiments required over the course of the Program based on technical needs and within funding constraints. As with any scientific experiment series, the number and types of experiments may change based upon the experimental results obtained. An experiment that agrees with models/codes/software signature predictions may need fewer repetitions/variations, depending upon the level of statistical rigor desired, as compared to one in which the predictions and experimental data do not match. The large LYNM field-scale integrated experiments require the longest lead-time for planning, and these are discussed in more detail near the end of this document.

58 GEOSCIENCES↗

Hanford Tank Farm Occupational Exposure and Risk Assessment Plan: Health Process Project (Rev.1)

The overall objective of the Hanford Tank Farm Occupational Exposure and Risk Assessment Plan (hereafter referred to as the “Assessment Plan”) is to provide the Tank Operations Contractor (TOC), Washington River Protection Solutions (WRPS), and the U.S. Department of Energy (DOE) with a plan for developing a transparent, peer-reviewed process for assessing potential health risks associated with worker exposures to chemical emissions from the Hanford tank farms. Revision 1 (2018) incorporates changes to the original draft plan prepared in 2016 to reflect updated strategies based on initial implementation of the recommended actions.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Invasive Plant Species Management Plan for Los Alamos National Laboratory (Rev.3)

Native species are plants and animals that continually occupy a natural range without direct or indirect introduction and/or care by humans. They are adapted to the environmental conditions and processes of the ecosystem in which they reside. A species introduced into a novel ecosystem can either exploit that ecosystem and thrive or be unable to survive in that ecosystem (Hobbs et al. 2006). Alien or non-native species are species that are intentionally or accidentally introduced into a novel ecosystem and are capable of living and propagating within the physical parameters of that ecosystem. Invasive species is a species that is non-native (or alien) to the ecosystem under consideration and a noxious species are those whose introduction causes or is likely to cause economic or environmental harm. The term invasive species is applicable to plants and animals alike; however, this invasive species management plan currently focuses on invasive vegetation. Invasive plant species are usually capable of rapid colonization of disturbed ground, such as after a change in wildfire regime intensity and frequency (Reilly et al. 2020) or anthropogenic ground disturbance (Burke and Grime 1996; Hobbs and Huenneke 1992). Climate change facilitates the spread and establishment of many alien species and creates new opportunities for them to become invasive (Turbelin and Catford 2021). As climate change impacts increase in the coming decades, we may see in an increase in invasive species establishment. See a list of definitions of terms pertinent to this document in Appendix A: Definitions. Los Alamos National Laboratory (LANL) hosts populations of non-native and invasive species all typical of the northern New Mexico region (Martin 2004; NMDA 2020). By implementing an invasive species management plan, LANL will have readily accessible management strategies for invasive species that are found on-site. The benefits of managing invasive species include a decrease in wildland fire risks, an increase in soil productivity, an increase in (productive or beneficial) wildlife habitat, an increase in water quantity and quality, and the restoration of impacted areas (Burke and Grime 1996; Hobbs and Huenneke 1992; D’Antonio and Hobbie 2005; MacDougall et al. 2013; Reilly et al. 2020). The aforementioned benefits from invasive species management directly enable the LANL mission by ensuring compliance requirements are met and site-wide programs, such as the Vulnerability Assessment and Resilience Plan, are supported for a mutually beneficial outcome. An example for the LANL site specifically, controlling non-native annual plant species, for example, could reduce the costs associated with stabilizing soils during the stormwater pollution prevention compliance process. Roadway and utility right-of-way areas are another place where an integrated vegetation management strategy would promote low growing perennial plants in a way that is mutually beneficial to habitat and the institution through lowered maintenance costs. There is also an economic benefit to managing invasive species. In one nationwide study, invasive plants had an estimated impact cost of $190.45 billion (Fantel-Lepczyk et al. 2022). Investing in preventative measures and surveillance could help to offset future control and management costs of invasive species that have the potential to become established. The State of New Mexico has developed plant species lists and recommendations through the New Mexico Department of Agriculture’s Noxious Weeds Management Act, Article 7D (NM Statute § 76-7D-4 2021); however, effective invasive species management must rely on local knowledge of the site and region. Los Alamos County (LAC) has already compiled a target invasive plant species list and species-specific management objectives (Martin 2004). Therefore, the New Mexico Noxious Weed List and the LAC invasive plant species list, as well as management objectives from those documents, are integrated into LANL’s invasive plant species management plan.

54 ENVIRONMENTAL SCIENCES↗

Developing a Facility NMAC Plan

The table presented below suggests the basic information that should be covered in a facility NMAC Plan for an NMAC program that is designed for nuclear security. The topics are appropriate for and should be addressed by all facilities in their NMAC Plans. They are appropriate for NMAC Plans for nuclear power plants, research reactors, fuel manufacturing facilities, facilities that produce medical isotopes, and other facilities. The difference is in the intensity with which the various measures are applied and the thoroughness of the description of the application (i.e., the program requirements). The robustness of a facility NMAC program and the content of its NMAC Plan should be graded in accordance with the type of facility and the category of its nuclear material.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

EMP, Attachment 1: Sampling and Analysis Plan (Rev.1)

This Sampling and Analysis Plan (SAP) is written for the Environmental Radiation Task activities related to radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance of Pacific Northwest National Laboratory (PNNL) operations at the PNNL-Richland campus and PNNL-Sequim campus. PNNL is a U.S. Department of Energy Office of Science laboratory in Richland, Washington. This plan is an attachment to PNNL’s Environmental Radiological Air Monitoring Plan (EMP) (PNNL-20919) and addresses a discrete, vital subject area that is subject to revision independent of the main text of the EMP document. This SAP provides the requirements for planning sampling events and the requirements imposed on the services provided by the analytical laboratory to the PNNL Environmental Radiation Task.

40 CFR 61 Subpart H↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

EMP - Environmental Radiological Air Monitoring Plan: PNNL Operations in Washington

The Environmental Radiological Air Monitoring Plan (EMP) for Pacific Northwest National Laboratory (PNNL) describes systems/processes/practices related to radiological operations in Richland and Sequim, Washington, that are associated with environmental radiological air monitoring and surveillance activities. The activities described support the lab’s responsibility to maintain safe operations and minimize negative impacts to both onsite and offsite persons and environment. Dose assessments required by regulations and DOE Orders for the public and biota are described. PNNL conducts environmental air surveillance monitoring as part of the PNNL Site Radioactive Air Emissions License (RAEL)-005 for Richland Campus, issued in 2010 with its most recent renewal effective in January 2021. The radioactive air emissions license for the PNNL-Sequim campus (RAEL-014) was issued to the U.S. Department of Energy in 2012 with its most recent renewal effective in January 2023. The EMP is a compilation of the following four documents: - Environmental Radiological Air Monitoring Plan (this main document) (PNNL-20919) - Sampling and Analysis Plan (Attachment 1) (PNNL-20919-1) - Data Management Plan (Attachment 2) (PNNL-20919-2) - Dose Assessment Guidance (Attachment 3) (PNNL-20919-3).

40 CFR 61 Subpart H↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Transparency in Electric Distribution System Planning to Support Affordability [Slides]

This resource identifies opportunities for communities to participate in the distribution system planning process to achieve their energy goals, including affordability. It begins with background information on the distribution system and distribution system planning, and then focuses on topical areas where communities could focus their engagement (e.g., non-wires alternatives, DER forecast, scenario analysis). The report concludes with illustrative examples of how communities have engaged in distribution system planning. The appendix provides procedural guidance on engagement in utility planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SiC cladding R&D execution plan

To advance the development of accident-tolerant fuel cladding for light-water reactors, the Advanced Fuels Campaign actively addresses the R&D gap between the specialized technological progress in SiC-based composite materials, led by industrial partners, and the fundamental scientific understanding of material behavior under reactor operating conditions. The laboratory activities are systematically organized based on the Development Strategy document, which outlines critical barriers to the use of SiC composites in nuclear energy applications for the coming decade and beyond. To complement the strategy, this execution plan specifies a detailed year-by-year work package and establishes key milestones for assessing progress in technological advancement. This plan has been formulated in collaboration with principal investigators at national laboratories, stakeholders, and industry partners with the goal of closing technology gaps and readying SiC-based cladding technologies for full-scale commercial testing. The research conducted at the national laboratories is categorized into three primary subjects: (1) addressing challenges associated with the performance of SiC cladding under normal operating environments, (2) identifying the failure limits of SiC cladding under accident conditions, and (3) modeling fuel performance for SiC cladding systems. Comprehensive laboratory activities integrate the development of advanced modeling tools for SiC-based cladding systems with experimental validation via integrated testing of multiphysics phenomena. This document lays out the laboratory plan to support the development of SiC-based technologies, which have the potential for significant operational and safety benefits for the U.S. nuclear industry. This plan aligns with industry developer needs, relevant Nuclear Energy University Programs, and Nuclear Energy Advanced Modeling and Simulation Programs to ensure SiC cladding technologies are matured as efficiently as possible and will be maintained and updated to accommodate the dynamically evolving progress of development, capability needs, and resource availability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

HWMA/RCRA Closure Plan for the CPP-602 Laboratory Lines

This Hazardous Waste Management Act/Resource Conservation and Recovery Act Closure (HWMA/RCRA) Plan for the CPP-602 laboratory lines was developed to meet the tank system closure requirements of the Idaho Administrative Procedures Act 58.01.05.008 and 40 Code of Federal Regulations 264, Subpart G. CPP-602 is located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The lines in CPP-602 were part of a liquid hazardous waste collection system included in the Idaho Nuclear Technology and Engineering Center Liquid Waste Management System Permit. The laboratory lines discharged to the Deep Tanks System in CPP-601 that is currently being closed under a separate closure plan. This closure plan presents the closure performance standards and the methods for achieving those standards. The closure approach for the CPP-602 laboratory lines is to remove the lines, components, and contaminants to the extent practicable. Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Site CPP-117 includes the CPP-602 waste trench and the area beneath the basement floor where waste lines are direct-buried. Upon completion of rinsing or mopping to remove contamination to the extent practicable from the waste trench and rinsing the intact buried lines (i.e., stainless steel sections), these areas will be managed as part of CERCLA Site CPP-117 and will not be subject to further HWMA/RCRA closure activities. The CPP-602 building is being decontaminated and decommissioned under CERCLA as a non-time critical removal action in accordance with the Federal Facility Agreement/Consent Order. As such, all waste generated by this CERCLA action, including closure-generated waste, will be managed in coordination with that CERCLA action in substantive compliance with HWMA/RCRA regulations. All waste will be subject to a hazardous waste determination for the purpose of supporting appropriate management and will be managed in accordance with this plan. ii

36 MATERIALS SCIENCE↗

LCLS Undulator Test Plan

This note presents the test plan for the LCLS undulators. The undulators will be measured and tuned in the Magnetic Measurement Facility at SLAC. The requirements for tuning are well established and are summarized. A brief discussion of the measurement equipment is presented. This is followed by the detailed test plan in which each step is enumerated. Finally, the measurement results and storage format are presented. The LCLS consists of 33 undulator segments, hereafter referred to as undulators, plus 6 spares and one reference undulator. The undulators must be tuned to meet strict requirements. They must also be fiducialized to allow alignment with other components. This note details the plan for tuning and fiducializing the LCLS undulators. The note begins with the list of tuning and fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a detailed test plan in which all the steps of tuning and fiducialization are enumerated.

43 PARTICLE ACCELERATORS↗

American particle and nuclear physics planning

In the United States the planning process relevant to future deep inelastic scattering involves both the high energy physics and nuclear physics funding and the two communities. In Canada there is no such split between the communities. Within the past two years there have been several planning initiatives and there may be more to come. We review the current status of both the planning and the plans.

Montgomery, Hugh E.↗

Hurricane Preparedness and Control Plan

This plan establishes policy and sets forth guidance, responsibilities and procedures utilized by Federal Electric Corp., communications department in support of the KSC Emergency Preparedness Plan, Annex A, Hurricane Control Plan (GP-355) dated 27 May 1971. This plan covers all FEC communications department personnel, facilities, and equipment situated at the Kennedy Space Center that are the responsibility of FEC contract NAS 10-4967.

Source record↗