Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,711 records · Page 95

A program for the investigation of the Multibody Modeling, Verification, and Control Laboratory

The Multibody Modeling, Verification, and Control (MMVC) Laboratory is under development at NASA MSFC in Huntsville, Alabama. The laboratory will provide a facility in which dynamic tests and analyses of multibody flexible structures representative of future space systems can be conducted. The purpose of the tests are to acquire dynamic measurements of the flexible structures undergoing large angle motions and use the data to validate the multibody modeling code, TREETOPS, developed under sponsorship of NASA. Advanced control systems design and system identification methodologies will also be implemented in the MMVC laboratory. This paper describes the ground test facility, the real-time control system, and the experiments. A top-level description of the TREETOPS code is also included along with the validation plan for the MMVC program. Dynamic test results from component testing are also presented and discussed. A detailed discussion of the test articles, which manifest the properties of large flexible space structures, is included along with a discussion of the various candidate control methodologies to be applied in the laboratory.

Tobbe, Patrick A.↗

Improving Resiliency in Planning MW-Scale Medium and Heavy Duty EV Charging Stations Considering TSCOTS Optimization

Electrification of heavy-duty (HD) vehicles marks an important milestone and technical challenge in the electric vehicle (EV) industry and the public grid. However, implementing EV charging at this scale will necessitate that traditional truck stops be updated with EV charging infrastructure that could represent 10's of MW in electricity consumption. Furthermore, as the transportation sector is represented as critical infrastructure, supporting resiliency considerations in EV charging infrastructure will be critical. This paper proposes an optimization-based approach for optimally designing a MW-scale microgrid charging network. This approach transforms conventional designed truck stops into a reliable HDEV charging stations capable of overnight slow charging and 30-minute to 1 hour fast charging. Using a mixed-integer linear program formulation blending capacity planning and reliability constraints, an optimal network configuration can be solved for a proposed EV charging station that includes photovoltaic and battery energy storage capabilities.

Ponce, Moises [University of Tennessee, Knoxville ↗

Challenging the Future - Journey to Excellence. Aeropropulsion strategic plan for the 1990's

Over the past several months, the Lewis Aeropropulsion Management Council (AMC) has conducted a critical assessment of its strategic plan. This assessment clearly indicated a need for change, both in the aeropropulsion program emphasis and in the approach to carrying out that program. Customers sent a strong message that the program must improve the timeliness of research and technology products and services and must work more closely with them to develop and transfer new technology. The strategic plan defines AMC's vision for the future and underlying organizational values. It contains a set of broad strategies and actions that point the way toward achieving the goals of customer satisfaction, organizational effectiveness, and programmatic excellence. Those strategies are expected to form the basis for the development of specific tactical plans by Lewis aeropropulsion thrust teams, divisions, and branches. To guide tactical planning of the aeropropulsion program, this strategic plan outlines the agency's strategic directions and long-range aeronautics goals, the aeropropulsion goals and key objectives for achieving them, projections of Lewis aeropropulsion budgets, planned allocations of resources, and the processes that will be used to measure success in carrying out the strategic plan.

Source record↗

Component-Level Electronic-Assembly Repair (CLEAR) System Architecture

This document captures the system architecture for a Component-Level Electronic-Assembly Repair (CLEAR) capability needed for electronics maintenance and repair of the Constellation Program (CxP). CLEAR is intended to improve flight system supportability and reduce the mass of spares required to maintain the electronics of human rated spacecraft on long duration missions. By necessity it allows the crew to make repairs that would otherwise be performed by Earth based repair depots. Because of practical knowledge and skill limitations of small spaceflight crews they must be augmented by Earth based support crews and automated repair equipment. This system architecture covers the complete system from ground-user to flight hardware and flight crew and defines an Earth segment and a Space segment. The Earth Segment involves database management, operational planning, and remote equipment programming and validation processes. The Space Segment involves the automated diagnostic, test and repair equipment required for a complete repair process. This document defines three major subsystems including, tele-operations that links the flight hardware to ground support, highly reconfigurable diagnostics and test instruments, and a CLEAR Repair Apparatus that automates the physical repair process.

Oeftering, Richard C.↗

Becoming a 10: A Closer Look at the U.S. Department of Energy Home Energy Score's Updates, Improvements, and Expansion

The U.S. Department of Energy (DOE)'s Home Energy Score provides homeowners, buyers, and renters directly comparable and credible information about a home's estimated energy use and costs. Certified Qualified Assessors conduct low-cost assessments to provide each home a 1-10 score alongside a set of cost-effective upgrades to improve the score. As of February 2022, hundreds of assessors have delivered over 175,000 scores to homes across the country. Originally released in 2012 using DOE2.1e as the modeling backend, after years of effort, a new version of Home Energy Score was released in 2021 utilizing DOE's flagship energy modeling software, EnergyPlus. The updated architecture leverages modeling advancements and enables new building technologies to be added to the Scoring Tool. The new release represents a leap forward in harmonizing modeling assumptions across DOE and industry programs. In this paper we discuss the rigorous approach to model comparison with DOE2 undertaken prior to the update, utilizing test homes and real homes from the Home Energy Score database to strike a balance between consistency and more accurate energy predictions. We also discuss additional new capabilities, including improvements made to the upgrade recommendations methodology, the inclusion of an energy cost estimate metric based on ResStock analysis for use in home appraisals, and improved data analysis for quality assurance. Finally, we look at the impact Home Energy Score has had over the last decade and its future potential as its uptake in state energy plans, local ordinances, utility programs, and real estate data continues to grow.

building energy modeling↗

NASA Docking System (NDS) Users Guide: International Space Station Program. Type 4

The NASA Docking System (NDS) Users Guide provides an overview of the basic information needed to integrate the NDS onto a Host Vehicle (HV). This Users Guide is intended to provide a vehicle developer with a fundamental understanding of the NDS technical and operations information to support their program and engineering integration planning. The Users Guide identifies the NDS Specification, Interface Definition or Requirement Documents that contain the complete technical details and requirements that a vehicle developer must use to design, develop and verify their systems will interface with NDS. This Guide is an initial reference and must not be used as a design document. In the event of conflict between this Users Guide and other applicable interface definition or requirements documents; the applicable document will take precedence. This Users Guide is organized in three main sections. Chapter 1 provides an overview of the NDS and CDA hardware and the operations concepts for the NDS. Chapter 2 provides information for Host Vehicle Program integration with the NDS Project Office. Chapter 2 describes the NDS Project organization, integration and verification processes, user responsibilities, and specification and interface requirement documents. Chapter 3 provides a summary of basic technical information for the NDS design. Chapter 3 includes NDS hardware component descriptions, physical size and weight characteristics, and summary of the capabilities and constraints for the various NDS sub-systems.

Tabakman, Alexander↗

Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2020

The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in fiscal year (FY) 2013. The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance findings, as well as results of the lifetime extension studies. Five surveillance plan updates have been issued, one in 2014, one in 2016, one in 2017, one in 2018, and one in 2019. This 2020 update documents what was actually done in 2019 and what is planned for 2020. Deviations from the 2019 surveillance plan were necessary because some of the planned surveillance containers were not available for examination. The goal of the surveillance program is to provide data to: evaluate container component performance over time against the initial baseline qualification; validate the current SAVY container design life; provide data for future design life extensions of components as indicated; identify indications of container degradation early and identify similar containers and/or contents that may need remediation; maintain and continuously improve the surveillance information system that documents the complete life cycle of the containers including the initial production baseline, usage history, surveillance, and disposition; identify container issues related to wear and tear that could indicate the need for a maintenance program for in-service containers prior to the end of the design life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commerce Lab - An enabling facility and test bed for commercial flight opportunities

Commerce Lab is conceived as an adjunct to the National Space Transportation System (NSTS) by providing a focal point for commercial missions which could utilize existing NSTS carrier and resource capabilities for on-orbit experimentation in the microgravity sciences. In this context, the Commerce Lab provides an enabling facility and test bed for commercial flight opportunities. Commerce Lab program activities to date have focused on mission planning for private sector involvement in the space program to facilitate the commercial exploitation of the microgravity environment for materials processing research and development. It is expected that Commerce Lab will provide a logical transition between currently planned NSTS missions and future microgravity science and commercial R&D missions centered around the Space Station. The present study identifies candidate Commerce Lab flight experiments and their development status and projects a mission traffic model that can be used in commercial mission planning.

Robertson, Jack↗

Radiation risk and human space exploration

Radiation protection is essential to enable humans to live and work safely in space. Predictions about the nature and magnitude of the risks posed by space radiation are subject to very large uncertainties. Prudent use of worst-case scenarios may impose unacceptable constraints on shielding mass for spacecraft or habitats, tours of duty of crews on Space Station, and on the radius and duration of sorties on planetary surfaces. The NASA Space Radiation Health Program has been devised to develop the knowledge required to accurately predict and to efficiently manage radiation risk. The knowledge will be acquired by means of a peer-reviewed, largely ground-based and investigator-initiated, basic science research program. The NASA Strategic Plan to accomplish these objectives in a manner consistent with the high priority assigned to the protection and health maintenance of crews will be presented. Published by Elsevier Science Ltd on behalf of COSPAR.

NASA Discipline Radiation Health↗

An Overview of the Lunar Water ISRU Measurement Study (LWIMS)

NASA announced plans for the Artemis program, which would send crewed missions to the Moon by 2024 and achieve a sustainable lunar presence by 2028 [1]. To carry out sustained crewed surface operations, In-Situ Resource Utilization (ISRU), which would use lunar resources to produce mission consumables, will be critical. Water-bearing materials have been identified at both lunar poles and are often associated with Permanently Shadowed Regions (PSRs). These constitute a geological resource that may or may not be convertible to reserves with additional exploration. This water could provide both fuel and oxygen for refueling vehicles as well as life support consumables. However, the nature and extent of this resource is not well understood. Detection of water alone is not adequate for ISRU planning. For this reason, NASA chartered the Lunar Water ISRU Measurement Study (LWIMS). The goal of this study was to assess and define the type, amount, and fidelity of the measurements needed to select mining locations for lunar water ISRU and to define resource-related requirements for ISRU hardware development and architectures (mining operations, hardware emplacement, concept of operations).

Julie Kleinhenz↗

An experiment to enable commercial mobile satellite service

A Mobile Satellite Experiment (MSAT-X) is described, based on a planned cooperative U.S./Canadian program. The experiment would establish network architecture, develop system and ground-segment technology, and define the technical characteristics needed to help structure the regulatory/institutional framework needed to enable a first-generation commercial satellite service. A satellite of this type would augment terrestrial systems, both cellular and noncellular, in the thin-route/rural areas of the country where service is either unavailable or inadequate. Applications range from wide-area radio/dispatch (e.g., oil exploration and interstate trucking) to extension of the public mobile telephone service. Market estimates are provided and experiment objectives and requirements are delineated. The requirements are being developed in close coordination with the Department of Communications (DOC) of Canada and with industry and potential-user organizations. The paper closes with a development plan and milestone chart.

Lovell, R. R.↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗

Trajectory Analysis

The Systems Analysis Branch performs trajectory and systems analysis for next-generation launch vehicle and space transportation technologies. Currently the branch is supporting the Project Prometheus with analysis of nuclear electric and nuclear thermal propulsion missions to a variety of destinations. Within Project Prometheus a proposed mission to Jupiter and three of the planet sized icy moons that orbit it is developing. The Jupiter Icy Moons Orbiter (JIMO) as the project is being called will enable detailed scientific investigation of Jupiter's moons Callisto, Ganymede, and Europa. These moons were choose to orbit for intensive study in particular because they are each believed to have water, energy, and organic material. The JIMO mission will utilize nuclear fission power and electric propulsion in order to allow the spacecraft to orbit the moons at close range for long durations of time. My assignment this summer was to assist in developing a trajectory analysis for the spacecraft system the Jupiter Icy Moons Orbiter by rewriting an inefficient Excel file into a more efficient FORTRAN program. This program has been created for use planning the trajectory of the Jupiter Icy Moons Orbiter Mission. The program uses a database of thousands of data points representing flight time, burn time, thrust, mass of the propellant used, final mass of the spacecraft, ratio of finals mass to initial mass, and change in velocity that a spacecraft experiences during each phase in the Jupiter Icy Moons Orbiter Mission. The trajectory program is capable of taking a specific user entered specific impulse (isp), final mass fraction, and thrust (P(sub J)/m0) and through the use of cubic splines to fit specific data curves, the program can locate the exact flight time linked to the user specified values of specific impulse and final over initial mass fraction. Currently, the database used by the program to calculate flight times for a given thrust is only for isps in the range of 2000 to 9000 seconds. Although the program is specific to the Jupiter Icy Moons Orbiter mission, it can be easily modified to fit any mission with a propulsion system expected isp range between 2000 and 9000 seconds. This program performs the same tasks as the old Excel file but in a more timely fashion. Finally, this FORTRAN program will replace the Excel file as the tool used to calculate trajectory properties in missions and will provide valuable data to mission analysts for years to come.

Burke, Laura M.↗

Astronomical facilities for Spacelab

Three significant Spacelab facilities which are being developed, or planned by NASA will use the 1-2 week observational capability for attached payloads on Shuttle to carry out advanced astronomical observations in the ultraviolet visible, and infrared spectral regions during the decade of the 1980s. The three facilities are expected to evolve in capability over several Shuttle flights with a final objective of protracted observational capability from a permanent facility in space with periodic servicing and/or retrieval. The three facilities are the Office of Space Science package (OSS-3/7), the Solar Optical Telescope (SOT), and the Shuttle Infrared Telescope Facility (SIRTF). The scientific and technical objectives of these astronomical facilities include both their current and projected capabilities, their use of the manned Shuttle, and their eventual disposition to a long-term facility. International aspects of the missions, including General Investigator programs, are also being planned.

Reeves, E. M.↗

Space Shuttle wind tunnel testing program

A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.

Whitnah, A. M.↗

Multiscale Interaction of Turbulence, Temperature, and Soot Formation: Measurements for Critical Assessments of Chemical Kinetics and Mechanisms

This program targeted an improved understanding of how turbulence affects soot formation chemistry (directly and indirectly) with a particular focus on detailing the multiscale coupling between flow turbulence, mixing, thermal transport, and soot formation kinetics in gas-phase reacting systems. In this project, simultaneous, quantitative multi-dimensional velocity, soot volume fraction, and gas-phase temperature measurements in turbulent non-premixed sooting flames were developed. These new diagnostics tools can be used to elucidate the relative effects of fluid kinematics, mixing, thermal processes, and turbulence/scalar time/length scales on soot formation chemistry and topology. Simultaneous multi-parameter measurements were acquired within a series of flames with different Reynolds numbers and spatial locations to investigate the inter-dependence of soot, temperature, and turbulence within the soot inception, growth, and oxidation region. Preliminary assessment of the results has been completed at the project end and detailed analysis is planned following the completed program.

02 PETROLEUM↗

A National Program for Analysis of the Climate System

Perhaps the single greatest roadblock to fundamental advances in our understanding of climate variability and climate change is the lack of robust and unbiased long-term global observations of the climate system. Such observations are critical for the identification and diagnosis of climate variations, and provide the constraints necessary for developing and validating climate models. The first generation of reanalysis efforts, by using fixed analysis systems, eliminated the artificial climate signals that occurred in analyses generated at the operational numerical weather prediction centers. These datasets are now widely used by the scientific community in a variety of applications including atmosphere-ocean interactions, seasonal prediction, climate monitoring, the hydrological cycle, and a host of regional and other diagnostic studies. These reanalyses, however, had problems that made them sub-optimal or even unusable for some applications. Perhaps the most serious problem for climate applications was that, while the assimilation system remained fixed, changes in the observing systems did produce spurious changes in the perceived climate. The first generation reanalysis products also exposed problems with physical consistency of the products and the accurate representation of physical processes in the climate system. Examples are bias in the estimates of ocean surface fluxes, and inadequate representation of polar hydrology. In this talk, I will describe some initial plans for a national program on reananlysis. The program is envisioned to be part of an on-going activity to maintain, improve, and reprocess our record of climate observations. I will discuss various issues affecting the quality of reanalyses, with a special focus on those relevant to the ocean.

Schubert, Siegfried↗

X-Ray Imaging and Spectroscopy Mission

The X-Ray Imaging and Spectroscopy Mission (XRISM) is a joint mission between the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) in collaboration with the European Space Agency (ESA). In addition to the three space agencies, universities and research institutes from Japan, North America, and Europe have joined to contribute to developing satellite and onboard instruments, data-processing software, and the scientific observation program. XRISM is the successor to the ASTRO-H (Hitomi) mission, which ended prematurely in 2016. Its primary science goal is to examine astrophysical problems with precise, high-resolution X-ray spectroscopy. XRISM promises to discover new horizons in X-ray astronomy. It carries a 6 × 6 pixelized X-ray microcalorimeter on the focal plane of an X-ray mirror assembly (Resolve) and a co-aligned X-ray CCD camera (Xtend) that covers the same energy band over a large field of view. XRISM utilizes the Hitomi heritage, but all designs were reviewed. The attitude and orbit control system was improved in hardware and software. The spacecraft was launched from the JAXA Tanegashima Space Center on 2023 September 6 (UTC). During the in-orbit commissioning phase, the onboard components were activated. Although the gate valve protecting the Resolve sensor with a thin beryllium X-ray entrance window was not yet opened, scientific observation started in 2024 February with the planned performance verification observation program. The nominal observation program commenced with the following guest observation program beginning in 2024 September.

Astronomy and AstroPhysics↗