Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “current conservation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,702 records · Page 95

Development of Low-Cost, High-Performance, Easy-To-Apply, Non-Flammable, Inorganic Phase Change Material (PCM) Technology (Project Final Report)

This report describes a 45-months long research program focused on the development of novel, easy-to-apply, non-flammable, and high-performance inorganic phase change materials (PCMs) for building and industrial applications. The University of Massachusetts Lowell (UML) formed a world-class team consisting of researchers form InsolCorp (only N. American manufacturer of inorganic PCM systems for building applications), and a group of industrial advisors, to develop a universal/multipurpose, simple-to-manufacture and cost-effective PCM technology. The project team expects that the results of this work will spur in the future the adoption of thermal storage materials – a key building energy saving technology as identified by DOE BTO – for a variety of building envelope applications. The main goal of this project was to demonstrate a suite of low-cost, multipurpose, and durable inorganic PCM formulations with phase transition temperatures encompassing typical building applications (between +5 o C and +55 o C). The first objective was to design, fabricate, and experimentally validate a performance of inexpensive, durable, highly efficient, non-flammable, and easy to manufacture PCMs. To allow a variety of building applications, the project team focused on formulations that exhibit repeatable phase transitions between +5 o C and +55 o C. To follow the DOE BTO cost efficiency target without compromising thermal performance, our work was based on inorganic compounds (mostly salt hydrates) and their blends, which represent a fraction of the cost of most of organic PCMs with about twice as high density as well as significantly higher thermal conductivity and phase change enthalpy. The second objective was to develop easy-to-manufacture and -install packaging/encapsulation designs that are 1) a superior barrier to current state-of-the-art macro-packaging, which significantly reduces the risk of loss of hydration water and PCM leak, and 2) optimal in enhancing the heat exchange rates with the surroundings and within the PCM core to ensure complete charging/discharging of the entire PCM within the product. Finally, the project’s intend was to scale-up the fabrication process to demonstrate installation on system-scale applications, and to validate the performance under field conditions. This work aimed at developing low-cost, high-energy storage, and reliable latent heat storage technology for building applications. This development was realized by formulating and integrating the following two technology components: 1) inorganic salt hydrate based PCMs that have high latent enthalpies and are low-cost and durable, and 2) PCM encapsulation (packaging) technology that maximizes PCM concentration and enhances heat transport characteristics in the product and with the external environment/materials. High thermal storage capacity, low cost and fire resistance are key to the building market entry for PCM technology. Therefore, the project’s focus was on salt-hydrate-based formulations which satisfy all these criteria. Packaging and/or encapsulation of PCM is a key processing step. The project team recognized that a low-cost and simple-to-manufacture salt hydrate-based PCM technology holds the best chance to be successful in the building construction market, a market which is traditionally extremely sensitive to cost and where commodity thermal insulations are the benchmark for envelope-related energy saving measures. That is why, in this project, the main intention was to minimize the production cost and maximize the product energy storage density without sacrificing the PCM performance. It was achieved through: 1. Minimizing the non-PCM components (plastics, additives, packaging/encapsulation materials, etc.) because they are significantly more expensive than salt hydrates, 2. Using highly thermally conductive and lightweight PCM carrier (packaging material) to facilitate more complete phase cycling, and 3. Optimizing the thickness and minimizing air spaces in product design (such as in pouched PCM). For this purpose, our approach was to enable an easy system design, including selection of the PCM operating temperatures, optimizing the necessary heat storage capacity (by stacking together several layers of PCM products), and if needed, a synchronized usage of PCM products of different temperatures. A specially designed, robust, highly thermally conducting and highly impermeable packaging (to retain salt hydrate water during phase transition cycles) was designed and tested to increase the overall system thermal performance and durability. All PCM products developed during this project were tested in both lab scale and in full scale field conditions. It is expected that, after further developments and commercialization, the developed PCM technologies may be also applied in space conditioning, energy storage technologies, and heat transfer applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Energy Efficient Thermoplastic Composite Manufacturing

The objective of the project was to establish an effective and affordable method to lay-up and consolidate/join large thermoplastic composite aerospace structure with cycle times measured in minutes rather than hours. Composite airplane designs have proven efficient and effective however future potential product production rates are challenging what the current systems can efficiently produce due to material lay-down constraints and extended thermal cycle times. The ability to lay-up then rapidly heat, consolidate, and cool large complex composite structures plus very accurately tool them (i.e. matching CTE of composite materials) along with very precise thermal control is a difficult challenge. Current systems such as autoclave processing of thermoset materials require long cycle times due to method of heating and the large associated thermal masses. These extended cycle times inhibit the ability to meet higher rate production scenarios due to the need for multiple sets of equipment and tools. Thermoplastic composite materials were used to facilitate more rapid cycle times via the elimination of a need for a cure dwell at temperature. Also, utilized induction heating along with smart susceptors to enable the quick cycle times needed while providing precise intrinsic thermal control. The intrinsic control of the induction heating process via the smart susceptors along with the use of laser assisted fiber placement were the key innovations areas developed. The ability to rapidly heat and then precisely control the temperature of the consolidation component was paramount to the success of this project. It is this unique processing attribute coupled with the thermoplastic material characteristics along with rapid lay-up methods that are novel and advantageous. While many requirements and influencing factors decide the materials and processes utilized for future airplane construction, the forecast of accelerated production rates and the recent performance successes of composites in airplane construction provide an opportunity for this processing technology to have significant influence. During the course of this project a number of key accomplishments were completed. They are as follows: The needed laser assisted fiber placement capabilities have been developed and validated on a component of meaningful scale and complexity. Subsequently, a thermoplastic preform of the part scale-up part design was laser assisted fiber placed and made availalbe for consolidation. An induction consolidation system was sized, designed, and fabricated resulting in the full capability to consolidate the scale-up component. The tool for induction consolidating of the scale-up component was designed and fabricated. An aluminum pressure bladder was welded and formed for use as the pressurization membrane to perform the needed application of pressure on the part at temperature to achieve consolidation. The induction consolidation system consisting of the restraint, induction power supply, induction tool with integrated induction coils and smart susceptor liners, along with the aluminum bladder were successfully used to consolidate a large thermoplastic skin. The capability of accomplishing rapid heat-up rates and cool down rates for consolidation of large thermoplastic skins with precise thermal control and even pressure application at the consolidation temperature was validated. The general conclusion is that the use of induction consolidation with smart susceptors is an effective method to rapidly and efficiently consolidate large thermoplastic composite components and enable affordable high rate manufacturing of composites. More specific conclusions generated by this project are as follows: A restraint type induction consolidation system provides an affordable option over the standard press when using the induction consolidation processing method. Aluminum bladders can be formed to the complex shapes needed and supply uniform pressure for consolidation and co-consolidation of thermoplastic composite materials. Straightforward modifications can be made to existing fiber placement robotic systems to enable their use for thermoplastic lay-up applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Data-Driven Understanding of Low-to-Moderate Income Customers’ Adoption and Financial Qualification in Community Solar (Final Technical Report)

When Solstice began working in the community solar industry, it quickly became clear that there was a wide disparity along race and class lines in terms of what kind of household traditional solar offerings benefited. Solstice is an organization that aligns itself to the principles of a Just Transition, or the concept that a transition to a green economy should benefit and prioritize historically marginalized groups of people. Given that low-income communities are disproportionately burdened by our current polluting fossil fuel economy, Solstice set out to investigate the root causes of the exclusion of low to moderate income (LMI) households in the community solar market. As we worked more and more with financiers, developers, and LMI households, we recognized that significant barriers to entry in a developer-owned project were credit threshold requirements. A FICO score of 750 and higher discriminates against LMI households that are not financially stable enough to take on multiple lines of credit (or who may not have been deemed credit worthy enough to access a line of credit) yet who may have been reliable utility customers. As Solstice began looking further into preliminary data and speaking to community-based organizations (CBOs) that serve LMI households, we found our hypothesis to be worth investigating; there was indeed a subset of LMI households with poor FICO scores (or no FICO score at all) that had perfect bill payment history. Though initially Solstice was intent on gathering a body of data to prove or disprove this hypothesis, we were also concerned that all this proof of a financially stable and reliable customer was not being incorporated into FICO, and wondered if such a score would be possible. After preliminary research into the existence of alternative scores, Solstice realized that many mission-driven lending institutions rely on alternative metrics that are formulated for their specific industry. However, we also realized that community solar did not have an alternative credit underwriting mechanism, though there was great need from solar financiers for one. We anticipated that the creation of an EnergyScore would contribute to financiers’ need to qualify more people, as these entities are desperately looking for ways to lower the cost of customer acquisition. FICO turns away nearly 50% of potential customers (according to our own acquisition experience), and much of the community solar industry is realizing that FICO is not the perfect qualifying mechanism. Additionally, with a grounding in energy justice, just transitions, and climate justice, Solstice recognizes the need for a solution that addresses a more urgent need for LMI households to access renewable energy savings and relieve energy burdens. With funding from the Department of Energy, we gathered the data necessary to build the EnergyScore, reached out to mission-driven developers willing to test the metric, and secured several demonstration projects to pilot the EnergyScore. After acquiring customers for these demo projects using the EnergyScore, we will be continuously collecting customer payment behavior data. Though it goes beyond the scope of this project, we plan to disseminate this de-identified data with the wider community solar industry, which includes not only financiers and developers, but other mission-driven nonprofits, solar cooperatives, community-based organizations, environmental justice activists, and academics. While we intend to disprove the notion that LMI households cannot be included in projects without acutely increasing the risk to project finances, we also hope the data can be used to negotiate better pricing of systems and terms of ownership for community groups seeking to build inclusive projects.

14 SOLAR ENERGY↗

Transportation in net-zero emissions futures: Insights from the EMF-37 model intercomparison study

Transportation is currently the largest source of U.S. anthropogenic CO 2 emissions, at about a third of the total. Achieving net-zero emissions by mid-century will require substantial reductions in transportation emissions across passenger and freight travel. Here we leverage a model intercomparison study to explore the role of transportation in scenarios achieving net-zero economy-wide CO 2 emissions by 2050. We find the transport sector is poised to play the most significant role in reducing demand-side emissions, mostly driven by technology substitution, as modeling results suggest a limited role for mode shifting and for reduced use of personal car travel in the U.S. Among various technology solutions, models show agreement that passenger on-road vehicles will largely transition to electric vehicles (EVs), while solutions to decarbonize heavier travel modes are more diverse and include greater use of liquid biofuels and hydrogen. Research should continue to investigate the evolution of on-road electrification, the role of biofuels and hydrogen across heavier travel modes, and the role of mode shifting and travel behavior change to support personal transportation decarbonization at national and regional scales to temper the rapid growth in clean fuel and electricity demand.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Novel Manufacturing Process of Lightweight Automotive Seats (Integration of Additive Manufacturing and Reinforced Polymer Composite)

Lightweight automotive seats offer multiple benefits to original equipment manufacturers in terms of cost savings from various aspects, including less material usage, more integrated processes, and compliance with Corporate Average Fuel Economy Standards. Original equipment manufacturers have been focusing on innovative ways to produce light weight automotive seats. The commercially available automotive seats are currently made of multiple metal components combined through welding and fasteners. The use of additive manufacturing and composite structures is particularly useful for light weighting the automotive components. Additive manufacturing (AM) offers multiple advantages over traditional manufacturing processes such as freedom of design thereby enabling complex structural geometries, mass customization and waste minimization, and control over the fiber alignment through deposition in a predetermined pattern. Combining metal inserts with polymer composites through a novel manufacturing process allows design of lightweight and high-performance materials for automotive components. However, fabricating these metal polymer composite structures through traditional manufacturing processes limits their mechanical properties due to limited design freedom, lack of control over fiber orientation in composite parts, and poor interfacial bonding between the constituent materials. It is essential to develop a novel manufacturing process to enable high throughput production of lightweight automotive seats using metal and polymer composites. As such it is important to design the automotive seat suitable for manufacturing via this process and perform mechanical characterization on various subcomponents of the seat to ensure that the design and performance requirements provided by the auto manufacturer are met. The aim of this project is to develop a novel manufacturing technique to produce lightweight automotive seat by combining AM with conventional manufacturing processes. The car seat back panel will be designed via topology optimization and numerical simulations to minimize the overall weight while ensuring it meets all the performance requirements. The optimization of the seat back structure will be based on computational stress analysis to maximize the stiffness and minimize the weight. Materials currently used by Ford Motor Company will be adopted for a few subcomponents while the in-house composite materials will be used for the rest of the seat back. The composite and metallic materials will be tested to determine their mechanical properties as these are necessary for simulations. A novel manufacturing process will be developed to integrate AM metal inserts with discontinuous reinforced composite through large scale additive manufacturing and compression overmolding processes. The developed manufacturing technique will be used to fabricated various subcomponents suitable for the seat back design and mechanically tested to determine their properties. The manufacturing of the lightweight seat back design through this process involves integrated AM metal inserts with the composite structure for recliner connection. The manufacturing of the entire seat back which is lightweight through the novel manufacturing process will be discussed. The performance of the designed seat back will be investigated through numerical simulations and shown to meet all the requirements provided by the auto manufacturer. The final goal of developing a novel manufacturing process for lightweight automotive seats is met through design optimization of seat back, manufacturing of subcomponents, mechanical characterization, and validation through numerical simulations. The routes to achieve the final goal of the project and the depth in which they were investigated changed throughout the project due to personnel changes and the COVID-19 pandemic. The project resulted in the development of a novel manufacturing process to integrate metal inserts with tailored polymer composite preforms through overmolding. Leveraging this proven manufacturing process, a lightweight seat back was designed through topology optimization and numerical simulations. The designed seat back uses AM metal inserts and compression overmolding of tailored polymer composite preforms obtained via large scale additive manufacturing. The metal polymer composite structures fabricated through this process exhibited enhancement in stiffness and improved ductility upon testing. Overall, the project provided an alternative design and manufacturing technique for automotive seat back that enables weight saving while meeting the safety and performance requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗