Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Execution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,693 records · Page 94

AMPP Newsletter (Sep 2020)

I am excited to introduce the third 2020 issue of Actinide Materials Processing and Power Division’s quarterly newsletter, with a focus on “excellence in mission operations.” Excellence in mission operations requires the execution of sustained operations that are reliable and responsive to mission needs across all work being performed in AMPP. For all of us, adherence to Conduct of Operations principles and strong work planning and execution is essential to achieving a safe and productive environment that enables overall excellence. Since the beginning of the COVID-19 pandemic response, you have all shown how AMPP has a division exemplifies this focus area. Highlights of our outstanding operational work under the threat of COVID-19 have been featured in our weekly newsletters.

36 MATERIALS SCIENCE↗

Coupling of Laminar-Turbulent Transition with RANS Computational Fluid Dynamics

This project combines several new concepts to create a boundary layer transition prediction capability that is suitable for analyzing modern hypersonic flight vehicles. The first new concept is the use of ''optimization'' methods to detect the hydrodynamic instabilities that cause boundary layer transition; the use of this method removes the need for many limiting assumptions of other methods and enables quantification of the interactions between boundary layer instabilities and the flow field imperfections that generate them. The second new concept is the execution of transition analysis within a conventional hypersonics CFD code, using the same mesh and numerical schemes for the transition analysis and the laminar flow simulation. This feature enables rapid execution of transition analysis with less user oversight required and no interpolation steps needed.

42 ENGINEERING↗

SST-GPU: A Scalable SST GPU Component for Performance Modeling and Profiling

Programmable accelerators have become commonplace in modern computing systems. Advances in programming models and the availability of unprecedented amounts of data have created a space for massively parallel accelerators capable of maintaining context for thousands of concurrent threads resident on-chip. These threads are grouped and interleaved on a cycle-by-cycle basis among several massively parallel computing cores. One path for the design of future supercomputers relies on an ability to model the performance of these massively parallel cores at scale. The SST framework has been proven to scale up to run simulations containing tens of thousands of nodes. A previous report described the initial integration of the open-source, execution-driven GPU simulator, GPGPU-Sim, into the SST framework. This report discusses the results of the integration and how to use the new GPU component in SST. It also provides examples of what it can be used to analyze and a correlation study showing how closely the execution matches that of a Nvidia V100 GPU when running kernels and mini-apps.

97 MATHEMATICS AND COMPUTING↗

Closeout of Department of Energy Grant – DE-FG02-91CH10493

A Federal Facility Interagency Agreement (lAG), dated February 28,1992, was executed by the State of New York, U.S. Environmental Protection Agency (EPA), and the U.S. Department of Energy (DOE) to address contamination of operations at the Brookhaven National Laboratory (BNL) National Priorities List (NPL) site (site). Section XXXII of the IAG permits New York State to recover expenses for providing administrative and technical services pertaining to the site. The initial mechanism for recovery of State expenses was a DOE grant, identified as DE-FG02-91CH10493, which was established on September 30, 1991. Due to administrative requirements at DOE, the grant was no longer extended and was terminated on May 31, 2020. A Memorandum of Agreement (MOA) was executed on June 1, 2020, to facilitate reimbursement of State expenses moving forward. The grant contained closeout requirements, which included the submission of a report summarizing activities performed by the State of New York. The following sections present the site history and activities performed by New York State as well as the findings and conclusions.

54 ENVIRONMENTAL SCIENCES↗

Proceedings of the 2021 Airborne Wind Energy Workshop

On March 2-3, 2021, the National Renewable Energy Laboratory (NREL) conducted a virtual workshop to evaluate the status, potential development, and technical viability of AWE systems as a source of energy in the United States. Stakeholder input provided at the workshop will contribute to the report to Congress. This report summarizes key workshop findings, current technology research and development activities in the United States, and opportunities and potential modes of collaboration and coordination for future technology research and development activities. The workshop focused on U.S. stakeholders in AWE, with approximately 100 experts and industry stakeholders from AWE technology developers, operators, engineering firms, consultants, government, national laboratories, and university researchers. The workshop began with an explanation from DOE's Wind Energy Technologies Office (WETO) Technology Manager, Ben Hallissy, of the context and purpose of the workshop, including a request from Congress that the U.S. Department of Energy (DOE) deliver a "report on the potential for, and technical viability of, airborne wind energy systems to provide a significant source of energy in the United States, including a summary of research, development, demonstration, and commercialization needs, including an estimate of Federal funding requirements, to further examine and validate the technical and economic viability of airborne wind energy concepts over the 10-year period." The workshop began with brief introductions from attendees who explained their interest in AWE. Nicolas El Hayek of Planair summarized the proceedings from the AWE workshop held in September 2020 by the International Energy Agency (IEA) Wind Task 11. This was followed by a presentation by Roland Schmehl of TU-Delft summarizing European AWE R&D efforts. Chris Vermillion of North Carolina State University and Jason Jonkman of NREL presented an overview of U.S. R&D efforts. Then five panelists discussed AWE markets, sizes of AWE systems, challenges, and opportunities. Panelists included: Cristina Archer, professor at the College of Earth, Ocean, and Environment and associate director at the Center for Research in Wind (CReW) at the University of Delaware; Stephan Brabeck, chief technology officer at SkySails; Thierry Delahave, innovation and technology development lead at Saipem; Rob Creighton, founder and chief executive officer at WindLift; and David Schaefer, founder and chief executive officer at eWind Solutions. The second day of the workshop began with a brief overview of five key topics that are crucial to enabling AWE in the United States. These topics range from estimates of the U.S. wind resource, technical generation potential, economic analysis, environmental challenges, status of current technology and R&D activities, and needed activities to enable commercialization of AWE. This set the stage for a robust discussion in breakout groups where individuals could offer their opinions on the potential opportunities for AWE in the United States. The following topics were discussed in the breakout groups: resource potential and energy output, technical potential, social and environmental impacts, and permitting, techno-economic analysis and markets, technology assessment and upscaling and demonstration and commercialization needs. The second day concluded with reports by the NREL research team, communicating the key themes and outcomes from each of the breakout group discussions.

17 WIND ENERGY↗

Task Parallelism to Optimize Performance of Environmental Modeling Software

Climate modeling is an integral part of environmental research, from studying rare phenomena to predicting future climate trends. The need for more accurate models is only growing, but as climate modeling capabilities advance, existing workflows require optimization to recoup performance. A solution comes in the form of task parallelism, a novel programming capability that provides an opportunity for optimization at execution time by allowing tasks to be executed in parallel, reducing runtime significantly. Using Parsl, an intuitive and scalable parallel scripting library for Python, we implement task parallelism within support software to aid in the continuous advancement of climate modeling technology.

54 ENVIRONMENTAL SCIENCES↗

Physical Sciences Vistas Issue 3 2021

In this issue, highlights of our contributions to mission operations include descriptions of the following. • How exact and scrupulous planning in concert with sophisticated science enabled a first-ever direct measurement of a radionuclide with a half-life as short as six days. The work, which included operations at the Los Alamos Neutron Science Centers (LANSCE) Weapons Neutron Research Facility and the Isotope Production Facility’s hot cell facility, is a boon for both astrophysics and weapons science. • An introduction to Christie Davis and her role in ensuring the Lab’s execution of simultaneous excellence. • A look at progress by AOT’s Target and Experimental Support Team in reclaiming long-dormant space in a radiological controlled area for new work improving target systems for the Lujan Center. • A story showcasing a cross-organizational effort to minimize the directorate’s legacy and environmental footprint. Staff from across the Lab joined together to ensure the safe and efficient disposal of Rocky Flats legacy waste stored in a transportainer at the Target Fabrication Facility. • How the Lab’s Utilities and Infrastructure experts collaborated with stakeholders in our directorate to safety execute preventive maintenance on the LANSCE mesa’s large electrical substation. The Safe Conduct of Research principles provided a common framework for the planning and process. • A description of the resources called upon and the procedures undertaken by MPA to inventory the division’s time-sensitive chemicals, including the careful and conscientious response of an alert team member when something seemed amiss.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating PGAS and MPI-based Graph Analysis

This project demonstrates that Chapel programs can interface with MPI-based libraries written in C++ without storing multiple copies of shared data. Chapel is a language for productive parallel computing using global address spaces (PGAS). We identified two approaches to interface Chapel code with the MPI-based Grafiki and Trilinos libraries. The first uses a single Chapel executable to call a C function that interacts with the C++ libraries. The second uses the mmap function to allow separate executables to read and write to the same block of memory on a node. We also encapsulated the second approach in Docker/Singularity containers to maximize ease of use. Comparisons of the two approaches using shared and distributed memory installations of Chapel show that both approaches provide similar scalability and performance.

97 MATHEMATICS AND COMPUTING↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Low-Voltage Switchgear Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena for low-voltage metal enclosed switchgear containing aluminum conductors. This report covers full-scale laboratory experiments using representative nuclear power plant (NPP) three-phase electrical equipment. Electrical, thermal, and pressure data were recorded for each experiment and documented in this report. This report covers experiments performed on two low-voltage switchgear units with each unit consisting of two vertical sections. The data collected supports characterization of the low-voltage HEAF hazard and these results will be used to support potential improvements in fire probabilistic risk assessment (PRA) methods. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 26 and Augsut 29, 2019 on nearidentical Westinghouse Type DS low-voltage metal-enclosed indoor switchgear. The threephase arcing fault was initiated on the aluminum main bus or in select cases on the copper bus stabs near the breaker. These experiments used either nominal 480 volts AC or 600 volts AC. Durations of the experiments ranged from approximately 0.4 s to 8.3 s with fault currents ranging from approximately 9.2 kA to 19.3 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. Environmental measurements of breakdown, conductivity and electromagnetics were also taken. The experiments were documented with normal and high-speed videography, infrared imaging and photography. The results, while limited, indicated the difficulty in maintaining and sustaining low-voltage arcs on aluminum components of sufficient duration and at a single point as observed operating experience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

IHE DDT Qualification Tests (FY2020-FY2021)

A DDT tube test was designed to meet all requirements established in the new DOE IHE qualification standard. Ten tests were successfully executed with PBX 9502 as a demonstration of the design, assembly, heating system, and methods, and to establish a baseline set of test results with an existing IHE. The explosive response in all tests was low violence (as anticipated). This report contains detailed design drawings, assembly instructions and procedures for future execution of the qualification test series, and makes recommendations for minor improvements.

42 ENGINEERING↗

Report on High Energy Arcing Fault Experiments: Experimental Results from Open Box Enclosures

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena. The experiments focus on providing data to better characterize the arc to improve the prediction of arc energy emitted during a HEAF event. An open box experiment allow for direct observation of the arc, which allows diagnostic instrumentation to record the phenomenological data needed for better characterization of the arc energy source term. The data collected supports characterization of the arc and arc jet, enclosure breach, material loss, and electrical properties. These results will be used to better characterizing the hazard for improvements in fire probabilistic risk assessment (PRA) realism. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the NRC, the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA Labs. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setup and execution. The HEAF experiments were performed between August 22, 2020 and September 18, 2020 on near-identical 51 cm (20 in) cube metal boxes suspended from a Unistrut support structure. The three-phase arcing fault was initiated at the ends of the conductors oriented vertically and located at the center of the box. Either aluminum or copper conductors were used for the conductors. The low-voltage experiments used 1 000 volts AC, while the medium-voltage experiments used 6 900 volts AC consistent with other recently completed experiments. Durations of the experiment ranged from 1 s to 5 s with fault currents ranging from 1 kA to 30 kA. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers, radiometers, and slug calorimeters at various locations around the electrical enclosures. The experiments were documented with normal and high-speed videography, infrared imaging and photography.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

LANL Weapons Physics Directorate: Mission Scope and Opportunities [Slides]

The Weapons Physics Directorate stewards a number of critical capabilities to meet the LANL mission. To execute our mission, ALDX develops and applies cutting-edge theory, computational models and multi-physics simulation codes, and designs, executes, and analyzes complex experiments. Our mission is to sustain the current stockpile, provide future stockpile options, and help shape a globalized nuclear world.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

High Explosive Testing Capabilities at Nevada National Security Site (NNSS) [Slides]

LANL is a non-profit Federally Funded Research & Development Center (FFRDC). LANL’s Integrated Weapons Experiments (J) Division addresses national security challenges by executing largescale, integrated, focused experiments, and tests of engineered devices and systems. J-NV plans, fields, and executes dynamic high explosive experiments at NNSS. This includes sub-critical experiments involving special nuclear material, as well as small- and largescale non-nuclear experiments. J-NV generates, analyzes, and disseminates unique, high-quality data.

42 ENGINEERING↗

Oppenheimer Science and Energy Leadership Program (OSELP) Software and Computing Strategy for the Future of Weapons Physics Applications [Slides]

Mission drivers at the national level are evolving to accommodate a broadening landscape. The U.S. faces a rapidly evolving, threat-based environment with an associated expansion of national-level priorities. Priorities continue to include all aspects of sustaining the existing, aging stockpile. Now, however, we must also include consideration of options for a future deterrent, including efficacy of the deterrent against new threats (threat assessment and response), capability needs associated with new materials and modern manufacturing and production processes, and efficiency requirements for a modern workflow for weapons design. Executing this complex strategy will come with challenges. We must execute our current mission, while we prepare for future missions and an increasingly uncertain future.

42 ENGINEERING↗

Report on High Energy Arcing Fault Experiments

This report documents an experimental program designed to investigate High Energy Arcing Fault (HEAF) phenomena for medium voltage electrical switchgear containing aluminum conductors. This report covers full-scale laboratory experiments using representative nuclear power plant (NPP) three-phase electrical equipment. Electrical, thermal, and pressure data were recorded for each experiment and documented in this report. This report covers four of the fourteen planned medium voltage electrical enclosure experiments. Subsequent reports will document the additional experiments performed in the future. The experiments were performed at KEMA Labs located in Chalfont, Pennsylvania. The experimental design, setup, and execution were completed by staff from the United States Nuclear Regulatory Commission (NRC), the National Institute of Standards and Technology (NIST), Sandia National Laboratories (SNL) and KEMA. In addition, representatives from the Electric Power Research Institute (EPRI) observed some of the experimental setups and execution. The HEAF experiments were performed on four near-identical units of General Electric metal-clad medium voltage switchgear. The three-phase arcing fault was initiated on the primary cable connection bus. All four experiments used the same system voltage (6.9 kV) but varied the current and duration. Real-time electrical operating conditions, including voltage, current and frequency, were measured during the experiments. Heat fluxes and incident energies were measured with plate thermometers and slug calorimeters at various locations around the electrical enclosures. Internal enclosure pressures were measured during the experiments. The experiments were documented with normal and high-speed videography, infrared imaging, and photography. Insights from the experimental series included timing information related to enclosure breach, event progression, mass loss measurements for electrodes and steel enclosures, peak pressure rise, particle analysis, along with visual and thermal imaging data to better understand and characterize the hazard. These results will be used in subsequent efforts to advance the state of knowledge related to HEAF.

42 ENGINEERING↗

Panorama 360 (Final Report)

This final technical report from the lead institution, USC grant #DE-SC0012636, serves as the final technical report for collaborative institution UNC-CH grant #DE-SC0012390. The goal was to develop a repository and associated capabilities for data collection, ingestion, and analysis for a broad class of DOE applications that span experimental and simulation science workflows. In particular, this work focuses on workflows that include experimental data generation at DOE facilities. The main activities of Panorama 360 include the development of: (1) A distributed repository that stores different types of workflow execution data (e.g., point and time series performance traces at fine- and coarse-grained levels); (2) A set of open-source data capture, curation, and publishing tools fully integrated with a state-of-the-art workflow management system that automates data ingestion to the repository and enables users to discover, query, and process data from the repository; (3) A set of analysis algorithms and machine learning based tools to perform analysis and characterization of the gathered data, which can be used to detect anomalous performance or system faults; and (4) Best practices and recommendations for workflow evaluation, analysis, execution, and architectures.

97 MATHEMATICS AND COMPUTING↗

Considerations for Department of Defense Implementation of Zero-Emission Vehicles and Charging Infrastructure

This guide provides a roadmap to comply with Executive Order (EO) 14057 requirements and transition to a zero-emission vehicle (ZEV) fleet efficiently and quickly. EO 14057 on Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability requires the Department of Defense (DoD) to transition its non-tactical vehicles to a 100% ZEV fleet, including 100% of light-duty acquisitions by 2027 and 100% of medium- and heavy-duty acquisitions by 2035. The report covers planning for ZEVs and electric vehicle supply equipment (EVSE), roles and responsibilities of key stakeholders in designing EVSE, and execution issues including acquisition, installation, and ongoing fleet management.

33 ADVANCED PROPULSION SYSTEMS↗