A WM Facility for the Processing of Radioactive Materials Arising from the Decommissioning Activities of the Belgian Nuclear Power Plant of Doel - 16042
Doel Nuclear Power Plant is located in the northern part of Belgium in the harbour of Antwerp on the Scheldt River. On this 80-hectare site Electrabel, the Belgian utility, operates four PWRs with a total generation capacity of 2911 MWe. Those nuclear power units were commissioned in 1975 (Doel 1 and 2 - twin units), in 1982 (Doel 3) and in 1985 (Doel 4). In light of the Belgian governments decision to definitively shutdown the oldest units of the site (Doel 1 and 2 - 433 MWe each) in 2015 at the end of their 40-year design lifetime, Electrabel launched a D and D program in partnership with Tractebel Engineering in July 2012. During the D and D preparation phase prior to the final shutdown, studies performed by Tractebel Engineering showed the added benefit of a purpose-built Waste Management Facility (WMF) specifically equipped to process contaminated and activated components generated by the in-situ dismantling activities. The WMF is a key infrastructure contributing to a large extent to the Waste Minimization Policy within the global D and D program. The present paper aims at presenting its strategic, logistic, infra-structural, and design principles. At the end of 2014, the Belgian government and Electrabel entered into discussions to envisage a 10-year lifetime extension of Doel 1 and 2 units. Therefore, Electrabel decided to put the D and D program on hold. Nevertheless, the preparatory studies for the future D and D activities on Doel site are set on solid assumptions and pave the way towards a safe, cost-effective and waste minimizing decommissioning process. (authors)