DOE OSTI · 1567014

Cryogenic Carbon Capture Development (Final Report)

Abstract

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant. The specific areas of work in this project are: Budget Period 1: 1) Selection of the most energy-efficient drying system for ambient-pressure flue gas. Sustainable Energy Solutions, LLC (SES) has successfully demonstrated a dryer that removes bulk water using a low-temperature brine to remove about 99% of the water followed by a mol sieve 3A desiccant dryer to remove the remaining 1% water; 2) Selection and demonstration of efficient solution to fouling due to dissolved CO 2 . SES has tested several commercial heat exchangers that purport to be able to handle fouling issues similar to those experienced in the contact liquid chiller. Replicated tests using the CCC ECL™ skid and dimpled brazed plate heat exchangers demonstrate that quick throttling of refrigerant combined with a burst of clean gas mitigate the fouling caused by CO 2 solubility in contact liquid with only minor increases in parasitic load. SES models indicate that parasitic load would increase by approximately 0.0125 GJ/tonne, an order of magnitude less than what was determined to be the maximum allowable additional parasitic load caused by this system; 3) Selection and demonstration of efficient and scalable solid–liquid separation system. The screw press technology met or exceeded the 70% solids loading benchmark during several test runs exceeding 24 hours on the CCC ECL™ skid. The average solids loading during the entire 50-hour run was 67%. The energy demand for this system is less than 0.1 GJ e /tonne of CO 2 processed; 4) Optimize design and demonstration of patented desublimating heat exchangers. We designed and built a hybrid spray tower that was tested over many hundreds of hours and a 50-hour continuous test run was completed capturing over 0.5 tonne CO 2 /day at >90% capture; (5) Plan for safe dilution of oxygen-depleted, cleaned flue-gas stream. The AERSCREEN simulator developed by the EPA modeled the dispersion of oxygen-depleted flue gas from the CCC process at a commercial plant. The results indicate that this plan effectively mitigates the flue gas hazards; (6) Simulation of and experimental work related to multi-pollutant capture. SES programmed an upgrade to its solid/vapor/liquid equilibrium (SVLE) algorithm. This enables simultaneous modeling of multiple pollutants (i.e., CO 2 , SO x , NO x , Hg, HCl). Budget Period 2; (7) Modify the CCC ECL™ skid for field testing and complete shakedown testing. The plans for modifying the CCC ECL™ skid were finalized and put into place. Shakedown testing of the updated CCC ECL™ skid occurred at SES using closed-loop mode (i.e., using a synthetic flue gas consisting of only N 2 and CO 2 ) and at the Hunter Power Plant using flue gas from the coal-fired boiler. Shakedown testing took longer than expected due to delays in receiving equipment and unexpected equipment performance in the field; (8) Operate the CCC ECL™ skid in the field. Longer testing of the CCC ECL™ skid occurred at the Hunter Power Plant. Multiple tests exceeding 35 hours were completed, with a total of over 600 hours of CO 2 capture completed using flue gas at the Hunter Power Plant with an average CO 2 capture rate of over 91% during those hours. Extensive notes and documentation were acquired informing improved methods for controls, startup, operation, and shut down; (9) Determine figures of merit and quantify process improvement. SES defined figures of merit for unit operation performance and overall CCC ECL™ process performance. All figures of merit were achieved or surpassed, except for 500 continuous hours of demonstration at the Hunter Power Plant; (10) Complete an Environmental Health and Safety Risk assessment by a third party. Tri-State completed an Environmental Health and Safety Risk assessment; (11) Update techno-economic analysis with third-party validation. The techno-economic analysis has been completed. It confirms the potential large reduction in energy and cost of the CCC process compared with leading alternatives and that the estimates and estimation techniques are reliable.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Baxter, Larry L., Baxter, Andrew, Stitt, Kyler, Burt, Stephanie, Bever, Ethan, Chamberlain, Skyler, Frankman, Dave, Hoeger, Christopher, Mansfield, Eric, Parkinson, Dallin, Sayre, Aaron. 2019-09-28. Cryogenic Carbon Capture Development (Final Report). https://doi.org/10.2172/1567014

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Designing a Robust MEA-Based Post-Combustion Carbon Capture Process with Capture Rate Guarantees

This work presents an application of the nonlinear two-stage robust optimization solver PyROS to the model-based design and operation of a monoethanolamine scrubbing process for CO<sub>2</sub> capture under epistemic uncertainty. Through this application, risk-averse process designs are successfully obtained for CO<sub>2</sub> capture targets ranging from 90% to over 99%. In particular, the risk-averse solutions for CO<sub>2</sub> capture targets of up to 98% are shown to be only marginally more expensive than their nominally optimal counterparts. Thus, the results demonstrate the utility of recently developed nonlinear robust optimization approaches for the solution of large-scale chemical process models under uncertainty.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal Design and Techno-Economic Analysis of 3D-Printed, Intensified Packings for Absorbers and Strippers in Solvent-Based CO 2 Capture

A potential technology for the CO 2 absorption process is utilizing intensified structured packing with embedded cooling/heating channels for continuous heat exchange, which can overcome limitations of discrete methods, such as discrete intercooling and centralized reboilers, to aid in reducing energy consumption and decreasing costs. This work investigates the modeling of intensified packing (IP) for the stripper tower, extending on previous work for the absorber, which distributes heat internally within the column, improving the thermodynamics for the solvent regeneration process. The model includes submodels for steam turbine extraction to produce steam at various qualities as well as a surrogate model for calculating steam enthalpy. A cost model for a plant-scale absorption capture process was developed, allowing for the design of the plant to be optimized, subject to minimizing capture cost using two different power plant flue gas sources. In this optimization, the placement of IP in both towers is optimized to balance the trade-off between enhanced heat transfer and reduced mass transfer volume. For natural gas combined cycle flue gas, the standard process configuration had a minimum cost of $\$$65.40/tonne CO 2 , and considering IP, the minimum capture cost is reduced to $\$$62.73/tonne, with utilization in the stripper column, which reduces yearly costs by up to $\$$2.67 MM/yr. Cooling the absorber through IP, or intercoolers, was only found to be beneficial at higher capture rates, with IP in both towers having a cost of capture of $\$$68.08/tonne at 99.9% capture, a reduction of $\$$12.64/tonne when using only intercoolers at the same capture rate. When capturing from pulverized-coal power plants, the minimum cost of capture when using IP in both towers is $\$$44.18/tonne (at 97% capture), while the standard configuration with and without intercoolers was $\$$45.69 and $\$$47.22 per tonne, respectively. This results in a reduction in yearly costs of $\$$16.98 MM/yr from the base-case configuration. At this higher CO 2 concentration, cooling in the absorber from the IP becomes extremely beneficial, reducing energy consumption by up to 6%.

20 FOSSIL-FUELED POWER PLANTS↗

Transformational Molecular Layer Deposition Tailor-Made Size-Sieving Sorbents for Post-Combustion CO 2 Capture

This report summarizes the carbon capture research and development conducted by The State University of New York at Buffalo (UB), University of South Carolina (USC), GTI Energy (GTI), and Rensselaer Polytechnic Institute (RPI) for U.S. Department of Energy (DOE) project DE-FE0031730 titled “Transformational Molecular Layer Deposition Tailor-made Size-Sieving Sorbents for Post-Combustion CO 2 capture.” The objective of this project was to develop a transformational molecular layer deposition (MLD) tailor-made size-sieving sorbent integrated with a pressure swing adsorption (PSA) cycle schedule that can be installed in new or retrofitted into existing pulverized coal (PC) power plants for CO 2 capture with a cost of electricity at least 30% lower than a supercritical PC power with CO 2 capture, or approximately $\$$30 per tonne of CO 2 captured, and with it being ready for demonstration by 2030.

20 FOSSIL-FUELED POWER PLANTS↗