Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,657 records · Page 92

Methodology to Define Delivery Accuracy Under Current Day ATC Operations

In order to enable arrival management concepts and solutions in a NextGen environment, ground- based sequencing and scheduling functions have been developed to support metering operations in the National Airspace System. These sequencing and scheduling algorithms as well as tools are designed to aid air traffic controllers in developing an overall arrival strategy. The ground systems being developed will support the management of aircraft to their Scheduled Times of Arrival (STAs) at flow-constrained meter points. This paper presents a methodology for determining the undelayed delivery accuracy for current day air traffic control operations. This new method analyzes the undelayed delivery accuracy at meter points in order to understand changes of desired flow rates as well as enabling definition of metrics that will allow near-future ground automation tools to successfully achieve desired separation at the meter points. This enables aircraft to meet their STAs while performing high precision arrivals. The research presents a possible implementation that would allow delivery performance of current tools to be estimated and delivery accuracy requirements for future tools to be defined, which allows analysis of Estimated Time of Arrival (ETA) accuracy for Time-Based Flow Management (TBFM) and the FAA's Traffic Management Advisor (TMA). TMA is a deployed system that generates scheduled time-of-arrival constraints for en- route air traffic controllers in the US. This new method of automated analysis provides a repeatable evaluation of the delay metrics for current day traffic, new releases of TMA, implementation of different tools, and across different airspace environments. This method utilizes a wide set of data from the Operational TMA-TBFM Repository (OTTR) system, which processes raw data collected by the FAA from operational TMA systems at all ARTCCs in the nation. The OTTR system generates daily reports concerning ATC status, intent and actions. Due to its availability, ease of use, and vast collection of data across several airspaces it was determined that the OTTR data set would be the best method to utilize moving forward with this analysis. The particular variables needed for further analysis were determined along with the necessary OTTR reports, by working closely with the repository team additional analysis reports were developed that provided key ETA and STA information at the freeze horizon. One major benefit of the OTTR data is that using the correct reports the data across several airports could be analyzed over large periods of time. The OTTR data processes the TBFM data daily and is stored in various formats across several airspaces. This allowed us to develop our own parsing methods and raw data processing that would not rely on other computationally expensive tools that perform more in depth analysis of similar sets of data. The majority of this work consisted of the development of the ability to filter flights to create a subset of flights that could be considered undelayed, which is defined as a flight at the freeze horizon with an ETA and STA difference that was minimal or close to zero. This was a broad method that allowed the consideration of a large data set which consisted of all the traffic across a two month period in 2013, the hottest and coldest months, arriving into four airports: George Bush Intercontinental, Denver International, Los Angeles International, and Phoenix Sky Harbor.

delivery accuracy↗

NASA Operational Simulator for Small Satellites: Tools for Software Based Validation and Verification of Small Satellites

The NASA Operational Simulator for Small Satellites (NOS3) is a suite of tools to aid in areas such as software development, integration test (IT), mission operations training, verification and validation (VV), and software systems check-out. NOS3 provides a software development environment, a multi-target build system, an operator interface-ground station, dynamics and environment simulations, and software-based hardware models. NOS3 enables the development of flight software (FSW) early in the project life cycle, when access to hardware is typically not available. For small satellites there are extensive lead times on many of the commercial-off-the-shelf (COTS) components as well as limited funding for engineering test units (ETU). Considering the difficulty of providing a hardware test-bed to each developer tester, hardware models are modeled based upon characteristic data or manufacturers data sheets for each individual component. The fidelity of each hardware models is such that FSW executes unaware that physical hardware is not present. This allows binaries to be compiled for both the simulation environment, and the flight computer, without changing the FSW source code. For hardware models that provide data dependent on the environment, such as a GPS receiver or magnetometer, an open-source tool from NASA GSFC (42 Spacecraft Simulation) is used to provide the necessary data. The underlying infrastructure used to transfer messages between FSW and the hardware models can also be used to monitor, intercept, and inject messages, which has proven to be beneficial for VV of larger missions such as James Webb Space Telescope (JWST). As hardware is procured, drivers can be added to the environment to enable hardware-in-the-loop (HWIL) testing. When strict time synchronization is not vital, any number of combinations of hardware components and software-based models can be tested. The open-source operator interface used in NOS3 is COSMOS from Ball Aerospace. For testing, plug-ins are implemented in COSMOS to control the NOS3 simulations, while the command and telemetry tools available in COSMOS are used to communicate with FSW. NOS3 is actively being used for FSW development and component testing of the Simulation-to-Flight 1 (STF-1) CubeSat. As NOS3 matures, hardware models have been added for common CubeSat components such as Novatel GPS receivers, ClydeSpace electrical power systems and batteries, ISISpace antenna systems, etc. In the future, NASA IVV plans to distribute NOS3 to other CubeSat developers and release the suite to the open-source community.

Verification↗

Air Traffic Management Technology Demonstration - 3 (ATD-3) Dynamic Weather Routes Domestic En Route Concept of Operations Synopsis Version 1.0

NASA conducted a survey in 2015 of stakeholders in industry, flight operators, and others to collect data on the most pressing air traffic management (ATM) issues impacting en route operations. Weather related delays and interruptions were identified as the most significant and costly problem impacting en route operations in today's system. Additionally, future traffic demands will place greater demands on the FAA's air traffic control system, necessitate a more efficient and integrated traffic management system and provide controller tools to leverage human productivity. Consequently, NASA is assembling a suite of integrated ground and aircraft-based technologies and decision-making aids under the Airspace Technology Demonstrations 3 (ATD-3) project to continuously search for more efficient weather-avoidance routes and to rapidly respond to weather changes and associated traffic management initiatives. These route efficiency enhancements are targeted at en route airspace and will enable continued use of en route and arrival metering in the presence of weather. NASA's Dynamic Weather Routes (DWR) concept represents a subset of those technologies and focuses primarily on the cruise phase of flight. It leverages existing air traffic weather, airspace, and traffic data, as well as improvements in navigation, surveillance, communication and digital network technologies, and builds upon existing ATM automation to address the shortcomings associated with strategic traffic flow management initiatives and weather forecasting uncertainties. The potential benefits in the form of time, fuel, and cost savings are significant. This concept of operations synopsis provides a detailed description of DWR, its potential benefits and notional implementation paths.

DWR↗

Evaluating Tradeoffs Between Environmental Impact and Operational Costs for Enroute Air Traffic

The rapid growth of air traffic has drawn attention to aircraft-induced environmental impact. Aviation operations affect the environment mainly through the release of emissions and by the formation of contrails. Recent research has shown that altering aircraft cruise altitudes can reduce aviation environmental impact by reducing Absolute Global Temperature Change Potential, a climate assessment metric that adapts a linear system for modeling the global temperature response to aviation emissions and contrails. However, these methods will increase fuel consumption that leads to higher operational costs imposed on airlines resulting in reluctance to adopt a new routing strategy. This paper evaluates the tradeoff between environmental impact reduction and the corresponding added operational costs for enroute air traffic. The concept of social cost of carbon and the carbon auction price from California's recent cap-and-trade system were used to provide estimates and a methodology to evaluate environmental costs for carbon dioxide emissions and contrail formations. Depending on the specific environmental policy, the strategy is considered favorable when the reduction in environmental costs exceeds the increase in operational costs. The results show how the net environmental bene t varies with different decision-making time horizons, different carbon and fuel costs, and different days. The study provides guidance towards the development of the environmental reduction strategies.

environmental impact↗

Next Generation Aircraft Design Considering Airline Operations and Economics

Traditional approaches to design and optimization of a new system often use a system-centric objective and do not take into consideration how the operator will use this new system alongside other existing systems. When the new system design is incorporated into the broader group of systems, the performance of the operator-level objective can be sub-optimal due to the unmodeled interaction between the new system and the other systems. Among the few available references that describe attempts to address this disconnect, most follow an MDO (Multidisciplinary Design Optimization)-motivated sequential decomposition approach of first designing a very good system and then providing this system to the operator who, decides the best way to use this new system along with the existing systems. This paper addresses this issue by including aircraft design, airline operations, and revenue management "subspaces"; and presents an approach that could simultaneously solve these subspaces posed as a monolithic optimization problem rather than the traditional approach described above. The monolithic approach makes the problem an expensive Mixed Integer Non-Linear Programming problem, which are extremely difficult to solve. To address the problem, we use a recently developed optimization framework that simultaneously solves the subspaces to capture the "synergy" in the problem that the previous decomposition approaches did not exploit, addresses mixed-integer/discrete type design variables in an efficient manner, and accounts for computationally expensive analysis tools. This approach solves an 11-route airline network problem consisting of 94 decision variables including 33 integer and 61 continuous type variables. Simultaneously solving the subspaces leads to significant improvement in the fleet-level objective of the airline when compared to the previously developed sequential subspace decomposition approach.

Roy, Satadru↗

Information Displays and Crew Configurations for UTM Operations

In this paper we discuss how team configuration may influence how infor-mation is shared among team members for low-altitude Unmanned Aircraft Systems (UAS) operations. NASA collected and analyzed observation data gathered during a series of field tests for the UAS Traffic Management (UTM) project. The field tests were part of a larger effort aimed at advancing the UTM concept, conducted at six test-sites spread across the USA. Ground control station (GCS) concepts, flight-crew composition, and crew-size var-ied within and across test-sites. Flight crews took two strategic approaches to organizing their teams. The first of the two approaches was implemented by one third of the flight crews. These crews integrated the role of UTM opera-tor into the duties of existing crew members, merging the current roles with this new one, keeping the UTM Operator collocated with the flight crew. The remaining two thirds implemented a distributed team configuration, where a single UTM operator distributed support across multiple crews. Results from our data collection efforts revealed that UTM Operator location influenced whether flight crews used verbal communication versus displays to acquire UTM information.

teams↗

Human-Centered Operations

Efforts to improve operational safety often focus on preventing human error. But humans don't just make mistakes. They do, in fact, make a tremendous contribution to operational safety, and there is much to learn from what goes right. To support people in their role, the operation should be human-centered. To make the operation human-centered, the framework of the 4Ps can be used to create a clear, coherent, consistent and comprehensive guidance.

flight safety↗

Pixel-Level Calibration in the Kepler Science Operations Center Pipeline

We present an overview of the pixel-level calibration of flight data from the Kepler Mission performed within the Kepler Science Operations Center Science Processing Pipeline. This article describes the calibration (CAL) module, which operates on original spacecraft data to remove instrument effects and other artifacts that pollute the data. Traditional CCD data reduction is performed (removal of instrument/detector effects such as bias and dark current), in addition to pixel-level calibration (correcting for cosmic rays and variations in pixel sensitivity), Kepler-specific corrections (removing smear signals which result from the lack of a shutter on the photometer and correcting for distortions induced by the readout electronics), and additional operations that are needed due to the complexity and large volume of flight data. CAL operates on long (~30 min) and short (~1 min) sampled data, as well as full-frame images, and produces calibrated pixel flux time series, uncertainties, and other metrics that are used in subsequent Pipeline modules. The raw and calibrated data are also archived in the Multi-mission Archive at Space Telescope at the Space Telescope Science Institute for use by the astronomical community.

Calibration↗

A Concept of Operations for Earth Science Data Archive and Distribution in the Cloud

Science data systems can enable more comprehensive Earth system research by evolving to take advantage of advances in commercial computer technology services. Since their inception twenty five years ago, NASA's Earth Observing System Data and Information System (EOSDIS) Distributed Active Archive Centers (DAACs) have periodically evolved to utilize new technology and expand research using the exponential growth and diversity of Earth observations. Recently, with the advent of a maturing commercial compute services industry and upcoming high data volume missions such as the Surface Water and Ocean Topography (SWOT) mission and the NASA-Indian Space Research Organization Synthetic Aperture Radar (NISAR) mission, options were explored and a decision made to utilize commercial compute and storage services. This paper presents an overview of the concept of operations under development for the DAACs in the Cloud. We highlight the goals and expected advantages of utilizing Cloud services. We outline EOSDIS operations tenets and driving principles. A high-level view of EOSDIS system of systems target architecture serves as context for describing principle interactions. Concepts for key DAAC system and EOSDIS enterprise functions characterize automated end-to-end operations but mark nominal check and recovery points. Concepts are presented for managing Cloud resources, including organizational roles and responsibilities of the NASA project and DAAC personnel. Scenarios we use to further distinguish between what the system will do and what configuration and controls operators will have. Examples include interactions with data providers and data consumers with both in-cloud and on-premise facilities.

Moses, John F.↗

Simulated Tiltrotor Aircraft Operation in Close Proximity to a Building in Wind and Ground-Effect Conditions

A mid-fidelity computational fluid dynamics tool called RotCFD specifically developed to aid in rotorcraft studies has been applied to the study of wake interactions of civiltiltrotor aircraft in the immediate vicinity of buildings, in- and out-of-ground-effect, with and without winds, consistent with notional tiltrotor operations from urban vertiports. Such civil tiltrotor operations from urban vertiports could potentially enable city-center-to-city center commercial transport. However, in order to one day realize such civil tiltrotor operations, though, it is necessary to better understand the wake interaction and interactional aerodynamic operating environment of urban vertiports. In the early 2000s, a series of 7-by-10 Ft. wind tunnel tests were conducted at NASA Ames Research Center that began to explore some of these civil tiltrotor and vertiport wake interactioninteractional aerodynamics issues. This study seeks to validate computation fluid dynamic predictions against these early wind tunnel experimental results and, thereby, continue exploration of this important research area.

Rotorcraft↗

NASA CA Operations Devolution: Status Update

What is Devolution? Devolution is a spreading of CA (Conjunction Assessment) operations responsibilities to mission FOTs (Flight Operations Teams): Permits efficiencies in handling the increased workload caused by Space Fence and large constellations; Missions given more flexibility in choosing specific approach to CA requirements that resonates best with their particular needs; CARA (Conjunction Assessment Risk Analysis) retains Agency oversight through an established NASA Standard - will establish requirements for devolved CA preparations, processing, and operations conduct. Devolution is a PROPOSED paradigm under consideration by SMD (Space Missions Directorate): Number of activities required before Agency-level decision can be rendered; Agency requirements established via approved CA Standard; Operational experience testimony from two separate pilot programs; After these activities complete, decision will be made whether devolution is a feasible option for missions; CARA is recommending devolution to exist as an option for missions.

conjunction↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit (LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end June 30, 2016. To date the IPS has been operated for approximately 48,458 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through the completion of Dawn’s primary mission.

Garner, Charles E.↗

Labor Estimation and Trending in an Operations Environment

Accurate cost estimation for future work is important for ensuring that organizations have the personnel and resources needed to complete a task successfully. Operations support in particular provides additional challenges for estimating cost. Unlike manufacturing-based work, it may be difficult to derive a "cost per product," and projects that appear to be similar may have drastically different underlying assumptions. In addition, for critical operations, a certain level of adaptability to changing circumstances is expected. Responding to contingencies or anomalies requires additional support and troubleshooting, and could result in increases to project cost. Labor estimation is one of the most important inputs for estimating the cost of an operations-based project, especially in a pre-established facility. Various methods are needed to develop reliable estimates. These methods include a bottom-up summarization of known or expected work items, and a top-down estimate generated by trending and scaling actual labor from past analogous operations support.

Laing, Jason↗

Optimizing Integrated Arrival, Departure and Surface Operations Under Uncertainty

In airports and surrounding terminal airspaces, the integration of arrival, departure and surface scheduling and routing have the potential to improve the operations efficiency. Recent research had developed mixed-integer-linear programming algorithm-based scheduler for integrated arrival and departure operations in the presence of uncertainty. This paper extends to the surface previous research performed by the authors to integrate taxiway and runway operations. The developed algorithm is capable of computing optimal aircraft schedules and routings that reflects the integration of air and ground operations. A preliminary study case is conducted for a set of thirteen aircraft evolving in a model of the Los Angeles International airport and surrounding terminal areas. Using historical data, a representative traffic scenario is constructed and probabilistic distributions of pushback delay and arrival gate delay are obtained. To assess the benefits of optimization, a First- Come-First-Serve algorithm approach comparison is realized. Evaluation results demonstrate that the optimization can help identifying runway sequencing and schedule that reduce gate waiting time without increasing average taxi times.

Bosson, Christabelle↗

Mars Cube One (MarCO) Shifting the Paradigm in Relay Deep Space Operations

A very significant challenge in the planetary mission design and operations is communications with ground control teams during critical events and highly risky maneuvers. These include entry, descent, and landing (EDL) and orbit insertion, which should not be carried out in the blind. Although vast planetary distances and long round-trip light times disallow real-time intervention from controllers, acquiring the relevant event performance parameters in near real-time can be imperative for determining the corrective actions needed immediately following or, in the case of significant anomalies, aid in the diagnostic analysis. During several previous Mars missions landing events, and the Huygens probe landing on Titan, the communications strategy relied on proximity links to planetary orbiters, which then relayed the data to the Deep Space Network (DSN). In addition, attempts were successfully made in parallel to receive the signal carrier directly at Earth often using large radio telescopes when the wavelength was outside the DSN’s reception bands. This Direct-to-Earth (DTE) back-up method was only possible due to special techniques utilizing the DSN’s open-loop Radio Science Receivers. In every case, it was very challenging since the link budget of a landing vehicles were designed for proximity orbiter relays and not for distances across the solar system. A new method is introduced since not all future missions can rely on the presence of pre-existing orbiters at their planetary targets to relay their critical data ad, furthermore, most missions would not likely have the resources to implement a reliable DTE link at acceptable data rates, bypassing a need for a relay asset. With the advent CubeSat form-factor spacecraft, one or more, for added reliability, CubeSats can be launched with the primary mission, travel to the target, and be positioned to view the critical event, such as EDL, and carry out real-time relay of the data to the DSN at higher rates. CubeSats have flown in the Earth environment but never flown or been operated in deep space or planetary environment so careful design as well as flight experience are needed. The relay function requires the development of radio and antenna systems to meet challenging specifications. After initial technical demonstration of the concept and operational experience, the cost can decrease as systems become more standardized with increased reliability. This paper describes the invention of the “carry your own relay” concept and the formulation of the mission likely to be the first planetary CubeSat mission called Mars Cube One (MarCO). It also describes the operational concept of relay small spacecraft and their role reducing mission risk as well as overall mission cost.

Asmar, Sami↗

In-flight Operation of the Dawn Ion Propulsion System Through the Low Altitude Mapping Orbit at Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional ΔV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to the Approach phase, survey orbit, the high altitude mapping orbit (HAMO), and the low altitude mapping orbit )LAMO) with arrival to LAMO on December 13, 2015, almost eight years after the start of deterministic thrusting to Vesta. The LAMO orbit, at a mean altitude above Ceres of approximately 385 km, is the spacecraft’s final destination and there are no plans to move the spacecraft from LAMO once science operations there are completed. Since arrival at LAMO Dawn’s IPS has been used for occasional orbit maintenance maneuvers while the spacecraft performs scientific investigations. Dawn has successfully completed its science goals and Dawn’s primary mission is scheduled to end in the summer of 2016. To date the IPS has been operated for over 48,454 hours, consumed approximately 401 kg of xenon, and provided a delta-V of over 11.0 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2016. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations from Survey orbit through June 2016.

Garner, Charles E.↗

Safely Enabling Low-Altitude Airspace Operations: Unmanned Aerial System Traffic Management (UTM)

Many beneficial civilian applications of UAS have been proposed, from goods delivery and infrastructure surveillance, to search and rescue, and agricultural monitoring. As UAS operations require interactions with a mix of general aviation aircraft, helicopters and gliders, there is a strong need to safely accommodate all of these vehicles at lower altitudes. Currently, there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. A UAS traffic management (UTM) system for low-altitude airspace is needed, much like today's surface vehicles that operate within a system consisting of roads, lanes, stop signs, rules, and lights, regardless of whether the vehicle is automated or driven by a human. This talk will focus on the UAS Traffic Managment Concept of Operations.

ATM↗

Pioneer F/G: Spacecraft Operational Characteristics

The Pioneer F/G Spacecraft Operational Characteristics Study was performed by TRWS systems Group for the National Aeronautics and Space Administration, Ames Research Center (NASA/ARC) between Novembe1970 and April 1971, under contract NAS2-6255. The purpose of this study is to describe the operational characteristics of the Pioneer F and G spacecraft system and its subsystems to the NASA/ARC Pioneer Project personnel having the responsibility for conducting the Pioneer F/G flight mission operations. This report, "Pioneer F/G Spacecraft Operational Characteristics," is the final report of this study.

Hall, Charlie F.↗