Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “project”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,621 records · Page 90

Idaho National Laboratory’s Analysis of ARRA-Funded Plug-in Electric Vehicle and Charging Infrastructure Projects: Final Report

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s (DOE) Idaho National Laboratory (INL), is the lead laboratory for U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA). INL’s conduct of the AVTA resulted in a significant base of knowledge and experience in the area of testing light-duty vehicles that reduced transportation-related petroleum consumption. Due to this experience, INL was tasked by DOE to develop agreements with companies that were the recipients of The American Recovery and Reinvestment Act of 2009 (ARRA) grants, that would allow INL to collect raw data from light-duty vehicles and charging infrastructure. INL developed non-disclosure agreements (NDAs) with several companies and their partners that resulted in INL being able to receive raw data via server-to-server connections from the partner companies. This raw data allowed INL to independently conduct data quality checks, perform analysis, and report publicly to DOE, partners, and stakeholders, how drivers used both new vehicle technologies and the deployed charging infrastructure. The ultimate goal was not the deployment of vehicles and charging infrastructure, cut rather to create real-world laboratories of vehicles, charging infrastructure and drivers that would aid in the design of future electric drive transportation systems. The five projects that INL collected data from and their partners are: • ChargePoint America - Plug-in Electric Vehicle Charging Infrastructure Demonstration • Chrysler Ram PHEV Pickup - Vehicle Demonstration • General Motors Chevrolet Volt - Vehicle Demonstration • The EV Project - Plug-in Electric Vehicle Charging Infrastructure Demonstration • EPRI / Via Motors PHEVs – Vehicle Demonstration The document serves to benchmark the performance science involved the execution, analysis and reporting for the five above projects that provided lessons learned based on driver’s use of the vehicles and recharging decisions made. Data is reported for the use of more than 25,000 vehicles and charging units.

33 ADVANCED PROPULSION SYSTEMS↗

Iowa Hill Pumped Storage Project Investigations - Final Technical Report

This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

13 HYDRO ENERGY↗

The EV Project Price/Fee Models for Publicly Accessible Charging

As plug-in electric vehicles (PEVs) are introduced to the market place and gain more consumer acceptance, it is important for a robust and self-sustaining non-residential infrastructure of electric vehicle supply equipment (EVSE) to be established to meet the needs of PEV drivers. While federal and state financial incentives for electric vehicles were in place and remain so today, future incentives are uncertain. In order for PEVs to achieve mainstream adoption, an adequate and sustainable commercial or publicly available charging infrastructure was pursued by The EV Project to encourage increased PEV purchases by alleviating range anxiety, and by removing adoption barriers for consumers without a dedicated overnight parking location to provide a home-base charger. This included determining a business model for publicly accessible charge infrastructure. To establish this business model, The EV Project team created a fee for charge model along with various ancillary offerings related to charging that would generate revenue. And after placing chargers in the field the Project rolled out this fee structure.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

DE-EE0006714 Final Report-Project Icebreaker™

Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electrical System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.

17 WIND ENERGY↗

Community Engagement and Equity in Renewable Energy Projects: A Literature Review

Projects to transition away from fossil fuels toward renewables can prompt opposition even if their proponents engage with the public and affected communities. Therefore, many scholars and practitioners call for a nuanced understanding of the challenges and opportunities of participation and engagement in decision-making processes. This literature review examines: (a) the nature of and links between engagement and equity in energy transition projects, and (b) the lessons learned, best practices and options in this emerging field. The goal of this report is to inform the U.S. Department of Energy (DOE) and proponents of renewable energy projects, such as the siting of bioenergy infrastructure, with knowledge on what engagement is, why and how it works on the ground, and how it relates to crucial societal elements of energy equity such as social acceptance, energy democracy, and equity outcomes.

09 BIOMASS FUELS↗

Graton Rancheria Solar G.R.E.E.N. Project (Final Report)

Final Technical Report Graton Rancheria Solar GREEN Project to install approximately 1.7 megawatts (MW) of rooftop solar to provide electricity to four Tribally owned buildings on Tribal trust land located in Sonoma County. The project is the first solar photovoltaic (PV) installation by the Tribe on Tribal lands and complement previously installed clean energy projects including multiple electric vehicle chargers located at the Tribe’s economic enterprise.

14 SOLAR ENERGY↗

Pipeline for Integrated Projects in Energy Systems (PIPES): A Tool for Integrated System Planning [Slides]

The Pipeline for Integrated Projects in Energy Systems (PIPES) is a comprehensive project, data, and workflow management tool designed for integrated modeling teams. PIPES facilitates the management of data requirements, tasks, and progress tracking, serving as a higher-level integration layer that works across various data and modeling software. This tool integrates models, data, and tools to perform large-scale, integrated analysis work at scale. PIPES is designed to streamline integrated modeling projects, enhance collaboration, and ensure the quality and efficiency of data management and workflow processes. This presentation introduces PIPES a multi-model tool for integrated system planning; it describes the underlying architecture, deep dives into common user workflows, and outlines the upcoming development roadmap beyond its current alpha state.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

BUQEYE guide to projection-based emulators in nuclear physics

The BUQEYE collaboration (Bayesian Uncertainty Quantification: Errors in Your effective field theory) presents a pedagogical introduction to projection-based, reduced-order emulators for applications in low-energy nuclear physics. The term emulator refers here to a fast surrogate model capable of reliably approximating high-fidelity models. As the general tools employed by these emulators are not yet well-known in the nuclear physics community, we discuss variational and Galerkin projection methods, emphasize the benefits of offline-online decompositions, and explore how these concepts lead to emulators for bound and scattering systems that enable fast and accurate calculations using many different model parameter sets. We also point to future extensions and applications of these emulators for nuclear physics, guided by the mature field of model (order) reduction. All examples discussed here and more are available as interactive, open-source Python code so that practitioners can readily adapt projection-based emulators for their own work.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Predicting beam transmission using 2-dimensional phase space projections of hadron accelerators

We present a method to compress the 2D transverse phase space projections from a hadron accelerator and use that information to predict the beam transmission. This method assumes that obtaining at least three projections of the 4D transverse phase space is possible and that an accurate simulation model is available for the beamline. Using a simulated model, we show that—a computer can train a convolutional autoencoder to reduce phase-space information which can later be used to predict the beam transmission. Finally, we argue that although using projections from a realistic nonlinear distribution produces less accurate results, the method still generalizes well.

43 PARTICLE ACCELERATORS↗

Prometheus Project final report

This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

Prometheus Project↗

Understanding Pre-Quantitative Risk in Projects

Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

risk levels.↗

Curiosity: the Mars Science Laboratory Project

The Curiosity rover landed successfully in Gale Crater, Mars on August 5, 2012. This event was a dramatic high point in the decade long effort to design, build, test and fly the most sophisticated scientific vehicle ever sent to Mars. The real achievements of the mission have only just begun, however, as Curiosity is now searching for signs that Mars once possessed habitable environments. The Mars Science Laboratory Project has been one of the most ambitious and challenging planetary projects that NASA has undertaken. It started in the successful aftermath of the 2003 Mars Exploration Rover project and was designed to take significant steps forward in both engineering and scientific capabilities. This included a new landing system capable of emplacing a large mobile vehicle over a wide range of potential landing sites, advanced sample acquisition and handling capabilities that can retrieve samples from both rocks and soil, and a high reliability avionics suite that is designed to permit long duration surface operations. It also includes a set of ten sophisticated scientific instruments that will investigate both the geological context of the landing site plus analyze samples to understand the chemical & organic composition of rocks & soil found there. The Gale Crater site has been specifically selected as a promising location where ancient habitable environments may have existed and for which evidence may be preserved. Curiosity will spend a minimum of one Mars year (about two Earth years) looking for this evidence. This paper will report on the progress of the mission over the first few months of surface operations, plus look retrospectively at lessons learned during both the development and cruise operations phase of the mission..

project formulation↗

Case Study: Managing Undergraduate Interns in the Context of Multidisciplinary Projects

Internship opportunities can be immensely beneficial to both the students who pursue them and the labs that employ them. However, optimal results for all stakeholders can be uncertain. Several factors compound this issue. In this case study, the highly multidisciplinary nature of the BioEngineering Instrumentation Group at NASA Ames Research Center has made productively integrating short-term summer interns challenging. In general, taking on more undergraduate interns during a given time period can lead to diminishing returns, particularly if those interns are primarily short-time interns with few long-term senior students present.Introducing a level of industry-style project management processes can help. On the one hand, extreme formality can reduce the enthusiasm that students can bring; also, time constraints on internships make extensive training in formal process an investment with comparatively little return. On the other hand, lack of process can result in many forms of wastage. A moderate, lightweight level of process i.e., simple processes with high payoff to time invested ratios, including processes to effectively handle multidisciplinary issues can yield both a far more efficient lab, and a richer educational experience for the interns. In this case study, we implemented simple processes such as brief weekly stand-up meetings, a standard action item bug tracking process, and deadline-based scheduling with prudent reserves and critical path tracking.To evaluate these steps, several parameters were considered: the number of projects the lab could successfully pursue, the number of interns that could be successfully integrated onto each project, diversity of student intern educational backgrounds, student satisfaction, student understanding of expectations, and student preparation for industry-standard work. Generally, outcomes were enhanced across the board, even with imperfectly implemented processes. Lightweight process implementation is shown to be tremendously effective in a multidisciplinary internship context.

Case Study↗

Inter-Model Warming Projection Spread: Inherited Traits from Control Climate Diversity

Since Chaney’s report, the range of global warming projections in response to a doubling of CO2—from 1.5 °C to 4.5 °C or greater—remains largely unscathed by the onslaught of new scientific insights. Conventional thinking regards inter-model differences in climate feedbacks as the sole cause of the warming projection spread (WPS). Our findings shed new light on this issue indicating that climate feedbacks inherit diversity from the model control climate, besides the models’ intrinsic climate feedback diversity that is independent of the control climate state. Regulated by the control climate ice coverage, models with greater (lesser) ice coverage generally possess a colder (warmer) and drier (moister) climate, exhibit a stronger (weaker) ice-albedo feedback, and experience greater (weaker) warming. The water vapor feedback also inherits diversity from the control climate but in an opposite way: a colder (warmer) climate generally possesses a weaker (stronger) water vapor feedback, yielding a weaker (stronger) warming. These inherited traits influence the warming response in opposing manners, resulting in a weaker correlation between the WPS and control climate diversity. Our study indicates that a better understanding of the diversity amongst climate model mean states may help to narrow down the range of global warming projections.

Climate feedbacks↗

Earned Value Management (EVM): Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects.

Control Account Manager↗

Georgia Energy III Project Summary - Identifying Habitat and Solar Site Conflict in Georgia by Developing an Environmental Sensitivity Public Mapping Too

The rapid expansion of the solar industry across the state of Georgia has a detrimental effect on the habitats of keystone and threatened species, such as the gopher tortoise (Gopherus polyphemus) and the American black bear (Ursus americanus). NASA DEVELOP collaborated with the Georgia Chapter of The Nature Conservancy (TNC) and the Georgia Department of Natural Resources to continue the research from two previous NASA DEVELOP projects in 2017. The team worked to assess the conflict between solar suitability and environmentally sensitive areas with the Land-Use Conflict Identification Strategy (LUCIS) and to determine how conflict has changed since the 2017 analysis. The project utilized Terra/Aqua Clouds and the Earth's Radiant Energy System (CERES) satellite data and other ancillary datasets to conduct and compare a general statewide LUCIS analysis from 2017 to 2019 and to complete an in-depth LUCIS analysis of Georgia’s fastest-growing solar counties—Taylor, Twiggs, Decatur, and Brooks. The analysis indicated that between 2017 and 2019, the entire state saw high conflict areas increase by 38%. Project partners will use these findings to target areas for promotion of conservation policy and education efforts. The team also provided the TNC with a publicly available web application, called the Environmental Sensitivity Mapping Tool (ESMT), that can be updated as new data are released. The ESMT will be used to educate interest groups, such as solar developers and conservationists, to help them recognize and mitigate the negative effects of solar development on the environment.

DEVELOP Project Summary↗

US Tropical Cyclone Activity in the 2030s Based on Projected Changes in Tropical Sea-Surface Temperature

We use a statistical tropical cyclone (TC) model, the North Atlantic Stochastic Hurricane Model (NASHM), in combination with sea-surface temperature (SST) projections from climate models, to estimate regional changes in US TC activity into the 2030s. NASHM is trained on historical variations in TC characteristics with two SST indices: global-tropical mean SST and the difference between tropical North-Atlantic (NA) SST and the rest of the global tropics, often referred to as “relative SST.” Testing confirms the model’s ability to reproduce historical US TC activity, as well as to make skillful predictions. When NASHM is driven by SST projections into the 2030s, overall NA annual TC counts increase, and the fractional increase is the greatest at the highest wind intensities. However, an eastward anomaly in mean TC tracks and an eastward shift in TC formation region result in a geographically-varied signal in US coastal activity. Florida’s Gulf coast is projected to see significant increases in TC activity, compared to the long-term historical mean, and these increases are fractionally greatest at the highest intensities. By contrast, the northwestern US Gulf and the US East Coast will see little change.

tropical cyclone (TC) model↗