Abstract

This Final Report serves as an executive summary of the Prometheus Project's activities and deliverables from November 2002 through September 2005. It focuses on the challenges from a technical and management perspective, what was different and innovative about this project, and identifies the major options, decisions, and accomplishments of the Project team as a whole. However, the details of the activities performed by DOE NR and its contractors will be documented separately in accordance with closeout requirements of the DOE NR and consistent with agreements between NASA and NR.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Taylor, Randall. 2005-10-01. Prometheus Project final report. https://ntrs.nasa.gov/citations/20060043352

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Lunar fission surface power system design and implementation concept

The request of NASA's Exploration Systems Mission Directorate (ESMD) in May of 2005, a team was assembled within the Prometheus Project to investigate lunar surface nuclear power architectures and provide design and implementation concept inputs to NASA's Exploration Systems Architecture 60-day Study (ESAS) team. System engineering tasks were undertaken to investigate the design and implementation of a Fission Surface Power System (FSPS) that could be launched as early as 2019 as part of a possible initial Lunar Base architecture. As a result of this activity, the Prometheus team evaluated a number of design and implementation concepts as well as a significant number of trades associated with lunar surface power, all culminating in a recommended approach. This paper presents the results of that study, including a recommended FSPS design and implementation concept.