At least 1,621 records · Page 90

Textual and Network Analysis of Part 107 Waivers

Context: The management of hazards in sUAS operations is not as well defined as today's commercial operations despite sUAS widespread use. Part 107 waived operations' provisions, which manage hazards for higher risk operations that require approval, can offer insight to organizations establishing UAS Programs in managing their own operation hazards. Aim: We seek to understand how the FAA Part 107 waived operations manage hazards. Method: We used the constant comparative method to identify hazard mitigation textual categories from provisions and use networks to assess the dispersion of provisions and the identified categories across issued waivers. Results: Eight mitigation categories and twenty-four sub-categories were identified. Most provisions present in waivers are mostly reused in one waiver. Conclusion: While there is a broad range of provisions to control for hazard mitigations in the Part 107 issued waivers analyzed regulations, they require case-by-case modifications.

Urban Air Mobility↗

Textual and Network Analysis of Title 14 CFR Part107 Waivers

Context: The management of hazards in small unmanned aircraft systems (sUAS) operations is not as well defined as today's commercial operations despite sUAS widespread use. FAA Title 14 Code of Federal Regulations (CFR) Part 107 waived operations' provisions, which manage hazards for higher risk operations that require approval, can offer insight to organizations establishing UAS Programs in managing their own operation hazards. Aim: We seek to understand how the Title 14 CFR Part 107 waived operations manage hazards. Method: We used the constant comparative method to identify hazard mitigation textual categories from provisions and use networks to assess the dispersion of provisions and the identified categories across issued waivers. Results: Eight mitigation categories and twenty-four sub-categories were identified. Most provisions present in waivers are mostly reused in one waiver. Conclusion: While there is a broad range of provisions to control for hazard mitigations in the Title 14 CFR Part 107 issued waivers analyzed regulations, they require case-by-case modifications.

Urban Air Mobility↗

Building a Clean Energy Workforce: An Evaluation Framework for State Energy Office Workforce Programs

This fact sheet is a summary of the workforce evaluation framework that was first proposed in the white paper, An Evaluation Framework for State Energy Offices' Energy Efficiency and Clean Energy Workforce Program. This evaluation framework was developed to guide State Energy Offices (SEOs) in assessing and enhancing the workforce development programs the manage, fund, or partner on. By following this step-by-step framework, SEOs can evaluate program components, identify areas for improvement, and optimize program outcomes for greater impact.

clean energy↗

Prediction analysis and management decisions.

Prediction analysis techniques /PAT/ using statistical methods, computers, error analysis, etc, for system weight, performance and other parameter predictions in Apollo program

PROGRAM MANAGEMENT↗

Risk Management for Human Support Technology Development

NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

jones, Harry↗

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

Chemical Hygiene Program

The Chemical Management Team is responsible for ensuring compliance with the OSHA Laboratory Standard. The program at Lewis Research Center (LeRC) evolved over many years to include training, developing Standard Operating Procedures (SOPS) for each laboratory process, coordinating with other safety and health organizations and teams at the Center, and issuing an SOP binder. The Chemical Hygiene Policy was first established for the Center. The Chemical Hygiene Plan was established and reviewed by technical, laboratory and management for viability and applicability to the Center. A risk assessment was conducted for each laboratory. The laboratories were prioritized by order of risk, higher risk taking priority. A Chemical Management Team staff member interviewed the lead researcher for each laboratory process to gather the information needed to develop the SOP for the process. A binder containing the Chemical Hygiene Plan, the SOP, a map of the laboratory identifying the personal protective equipment and best egress, and glove guides, as well as other guides for safety and health. Each laboratory process has been captured in the form of an SOP. The chemicals used in the procedure have been identified and the information is used to reduce the number of chemicals in the lab. The Chemical Hygiene Plan binder is used as a training tool for new employees. LeRC is in compliance with the OSHA Standard. The program was designed to comply with the OSHA standard. In the process, we have been able to assess the usage of chemicals in the laboratories, as well as reduce or relocate the chemicals being stored in the laboratory. Our researchers are trained on the hazards of the materials they work with and have a better understanding of the hazards of the process and what is needed to prevent any incident. From the SOP process, we have been able to reduce our chemical inventory, determine and implement better hygiene procedures and equipment in the laboratories, and provide specific training to our employees. As a result of this program, we are adding labeling to the laboratories for emergency responders and initiating a certified chemical user program.

Mayor, Antoinette C.↗

Kennedy Space Center exercise program

The Kennedy Space Center (KSC) Fitness Program began in Feb. 1993. The program is managed by the Biomedical Operations and Research Office and operated by the Bionetics Corporation. The facilities and programs are offered to civil servants, all contractors, temporary duty assignment (TDY) participants, and retirees. All users must first have a medical clearance. A computer-generated check-in system is used to monitor participant usage. Various aspects of the program are discussed.

Hoffman, Cristy↗

Willpower

I am struck by how often failure is blamed on a lack of discipline. You often hear losing coaches cite this as the reason for a big loss. I don't recall the last time I heard one say that his team lost a game because of his players' lack of skill. I think a breakdown in discipline is also one of the key reasons why program and project management teams fail to meet expectations. The first program I ever managed had a clear set of priorities. I understood the mandate, and so did everyone else on the team. We set an ambitious schedule and started to work fervently. Not too long into the program the customer wanted to know what performance he was going to get. I replied by categorizing the performance parameters into three bins: 1. Performance you will get. 2. Performance you may get. 3. Performance that there's no way you will get. Did that cause an uproar. The customer demanded everything in the second bin be moved to the first, and most everything in the third bin moved to the second. My immediate impulse was to agree, but I managed to overcome that. In my heart, I knew that we would never meet the already ambitious schedule if we had to deliver more performance. No was my answer. The program turned out to be a huge success, but the result would have been largely different had senior management or I failed to maintain discipline.

Little, Terry↗

Configuration Management at NASA

NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

Doreswamy, Rajiv↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, Space Launch System (SLS), is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations program is transforming Kennedy Space Center into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 metric tons to low Earth orbit, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the Exploration Upper Stage, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the Proving Ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Mission management aircraft operations manual

This manual prescribes the NASA mission management aircraft program and provides policies and criteria for the safe and economical operation, maintenance, and inspection of NASA mission management aircraft. The operation of NASA mission management aircraft is based on the concept that safety has the highest priority. Operations involving unwarranted risks will not be tolerated. NASA mission management aircraft will be designated by the Associate Administrator for Management Systems and Facilities. NASA mission management aircraft are public aircraft as defined by the Federal Aviation Act of 1958. Maintenance standards, as a minimum, will meet those required for retention of Federal Aviation Administration (FAA) airworthiness certification. Federal Aviation Regulation Part 91, Subparts A and B, will apply except when requirements of this manual are more restrictive.

Source record↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗