NASA NTRS ยท 20140000638
Configuration Management at NASA
Abstract
NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt
Keep this discovery
Explore connections, maps & timelines
Doreswamy, Rajiv. 2013-06-04. Configuration Management at NASA. https://ntrs.nasa.gov/citations/20140000638
Cite the original work for its findings. Save a collection to share your selection of sources.