Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Low Background kTon-Scale Liquid Argon Time Projection Chambers

We find that it is possible to increase sensitivity to low energy physics in a third or fourth DUNE-like module with careful controls over radiopurity and some modifications to a detector similar to the DUNE Far Detector design. In particular, sensitivity to supernova and solar neutrinos can be enhanced with improved MeV-scale reach. A neutrinoless double beta decay search with $^{136}$Xe loading appears feasible. Furthermore, sensitivity to Weakly-Interacting Massive Particle (WIMP) Dark Matter (DM) becomes competitive with the planned world program in such a detector, offering a unique seasonal variation detection that is characteristic for the nature of WIMPs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Panel Session 134: Stakeholder Involvement in Consolidated ISF Storage, Disposal, and Transportation Initiatives

Planning of activities related to waste storage, transportation, and disposal requires involvement and engagement on the parts of both regulators and stakeholders. There have been challenges felt by both parties, which has led to discussions about how to best proceed with projects not just from a technical perspective, but how to create better relationships between the general public and scientific community. This panel was designed to highlight lessons learned, best practices, and next steps in anticipated projects. This panel focused on the current efforts undertaken by initiatives to involve stakeholders for the success of ISF Storage and Disposal facilities. For example, two license applications were submitted to the US NRC by two private entities - Interim Storage Partners (WCS, Inc, and Orano) and Holtec, Inc./ELLA - for consolidated ISF in West Texas and in NM (respectively). This panel discussed elements needed for success in engaging various stakeholders at all levels of the project life cycle, and can include lessons learned from previous projects. Panelists with presentations: Stakeholder Engagement in SNF Storage and Disposal (Miriam Juckett); Stakeholders, Siting and Nuclear Waste Disposal -Thoughts on a Path Forward (Jim Hamilton)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 23: Start-up of Three Major DOE Treatment Facilities - SWPF, IWTU and DFLAW

This panel focused on the DOE-EM planning to complete construction and start up three major treatment facilities in the next 18 months. This included the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste treatment Unit (IWTU) at Idaho and the Direct Feed Low-Activity Waste (DFLAW) at Hanford. DOE Site Managers from SC, ID and WA introduced each facility then the DOE Contractor provided the details on their biggest challenges in regulatory issues, construction, start-up and operations of each facility. Panelists with presentations: Lessons in Managing Risks in First of a Kind Nuclear Construction and Start-Up (Pamela Marks); Integrated Waste Treatment Unit (Connie Flohr); IWTI-Fluor (Frederick Hughes); Startup and Commissioning (Tom Fletcher)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Holistic Framework for Teamwork Between Multiple Organizations or Areas of Expertise - 20021

Teamwork can harness the collective energy of people to solve complex problems. Yet, teamwork requires more than just putting people together. Complexity is added when people from different organizations or areas of expertise form a team to accomplish specific ends. Every organization is designed to fulfill certain purposes and, as such, it has unique objectives and values and it operates according to methods, procedures, and norms intended to fulfill those objectives and values. And each field of expertise, with its specialized knowledge, uses certain methods to approach and solve problems. Teams that consist of people from multiple organizations or areas of expertise often have the added demands of reconciling dissimilar methods of getting the work done, of sharing information and knowledge that everyone may not have, and of taking into account the goals and objectives of multiple parties. The ideas presented here help teams meet these added demands. This paper introduces a framework that highlights three aspects of teamwork: the physical aspects (what team members do), the mental/intellectual aspects (what team members know and think), and the social/spiritual aspects (what team members feel about others' needs and objectives). These three aspects are easy to remember and intuitive to work with, and when one aspect of a team's work is strengthened, the other two are strengthened as well. (authors)

99 GENERAL AND MISCELLANEOUS↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

A product data network to enable faster, easier, and better planning of building envelopes

The building envelopes contributes significantly to the energy-efficiency of the building. Building performance simulation has made it possible to compare façade technologies regarding energy demand, daylighting, thermal and visual comfort in detail. Planners, such as architects and engineers, need experience to find product data with the right quality and level of detail, and to process the data to fit the calculation and the application. In the available time, planners can compare only a limited number of products, which means that better solutions could go unnoticed. This paper presents a new concept for making product data easily accessible for building façade planning. The concept consists of a network of databases for the efficient exchange and use of optical and calorimetric data of glazing units, shading devices, and combinations of both. The paper presents the research questions, an analysis of the current challenges, six design goals for the product data network and its implementation together with a discussion. Many product data sources can be connected to many planning software applications via the specified application programming interface. When planning software connects to the product data network, the planning of building envelopes can be much faster because planners do not need to spend so much time to search and process product data manually. The planning of building envelopes can also become much easier, especially for planners with limited experience. They do not need to understand all the details about which data fits which calculation if the software company implements this. The planning of building envelopes can become much more reliable when software companies validate their use of the product data network, because the current manual process is prone to errors. The planning of building envelopes can also improve because more products can be compared in the available time, allowing better solutions to be found.

Maurer, Christoph↗

Long Range Community Planning Process for Fusion Sciences and Plasma Physics (Final Technical Report)

This grant facilitated the APS-DPP Community Planning Process (DPP-CPP) which was a strategic planning process with the goals of identifying scientific and technological opportunities in the fields of Plasma Physics and Fusion Energy Science, and making consensus recommendations for a strategy to address these opportunities to the DOE Office of Fusion Energy Science Advisory Committee (FESAC). The DPP-CPP was initiated by the APS-DPP executive committee in order to help FESAC fulfill a charge from DOE to develop a strategic plan for the DOE Office of Fusion Energy Science (FES). In this charge, the DOE Deputy Director for Science, Dr. Stephen Binkley, requests “that the Fusion Energy Sciences Advisory Committee (FESAC) undertake a new long-range strategic planning activity for the Fusion Energy Sciences (FES) program. The strategic planning activity - to encompass the entire FES research portfolio (namely, burning plasma science and discovery plasma science) - should identify and prioritize the research required to advance both the scientific foundation needed to develop a fusion energy source, as well as the broader FES mission to steward plasma science.” The process as set out in the proposal (and below) was successful in meeting all of its stated goals culminating in the final report to the FESAC subcommittee given the charge.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Results of Re-evaluation of FEPs Related to Implementing the ABD Glass Program

The Savannah River Site plans to reprocess defense spent nuclear fuel currently stored in their L-Basin via the Accelerated Basin Deinventory (ABD) Program. The previous plan for the L-Basin spent nuclear fuel was to dispose of it directly in the federal repository without reprocessing. Implementing the ABD Program will result in final disposal of approximately 900 fewer canisters of defense spent nuclear fuel and the production of approximately 521 more canisters of vitrified high-level waste glass with some specific differences from the planned high-level waste glass. Because the 235U in the L-Basin spent nuclear fuel is not intended to be recovered, the fissile mass loading of the vitrified high-level glass waste form to be produced must be increased above the current value of 897 g/m 3 to a maximum of 2,500 g/m 3 . Therefore, implementing the ABD Program would produce a variant of high-level waste glass—the ABD glass—that needs to be evaluated for future repository licensing, which includes both preclosure safety and postclosure performance. This report describes the approach to and summarizes the results of an evaluation of the potential effects of implementing the ABD Program at the Savannah River Site on the technical basis for future repository licensing for a generic repository that is similar to Yucca Mountain and for one that is fully generic. This evaluation includes the effects on preclosure safety analyses and postclosure performance assessment for both repository settings. The license application for the proposed Yucca Mountain repository (DOE 2008), which is serving as a framework for this evaluation, concluded that the proposed Yucca Mountain repository would meet all applicable regulatory requirements. The evaluation documented in this report found that implementing the ABD Program is not expected to change that conclusion for a generic repository similar to Yucca Mountain or for a generic repository with respect to the preclosure safety analyses. With respect to the postclosure performance of a generic repository, no concerns were identified.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Broadband Solenoidal Haloscope for Terahertz Axion Detection

We introduce the Broadband Reflector Experiment for Axion Detection (BREAD) conceptual design and science program. This haloscope plans to search for bosonic dark matter across the [ 10 - 3 , 1 ] eV ([0.24, 240] THz) mass range. BREAD proposes a cylindrical metal barrel to convert dark matter into photons, which a novel parabolic reflector design focuses onto a photosensor. This unique geometry enables enclosure in standard cryostats and high-field solenoids, overcoming limitations of current dish antennas. A pilot 0.7 m 2 barrel experiment planned at Fermilab is projected to surpass existing dark photon coupling constraints by over a decade with one-day runtime. Axion sensitivity requires < 10 - 20 W / Hz sensor noise equivalent power with a 10 T solenoid and 10 m 2 barrel. We project BREAD sensitivity for various sensor technologies and discuss future prospects.

Liu, Jesse↗

Regulatory Mechanisms to Enable Investments in Electric Utility Resilience

In 2019, Sandia National Laboratories contracted Synapse Energy Economics (Synapse) to research the integration of community and electric utility resilience investment planning as part of the Designing Resilient Communities: A Consequence-Based Approach for Grid Investment (DRC) project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis, performance metrics, microgrids, and regulatory mechanisms to promote investments in electric system resilience. This report focuses on regulatory mechanisms to improve resilience. Regulatory mechanisms that improve resilience are approaches that electric utility regulators can use to align utility, customer, and third-party investments with regulatory, ratepayer, community, and other important stakeholder interests and priorities for resilience. Cost-of-service regulation may fail to provide utilities with adequate guidance or incentives regarding community priorities for infrastructure hardening and disaster recovery. The application of other types of regulatory mechanisms to resilience investments can help. This report: characterizes regulatory objective as they apply to resilience; identifies several regulatory mechanisms that are used or can be adapted to improve the resilience of the electric system--including performance-based regulation, integrated planning, tariffs and programs to leverage private investment, alternative lines of business for utilities, enhanced cost recovery, and securitization; provides a case study of each regulatory mechanism; summarizes findings across the case studies; and suggests how these regulatory mechanisms might be improved and applied to resilience moving forward. In this report, we assess the effectiveness of a range of utility regulatory mechanisms at evaluating and prioritizing utility investments in grid resilience. First, we characterize regulatory objectives which underly all regulatory mechanisms. We then describe seven types of regulatory mechanisms that can be used to improve resilience--including performance-based regulation, integrated planning, tariffs and programs to leverage private investment, alternative lines of business for utilities, enhanced cost recovery, and securitization--and provide a case study for each one. We summarize our findings on the extent to which these regulatory mechanisms have supported resilience to date. We conclude with suggestions on how these regulatory mechanisms might be improved and applied to resilience moving forward.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Airport Infrastructure Planning Using Multi-Stage Stochastic Programming

The Athena project, funded by the Department of Energy, has worked to identify the critical infrastructure at Dallas Fort Worth (DFW) Airport which influences mobility between the airport and the surrounding city of Dallas. Using scalable methods that can leverage HPC resources we have developed a multi-stage stochastic infrastructure expansion model for determining parking and curb modifications to the DFW Airport over a 20-year horizon. Additionally, we have explored the impacts of congestion pricing in conjunction with infrastructure modifications. Our multi-stage stochastic model is implemented using the mpi-sppy software and solved in parallel using progressive hedging on the National Renewable Energy Laboratory's HPC system Eagle. In this talk we present results from solving this model at scale.

airport planning↗

High Explosives and Energetics Asset Analysis Tool

The High Explosives and Energetics (HE&E) Asset Analysis Tool is a database and reference for LANL facilities, equipment, staffing and financial information pertinent to the HE&E program. The tool is used for the communication of the current state and investment planning for the program assets. Additional analyses can offer more insights into the dependencies and impacts of the assets within the HE&E portfolio. This tool is developed under collaboration with the HE&E Program Office.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Development of a Beam Halo Monitor

Muons, Inc. proposed improved Residual-Gas luminescent Beam Profile Monitors for Intense Beams by adding novel features including a mirascope, a light collecting device devised in the 16th century by an inventor of the telescope. A modern mirascope consists of 2 paraboloids. Light generated by the beam is collected by the paraboloids and creates a beam image. By placing a lens near the image it is possible to collect almost 100% of the emitted light, up to ten times better than existing fluorescence profilometers. Intense (multi-MW) proton beams pose a challenge for beam profile measurements. Solid-based beam intercepting instrumentation produces unallowable levels of radiation at these high powers. An alternative is to use a zero-or-low mass device such as a residual-gas profile monitor, either through collection of ionization or fluorescence. Fluorescence has an intrinsic advantage over the usual collection of ionized electrons in that it is not affected by the strong and variable electric and magnetic fields created by the beam that can distort profiles and make calibration difficult. For this reason, we proposed the fluorescence technique using the mirascope and other methods to enhance light collection and versatility by modifying the residual gas and its spatial distribution. In Phase I, we designed a mirascope and its electronics for commissioning and beam tests in a proposed Phase II. The design was based on optical simulations done in Phase I, and a physics run plan was developed for optimizing and testing. The Phase II experimental site and program have been planned and our goal is to produce a universal low cost Mirascope Residual-Gas Luminescent Beam Profile Monitor that can replace all other profile monitors currently used in accelerators.

43 PARTICLE ACCELERATORS↗

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗