Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engine qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

NEXT Ion Propulsion System Development Status and Capabilities

NASA s Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to provide future NASA science missions with enhanced mission performance benefit at a low total development cost. The objective of the NEXT project is to advance next generation ion propulsion technology by producing engineering model system components, validating these through qualification-level and integrated system testing, and ensuring preparedness for transitioning to flight system development. As NASA s Evolutionary Xenon Thruster technology program completes advanced development activities, it is advantageous to review the existing technology capabilities of the system under development. This paper describes the NEXT ion propulsion system development status, characteristics and performance. A review of mission analyses results conducted to date using the NEXT system is also provided.

Patterson, Michael J.↗

Developments in Test Facility and Data Networking for the Altitude Test Stand at the John C. Stennis Space Center, MS - A General Overview

May 2007, NASA's Constellation Program selected John C Stennis Space Center (SSC) near Waveland Mississippi as the site to construct an altitude test facility for the developmental and qualification testing of the Ares1 upper stage (US) engine. Test requirements born out of the Ares1 US propulsion system design necessitate exceptional Data Acquisition System (DAS) design solutions that support facility and propellant systems conditioning, test operations control and test data analysis. This paper reviews the new A3 Altitude Test Facility's DAS design requirements for real-time deterministic digital data, DAS technology enhancements, system trades, technology validation activities, and the current status of this system's new architecture. Also to be discussed will be current network technologies to improve data transfer.

Hebert, Phillip W., Sr.↗

Environmental Assurance Program for the Phoenix Mars Mission

The Phoenix Mars mission involves delivering a stationary science lander on to the surface of Mars in the polar region within the latitude band 65 deg N to 72 deg N. Its primary objective is to perform in-situ and remote sensing investigations that will characterize the chemistry of the materials at the local surface, subsurface, and atmosphere. The Phoenix spacecraft was launched on August 4, 2007 and will arrive at Mars in May 2008. The lander includes a suite of seven (7) science instruments. This mission is baselined for up to 90 sols (Martian days) of digging, sampling, and analysis. Operating at the Mars polar region creates a challenging environment for the Phoenix landed subsystems and instruments with Mars surface temperature extremes between -120 deg C to 25 deg C and diurnal thermal cycling in excess of 145 deg C. Some engineering and science hardware inside the lander were qualification tested up to 80 deg C to account for self heating. Furthermore, many of the hardware for this mission were inherited from earlier missions: the lander from the Mars Surveyor Program 2001 (MSP'01) and instruments from the MSP'01 and the Mars Polar Lander. Ensuring all the hardware was properly qualified and flight acceptance tested to meet the environments for this mission required defining and implementing an environmental assurance program that included a detailed heritage review coupled with tailored flight acceptance testing. A heritage review process with defined acceptance success criteria was developed and is presented in this paper together with the lessons learned in its implementation. This paper also provides a detailed description of the environmental assurance program of the Phoenix Mars mission. This program includes assembly/subsystem and system level testing in the areas of dynamics, thermal, and electromagnetic compatibility, as well as venting/pressure, dust, radiation, and meteoroid analyses to meet the challenging environment of this mission.

thermal testing↗

NGHT-1X Pole Cover Erosion Measurements on Xenon and Krypton

Northrop Grumman’s NGHT-1X Hall thruster has completed the Engineering Model development phase and is progressing towards qualification and flight unit build and test. First flight of the NGHT-1X will occur in 2025 on Northrop Grumman’s Mission Extension Pod spacecraft. The NGHT-1X is a state of the art 1 kW-class Hall thruster which implements magnetic shielding to increase thruster lifetime by reducing discharge channel wall erosion. As a result, like other magnetically shielded Hall thrusters, the NGHT-1X exhibits erosion of the front-facing pole covers, which is the primary life-limiting failure mode of the thruster. During the development of the NGHT-1X, several Short Duration Wear Tests were performed to characterize erosion rates and forecast compliance to lifetime requirements in advance of the ongoing full-life Long Duration Wear Test. Erosion rate measurements from four tests at different operating conditions are presented and comparisons made between tests. Two tests were performed in the same background pressure environment at 700 W 300 V and 900 W 350 V throttle conditions, both using xenon propellant. A third test was performed again at 900 W 350 V with xenon propellant, but at a lower background pressure. Lastly, to assess the viability of potential future applications with alternate propellants, a wear test was conducted using krypton propellant at 900 W 250 V, the results of which are presented here. The erosion measurements from each test are compared with one another, and insights are discussed. All xenon wear tests support a thruster lifetime capability in excess of 16,000 hours, or 3.3 MNs at 900 W 350 V, which supports the Mission Extension Pod mission with margin as well as many other potential applications on small- to medium-sized spacecraft.

Hall↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Microstructure & Mechanical Properties of Scaled Thermally Aged LPBF 316H SS Builds

As part of the US Department of Energy’s Advanced Materials and Manufacturing Technologies program’s mission to accelerate qualification of advanced manufacturing pathways for nuclear applications, laser powder bed fusion (LPBF) 316H stainless steel (SS) has been selected as a model system to develop a rapid code case framework. This effort directly addresses the grand challenges of (1)expanding the limited portfolio of materials currently codified for elevated-temperature nuclear structural service under Section III, Division 5of the American Society of Mechanical Engineers’ Boiler and Pressure Vessel Code; and (2) significantly reducing qualification timelines that traditionally exceed a decade. The strategic importance of LPBF 316H lies in its immediate industrial relevance, existing data foundation from wrought 316H, and alignment with ongoing code case development for LPBF 316L.Prior work revealed accelerated precipitation of deleterious secondary phases and reduced creep ductility in as-printed LPBF 316H. Building on that prior research, FY2025activities focused on establishing an understanding of the key failure mechanisms of crept 316H specimens to aid in code case development and on evaluating stress relief (SR) parameters on the high-temperature performance and thermal aging-induced degradation of tensile and fracture behavior in LPBF316H.

36 MATERIALS SCIENCE↗

Microstructure and Mechanical Properties of Scaled Thermally Aged LPBF 316H SS Builds

As part of the US Department of Energy’s Advanced Materials and Manufacturing Technologies program’s mission to accelerate qualification of advanced manufacturing pathways for nuclear applications, laser powder bed fusion (LPBF) 316H stainless steel (SS) has been selected as a model system to develop a rapid code case framework. This effort directly addresses the grand challenges of (1) expanding the limited portfolio of materials currently codified for elevated-temperature nuclear structural service under Section III, Division 5 of the American Society of Mechanical Engineers’ Boiler and Pressure Vessel Code; and (2) significantly reducing qualification timelines that traditionally exceed a decade. The strategic importance of LPBF 316H lies in its immediate industrial relevance, existing data foundation from wrought 316H, and alignment with ongoing code case development for LPBF 316L. Prior work revealed accelerated precipitation of deleterious secondary phases and reduced creep ductility in as-printed LPBF 316H. Building on that prior research, FY 2025 activities focused on establishing an understanding of the key failure mechanisms of crept 316H specimens to aid in code case development and on evaluating stress relief (SR) parameters on the high-temperature performance and thermal aging induced degradation of tensile and fracture behavior in LPBF 316H.

36 MATERIALS SCIENCE↗

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

Monitoring of explosive/pyrotechnic performance.

Utilization of performance monitoring techniques for acceptance, lot qualification, and comparison testing, as well as to provide engineering guidelines for systems design. Test techniques and apparatus have been developed to evaluate the performance of squibs, initiators, gas generating cartridges, detonators, and linear explosives for aerospace applications. A variety of devices has been tested in each of these apparatuses, including the Apollo Standard Initiator, the Apollo End Detonating Cartridge, and the mild detonating fuse and flexible linear shaped charge.

Bement, L. J.↗

Project FIRES. Volume 1: Program Overview and Summary, Phase 1B

Overall performance requirements and evaluation methods for firefighters protective equipment were established and published as the Protective Ensemble Performance Standards (PEPS). Current firefighters protective equipment was tested and evaluated against the PEPS requirements, and the preliminary design of a prototype protective ensemble was performed. In phase 1B, the design of the prototype ensemble was finalized. Prototype ensembles were fabricated and then subjected to a series of qualification tests which were based upon the PEPS requirements. Engineering drawings and purchase specifications were prepared for the new protective ensemble.

Abeles, F. J.↗

Three-Dimensional Magnetic Analysis Technique Developed for Evaluating Stirling Convertor Linear Alternators

The Department of Energy, the Stirling Technology Company (STC), and the NASA Glenn Research Center are developing Stirling convertors for Stirling radioisotope generators to provide electrical power for future NASA deep space missions. STC is developing the 55-We technology demonstration convertor (TDC) under contract to the Department of Energy. The Department of Energy recently named Lockheed Martin as the system integration contractor for the Stirling radioisotope generator development project. Lockheed Martin will develop the Stirling radioisotope generator engineering unit and has contract options to develop the qualification unit and the first flight unit. Glenn s role includes an in-house project to provide convertor, component, and materials testing and evaluation in support of the overall power system development. As a part of this work, Glenn has established an in-house Stirling research laboratory for testing, analyzing, and evaluating Stirling machines. STC has built four 55-We convertors for NASA, and these are being tested at Glenn. A cross-sectional view of the 55-We TDC is shown in the figure. Of critical importance to the successful development of the Stirling convertor for space power applications is the development of a lightweight and highly efficient linear alternator. In support, Glenn has been developing finite element analysis and finite element method tools for performing various linear alternator thermal and electromagnetic analyses and evaluating design configurations. A three-dimensional magnetostatic finite element model of STC's 55-We TDC linear alternator was developed to evaluate the demagnetization fields affecting the alternator magnets. Since the actual linear alternator hardware is symmetric to the quarter section about the axis of motion, only a quarter section of the alternator was modeled. The components modeled included the mover laminations, the neodymium-iron-boron magnets, the stator laminations, and the copper coils. The three-dimensional magnetostatic model was then coupled with a circuit simulator model of the alternator load and convertor controller. The coupled model was then used to generate alternator terminal voltage and current predictions. The predicted voltage and current waveforms agreed well with the experimental data, which tended to validate the accuracy of the coupled model. The model was then used to generate predictions of the demagnetization fields acting on the alternator magnets for the alternator under load. The preliminary model predictions indicate that the highest potential for demagnetization is along the inside surface of the uncovered magnets. The demagnetization field for the uncovered magnets when the mover is positioned at the end of a stroke is higher than it is when the mover is at the position of maximum induced voltage or maximum alternator current. Assuming normal load conditions, the model predicted that the onset of demagnetization is most likely to occur for magnet temperatures above 101 C.

Geng, Steven M.↗

Radioisotope Electric Propulsion (REP): A Near-Term Approach to Nuclear Propulsion

Studies over the last decade have shown radioisotope-based nuclear electric propulsion to be enhancing and, in some cases, enabling for many potential robotic science missions. Also known as radioisotope electric propulsion (REP), the technology offers the performance advantages of traditional reactor-powered electric propulsion (i.e., high specific impulse propulsion at large distances from the Sun), but with much smaller, affordable spacecraft. Future use of REP requires development of radioisotope power sources with system specific powers well above that of current systems. The US Department of Energy and NASA have developed an advanced Stirling radioisotope generator (ASRG) engineering unit, which was subjected to rigorous flight qualification-level tests in 2008, and began extended lifetime testing later that year. This advancement, along with recent work on small ion thrusters and life extension technology for Hall thrusters, could enable missions using REP sometime during the next decade.

Schmidt, George R.↗

NASA Propulsion Concept Studies and Risk Reduction Activities for Resource Prospector Lander

The trade study has led to the selection of propulsion concept with the lowest cost and net lowest risk -Government-owned, flight qualified components -Meet mission requirements although the configuration is not optimized. Risk reduction activities have provided an opportunity -Implement design improvements while development with the early-test approach. -Gain knowledge on the operation and identify operation limit -Data to anchor analytical models for future flight designs; The propulsion system cold flow tests series have provided valuable data for future design. -The pressure surge from the system priming and waterhammer within component operation limits. -Enable to optimize the ullage volume to reduce the propellant tank mass; RS-34 hot fire tests have successfully demonstrated of using the engines for the RP mission -No degradation of performance due to extended storage life of the hardware. -Enable to operate the engine for RP flight mission scenarios, outside of the qualification regime. -Provide extended data for the thermal and GNC designs. Significant progress has been made on NASA propulsion concept design and risk reductions for Resource Prospector lander.

Trinh, Huu P.↗

Development Of 12 Kw Hall Thrusters for Nasa Lunar Gateway Power And Propulsion Element

NASA is embarking on a new and exciting era of human exploration to the Moon and its vicinity. As part of the Artemis program, NASA is developing the lunar Gateway, an orbiting platform in Near Rectilinear Halo Orbit (NRHO) about the Moon. The first two elements of the Gateway will be launched in 2024 and will be transferred from a high Earth orbit to the NRHO via the use of Solar Electric Propulsion (SEP). The SEP system is located on the Power and Propulsion Element (PPE) which will provide up to 60 kW of power. Aerojet Rocketdyne is developing the 12 kW flight Hall thrusters to be used for transferring the PPE and the Habitat and Logistics Outpost (HALO) module to NRHO. Work is continuing on the development testing, and these results will be described in the paper. The project has also recently completed its critical design review and is transitioning to the fabrication of the three flight thrusters. The 12 kW Hall thrusters are being developed under the NASA Advanced Electric Propulsion System (AEPS) program. As part of the AEPS program, AR built two Engineering Test Unit (ETU) Hall thrusters based on the NASA HERMeS engine and conducted a series of tests to validate the design. One series of tests focused on environments and functional testing, while the other series was mainly focused on long duration test blocks. Results from these tests were used to compare with NASA data from the HERMeS thruster. The comparison of the test results showed no change to the critical performance and lifetime parameters, which enabled the next phase of the program to proceed. Currently testing is continuing on the Engineering Development Units (EDU) as part of the flight qualification activities. The successful completion of the CDR serves as the starting point for the flight thruster fabrication, which is now underway to support the launch of the Gateway modules in 2024. The development and qualification of the AEPS 12 kW Hall thrusters is proceeding well. As the program completes CDR and transitions into flight builds of the three 12 kW Hall thrusters that will be used to transfer the combined PPE and HALO stack to the NRHO, the results of the development testing are reviewed in this presentation, and a status of the program and future plans is provided. The launch of the two Gateway modules and the transfer of this large payload to cislunar orbit will mark a significant milestone in electric propulsion, as it will demonstrate the ability of SEP to transfer very large payloads over great distances. This establishes the precedent that could lead to cargo transfers from the Earth to the Moon or even to Mars using SEP.

Hall thrusters↗

Effects of Geometric Discontinuities on Creep Behavior of Alloy 617

Due to the excellent long-term high-temperature performance of Alloy 617, the Alloy has been identified as the primary structural material for the intermediate heat exchanger of the Very High Temperature Reactor (VHTR). Both the base and welded alloy has been qualified to be used up to 950 °C up to 100,000 hours by the American Society of Mechanical Engineer (ASME) Boiler and Pressure Vessel Code (BPVC). The qualification properties of the material were exclusively determined by uniaxial creep tests. The components may, however, experience multiaxial stress conditions in service due to the reactor geometry. This study used notched creep tests to investigate the effect of geometric discontinuities on creep behavior of both the base and welded Alloy 617. The V-notch tests reveal that the geometric discontinuities do not reduce the creep rupture live under high and intermediate stress conditions. The U-notch tests show that a larger radius notch behave in a similar way as a straight gauge section of a uniaxial test. The creep rupture live of the welded alloy was slightly longer than the base metal.

36 - MATERIALS SCIENCE↗