Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UTILITY INTERCONNECTIONS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

DOE/EPRI Electricity Storage Handbook in Collaboration with NRECA.

The Electricity Storage Handbook (Handbook) is a how - to guide for utility and rural cooperative engineers, planners, and decision makers to plan and implement energy storage projects. The Handbook also serves as an information resource for investors and venture capitalists, providing the latest developments in technologies and tools to guide their evaluation s of energy storage opportunities. It includes a comprehensive database of the cost of current storage systems in a wide variety of electric utility and customer services, along with interconnection schematics. A list of significant past and present energy storage projects is provided for a practical perspective . This Handbook, jointly sponsored by the U.S. Department of Energy and the Electric Power Research Institute in collaboration with the National Rural Electric Cooperative Association, is published in electronic form at www.sandia.gov/ess. This Handbook is best viewed online.

25 ENERGY STORAGE↗

Implications of Model Structure and Detail for Utility Planning. Scenario Case Studies using the Resource Planning Model

We examine how model investment decisions change under different model configurations and assumptions related to renewable capacity credit, the inclusion or exclusion of operating reserves, dispatch period sampling, transmission power flow modeling, renewable spur line costs, and the ability of a planning region to import and export power. For all modeled scenarios, we find that under market conditions where new renewable deployment is predominantly driven by renewable portfolio standards, model representations of wind and solar capacity credit and interactions between balancing areas are most influential in avoiding model investments in excess thermal capacity. We also compare computation time between configurations to evaluate tradeoffs between computational burden and model accuracy. From this analysis, we find that certain advanced dispatch representations (e.g., DC optimal power flow) can have dramatic adverse effects on computation time but can be largely inconsequential to model investment outcomes, at least at the renewable penetration levels modeled. Finally, we find that certain underappreciated aspects of new capacity investment decisions and model representations thereof, such as spur lines for new renewable capacity, can influence model outcomes particularly in the renewable technology and location chosen by the model. Though this analysis is not comprehensive and results are specific to the model region, input assumptions, and optimization-modeling framework employed, the findings are intended to provide a guide for model improvement opportunities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DOE/EPRI Electricity Storage Handbook in Collaboration with NRECA

The Electricity Storage Handbook (Handbook) is a how-to guide for utility and rural cooperative engineers, planners, and decision makers to plan and implement energy storage projects. The Handbook also serves as an information resource for investors and venture capitalists, providing the latest developments in technologies and tools to guide their evaluations of energy storage opportunities. It includes a comprehensive database of the cost of current storage systems in a wide variety of electric utility and customer services, along with interconnection schematics. A list of significant past and present energy storage projects is provided for a practical perspective. This Handbook, jointly sponsored by the U.S. Department of Energy and the Electric Power Research Institute in collaboration with the National Rural Electric Cooperative Association, is published in electronic form at www.sandia.gov/ess.

25 ENERGY STORAGE↗

2022 Peer Review Project Summary: Advanced Protection for Microgrids and DER in Secondary Networks and Meshed Distribution Systems

Although there are increasing numbers of distributed energy resources (DERs) and microgrids being deployed, current IEEE and utility standards generally strictly limit their interconnection inside secondary networks. Secondary networks are low-voltage meshed (non-radial) distribution systems that create redundancy in the path from the main grid source to each load. This redundancy provides a high level of immunity to disruptions in the distribution system, and thus extremely high reliability of electric power service. There are two main types of secondary networks, called grid and spot secondary networks, both of which are used worldwide. In the future, primary networks in distribution systems that might include looped or meshed distribution systems at the primary-voltage (mediumvoltage) level may also become common as a means for improving distribution reliability and resilience. The objective of this multiyear project is to increase the adoption of microgrids in secondary networks and meshed distribution systems by developing novel protection schemes that allow for safe reliable operation of DERs in secondary networks. We will address these challenges by working with the appropriate stakeholders of secondary network operators, protection vendors, and standards committee. The outcomes of this project include: a) development and/or demonstration of candidate methods for enabling protection of secondary networks containing high levels of DER; b) development of modeling and testing tools for protection systems designed for use with secondary networks including DERs; and c) development of new industrial partnerships to facilitate widespread results dissemination and eventual commercialization of results as appropriate.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Protection for Microgrids and DER in Secondary Networks and Meshed Distribution Systems

Although there are increasing numbers of distributed energy resources (DERs) and microgrids being deployed, current IEEE and utility standards generally strictly limit their interconnection inside secondary networks. Secondary networks are low-voltage meshed (non-radial) distribution systems that create redundancy in the path from the main grid source to each load. This redundancy provides a high level of immunity to disruptions in the distribution system, and thus extremely high reliability of electric power service. There are two main types of secondary networks, called grid and spot secondary networks, both of which are used worldwide. In the future, primary networks in distribution systems that might include looped or meshed distribution systems at the primary-voltage (medium-voltage) level may also become common as a means for improving distribution reliability and resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report on Transmission Cost Allocation for RTOs and Others (Presentation)

Presented at the MARC 2011 Annual Conference, 6 June 2011, Rapid City, South Dakota. This presentation provides an overview of the latest research findings and policy developments pertaining to cost allocation and new variable generation resources on the power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Power-Hardware-in-the-Loop Evaluation of Inverter-Based Resources (IBRs)

Power-hardware-in-the-loop evaluation of IBRs has become more and more important as it provides reliable testing results to investigate the real responses of inverters with interconnected systems. A successful laboratory PHIL testing gives confidence of the hardware system to be deployed and de-risk technology integration prior to field deployment. So far, there are two important applications for PHIL evaluation: (1) test stability and functionality of large utility inverters into the system when it interconnects to the distribution systems/microgrids; and (2) test the collective grid service that inverters can provide to the grid. For the first application, the PHIL evaluation has high requirements for the stability and accuracy of the PHIL interface as the close-loop in digital real time simulator (DRTS) should replicate the actual current and voltage dynamics in the inverter. This is challenging because of the delays, sensing errors, nonlinearities of inverters, and hardware bandwidth limitations of the elements in the HIL loop. For the second application, multiple inverters will be tested resulting in multiple PCCs, which naturally causes competing dynamics and oscillations among hardware inverters if traditional PHIL interface is used. Therefore, new PHIL interface should be developed to compromise between stability and accuracy and represent the dispatched grid services for the hardware inverters. In this presentation, we will share our latest work in developing PHIL interface in these two applications to address the two key challenges.

DERMS↗

Updating Technical Screens for PV Interconnection: Preprint

Solar photovoltaics (PV) is the dominant type of distributed generation (DG) technology interconnected to electric distribution systems in the United States, and deployment of PV systems continues to increase rapidly. Considering the rapid growth and widespread deployment of PV systems in United States electric distribution grids, it is important that interconnection procedures be as streamlinedas possible to avoid unnecessary interconnection studies, costs, and delays. Because many PV interconnection applications involve high penetration scenarios, the process needs to allow for a sufficiently rigorous technical evaluation to identify and address possible system impacts. Existing interconnection procedures are designed to balance the need for efficiency and technical rigor for all DG.However, there is an implicit expectation that those procedures will be updated over time in order to remain relevant with respect to evolving standards, technology, and practical experience. Modifications to interconnection screens and procedures must focus on maintaining or improving safety and reliability, as well as accurately allocating costs and improving expediency of the interconnectionprocess. This paper evaluates the origins and usefulness of the capacity penetration screen, offers potential short-term solutions which could effectively allow fast-track interconnection to many PV system applications, and considers longer-term solutions for increasing PV deployment levels in a safe and reliable manner while reducing or eliminating the emphasis on the penetration screen.

14 SOLAR ENERGY↗

Status Quo in V2G/V2H: Closer Look at CA's Progress

This presentation will guide participants through the progress of V2G interconnection, using California's regulatory development as a case study. The focus will be on utility-side considerations rather than EVs themselves, and as such, EV-EVSE interactions will not be covered. Since V2G DC is already accommodated within the existing grid interconnection process, the majority of the discussion will center on V2G AC, particularly the regulatory and standards development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Alternatives to the 15% Rule

The third solicitation of the California Solar Initiative (CSI) Research, Development, Demonstration and Deployment (RD&D) Program established by the California Public Utility Commission (CPUC) is supporting the Electric Power Research Institute (EPRI), National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) with collaboration from Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E), in research to improve the Utility Application Review and Approval process for interconnecting distributed energy resources to the distribution system. Currently this process is the most time - consuming of any step on the path to generating power on the distribution system. This CSI RD&D solicitation three project has completed the tasks of collecting data from the three utilities, clustering feeder characteristic data to attain representative feeders, detailed modeling of 16 representative feeders, analysis of PV impacts to those feeders, refinement of current screening processes, and validation of those suggested refinements. In this report each task is summarized to produce a final summary of all components of the overall project.

Broderick, Robert Joseph↗

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Peak Reliability Synchrophasor Program

Realizing the potential of high fidelity, time-synchronized, power system data will build on the existing infrastructure made available by the Western Interconnection Synchrophasor Program (WISP). This project will focus on fully utilizing the data made available by this infrastructure to ensure reliable and efficient operation of the Western Interconnection. The Recipient's objective is to advance the deployment of production-grade software applications that rely on synchrophasor data to enhance the reliability or improve the economic efficiency of bulk power system planning and operations.

99 GENERAL AND MISCELLANEOUS↗

Utility-Scale Solar 2016: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze not just installed project prices, but also operating costs, capacity factors, and power purchase agreement ("PPA") prices from a large sample of utility-scale PV and CSP projects throughout the United States. Highlights from this year's edition include the following: Installation Trends: The use of solar tracking devices dominated 2016 installations, at nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the Southwest, the median long-term average insolation level at newly built project sites declined again in 2016. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio has stabilized in 2016 at 1.3 for both tracking and fixed-tilt projects. Installed Prices: Median installed PV project prices within a sizable sample have fallen by two-thirds since the 2007-2009 period, to $2.2/WAC (or $1.7/WDC) for projects completed in 2016. The lowest 20th percentile of projects within our 2016 sample were priced at or below $2.0/WAC, with the lowest-priced projects around $1.5/WAC. Overall price dispersion across the entire sample and across geographic regions decreased significantly in 2016. Operation and Maintenance (“O&M”) Costs: What limited empirical O&M cost data are publicly available suggest that PV O&M costs were in the neighborhood of $18/kWAC-year, or $8/MWh, in 2016. These numbers include only those costs incurred to directly operate and maintain the generating plant. Capacity Factors: The cumulative net AC capacity factors of individual PV projects range widely, from 15.4% to 35.5%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed-tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010- to 2013-vintage projects, where they’ve remained fairly steady among both 2014- and 2015-vintage projects as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. Meanwhile, several of the newer CSP projects in the United States are struggling to match long-term performance expectations. PPA Prices: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time. Most recent PPAs in our sample are priced at or below $50/MWh levelized, with a few priced as aggressively as ~$30/MWh. Though impressive in pace and scale, these falling PPA prices have been offset to some degree by declining wholesale market value within high penetration markets like California, where in 2016 a MWh of solar generation was worth just 83% of a MWh of flat, round-the-clock generation. At the end of 2016, there were at least 121.4 GW of utility-scale solar power capacity within the interconnection queues across the nation. The growth within these queues is widely distributed across all regions of the country: California and the Southeast each account for 23% of the 83.3 GW of solar that first entered the queues in 2016, followed by the Northeast (17%), the Southwest (16%), the Central region (12%), Texas (6%) and the Northwest (3%). The widening geographic distribution of solar projects is a clear sign that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Understanding Adoption of a Key Soft Cost Reduction Strategy: Modeling Administrative Choices Regarding Streamlined Solar Permitting (Final Technical Report)

In the U.S., the process by which residential rooftop solar photovoltaic (PV) system installations are permitted and inspected by an “authority having jurisdiction” (AHJ) and interconnected to the grid varies across the country. As the U.S. has roughly 23,000 AHJs and 3,000 utilities with varying degrees of local autonomy, permitting, inspection, and interconnection (PI&I) heterogeneity represents a significant “soft cost” barrier to the growth of the residential solar PV market. Burkhardt et al. (2015), for example, finds that variations in local permitting procedures alone can lead to differences in average residential PV prices of approximately ${$}$0.14-${$}$0.18/W. When the authors considered jurisdictional variation in permitting plus regulatory procedures, that price differential grew to ${$}$0.64-${$}$0.93/W between the least-favorable and most-favorable jurisdictions. The objective of this project was to determine suites of PI&I reforms that fit the preferences of AHJs and utilities nationwide, as mediated through the preferences of PV installers, with the hoped-for impact of significantly improving the consistency of PI&I for solar PV across the U.S. To accomplish this objective, the project team set out to design and implement survey instruments with embedded discrete choice experiments (DCEs) that used individual PI&I reforms as attributes, with levels informed by a detailed understanding of the PI&I reforms. The analysis of the surveys was to include both defined and latent class analysis of the survey results, in order to identify different sets of AHJs and utilities that would prefer different “mass customized” SSP practice combinations. Note that this project would also have advanced the social science by applying well-established choice analysis techniques to the novel setting of public administration.

14 SOLAR ENERGY↗

Estimation, Minimization, and Validation of Commutation Loop Inductance for a 135-kW SiC EV Traction Inverter

With growing interests in low inductance SiC based power module packaging, it is vital to focus on system level design aspects to facilitate easy integration of the modules and reap system level benefits. To effectively utilize the low inductance modules, busbar and interconnects should also be designed with low stray inductances. A wholistic investigation of the flux path and flux cancellations in the module-busbar assembly which as differentially coupled series inductors is thus mandatory for a system level design. This work presents a busbar design which can be adopted to effectively integrate the CREE’s low inductance 1.2 kV/1.7 kV SiC power modules. The paper also proposes a novel measurement technique to measure the inductance of the modulebusbar assembly as a whole rather than deducing it from individual components. The inductance of the overall commutation loop of the inverter which encompasses the SiC power module, interconnects and PCB busbar have been estimated using finite element analysis (FEA). Furthermore, insights gained from FEA provided the guidelines to decide on the placement of the decoupling capacitors in the busbar to minimize the overall commutation loop inductance from 12.8 nH to 7.4 nH which resulted in significant reduction in the device voltage overshoot. The simulation results have been validated through measurements using an impedance analyzer with less than 5% difference between extracted loop inductance from FEA and measurements. The bus bar design study and the measurement technique discussed in this paper, can be easily extended to other power module packages. Finally, the 135 kW inverter has been compared to a similar highpower inverter utilizing a laminated busbar to highlight the performance of the former.

42 ENGINEERING↗

Design and Analysis of a Region-Wide Remotely Controllable Electrical Lock-Out System

Electric utilities have a main responsibility to protect the lives and safety of their workers when they are working on low-, medium-, and high-voltage power lines and distribution circuits. With the anticipated widespread deployment of smart grids, a secure and highly reliable means of maintaining isolation of customer-owned distributed generation (DG) from the affected distribution circuits during maintenance is necessary to provide a fully de-energized work area, ensure utility personnel safety, and prevent hazards that can lead to accidents such as accidental electrocution from unanticipated power sources. Some circuits are serviced while energized (live line work) while others are de-energized for maintenance. For servicing de-energized circuits and equipment, lock-out tag-out (LOTO) programs provide a verifiable procedure for ensuring that circuit breakers are locked in the off state and tagged to indicate that status to operational personnel so that the lines will be checked for voltage to verify they are de-energized. The de-energized area is isolated from any energized sources, which traditionally are the substations. This procedure works well when all power sources and their interconnections are known armed with this knowledge, utility personnel can determine the appropriate circuits to de-energize for isolating the target line or equipment. However, with customer-owned DG tied into the grid, the risk of inadvertently reenergizing a circuit increases because circuit connections may not be adequately documented and are not under the direct control of the local utility. Thus, the active device may not be properly de-energized or isolated from the work area. Further, a remote means of de-energizing and locking out energized devices provides an opportunity for greatly reduced safety risk to utility personnel compared to manual operations. In this paper, we present a remotely controllable LOTO system that allows individual workers to determine the configuration and status of electrical system circuits and permit them to lock out customer-owned DG devices for safety purposes using a highly secure and ultra-reliable radio signal. The system consists of: (1) individual personal lockout devices, (2) lockout communications and logic module at circuit breakers, which are located at all DG devices, and (3) a database and configuration control process located at the utility operations center. The lockout system is a close permissive, i.e., loss of control power or communications will cause the circuit breaker to open. Once the DG device is tripped open, a visual means will provide confirmation of a loss of voltage and current that verifies the disconnected status of the DG. Further the utility personnel will be able to place their own lock electronically on the system to ensure a lockout functionally. The proposed LOTO system provides enhanced worker safety and protection against unintended energized lines when DG is present. The main approaches and challenges encountered through designing the proposed region-wide LOTO system are discussed in this paper. These approaches include: (1) evaluating the reliability of the proposed approach under N-modular redundancy with voter/spares configurations and (2) conducting a system level risk assessment study using the failure modes and effects analysis (FMEA) technique to identify and rank failure modes by probability of occurrence, probability of detection, and severity of consequences. This ranking allows a cost benefits analysis to be conducted such that dollars and efforts will be applied to the failures that provide greatest incremental gains in system capability (resilience, survivability, security, reliability, availability, etc.) per dollar spent whether capital, operations, or investment. Several simulation scenarios and their results are presented to demonstrate the viability of these approaches.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗