Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “US DOE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Non-Electric Applications of Generation IV Reactors: Accelerating Economy-Wide Decarbonization via Nuclear Energy

This presentation covers the role of nuclear energy in support net-zero solutions, highlighting work within the US DOE Integrated Energy Systems, Light Water Reactor Sustainability, and Hydrogen at Scale programs. The discussion will also introduce the recently-establishing Generation-IV International Forum (GIF) interim task force on non-electric applications of nuclear heat (NEaNH-iTF). This work is presented within a special invited webinar organized by the GIF Education and Training Working Group and the International Atomic Energy Agency.

08 HYDROGEN↗

Measurement of Convective Heat Transfer Coefficients with Supercritical CO2 in Novel Additively Manufactured Helically Patterned Pin Fin Tubes Using the Wilson Plot Technique

This paper describes the measurement of convective heat transfer coefficients and friction factors for sCO2 flowing in pin-fin patterned pipes in the Heat Exchange and Experimental Testing (HEET) facility at the US DoE’s National Energy Technology Laboratory (NETL) in Morgantown, WV. The measurement procedures in the HEET rig were validated by conducting benchmark tests with smooth stainless-steel tube and comparing the results with published correlations for Nusselt number (Nu) and friction factor. Over typical Reynolds number range in sCO2, the measured Nu and friction factors were within 7% of classical correlations for smooth tube flow.The candidate pin fin patterned pipes were additively manufactured (AM) at the Oak Ridge National Laboratory. The pins were circular or elliptical in cross-section. Pin length to diameter aspect ratios were 1.33 and 2, while the pin diameter to tube diameter ratio was 0.188 and 0.125. Tests were performed for ReD varying from 6.9×104 to 2.2×105 and at conditions equivalent to the low pressure outlet (8.69 MPa, 361 K) of the low temperature recuperator (LTR) in an indirect sCO2 power cycle. The Wilson plot technique was utilized to measure the bulk heat transfer coefficients.For the better performing design (tube A, pin length to tube diameter ratio: 1.33, pin diameter to tube diameter ratio: 0.188), the local heat transfer coefficient increased by 112% relative to the Dittus-Boelter correlation at the LTR low pressure outlet. This corresponded to a 282% increase in the product of the heat transfer coefficient and the surface area. Large pressure drops across the test articles were observed.

Searle, Matthew↗

Pressure safety approach for PIP-II cryogenic distribution system and cryomodules

The Proton Improvement Plan-II (PIP-II) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beam for neutrino production. The linac consists of a total of twenty-three (23) cryomodules of five (5) different types. Cooling is required at 2K, 5K and 40K. The Cryogenic Distribution System (CDS) consists of a Distribution Valve Box, ~285 m of cryogenic transfer line, modular Bayonet Cans to interface with cryomodules, and a Turnaround Can. The cryogenic system must provide protection from over-pressure by sizing pressure relief devices for all volumes and process line circuits. The cryomodule cavity circuits have dual pressure ratings, 4.1 bara when cold and 2.05 bara when warm (T>80K). Worst case relieving cases will be identified. The methods for determining heat flux will be presented. For the relieving occurring in the linac tunnel, flow must vent to outside to avoid an oxygen deficiency hazard. Also, we will present vacuum vessel relief sizing to protect the cryogenic distribution system vacuum shells from over pressure during an internal line rupture. The project is funded by US DOE Offices of Science, High Energy Physics.

43 PARTICLE ACCELERATORS↗

CHALLENGES IN THE DEVELOPMENT OF THE ELECTROREFINING PROCESS AT Y-12

In order to ensure future capabilities of the Y-12 site as older buildings retire, a new process was developed, the Metal Purification Process. The purpose of this new process is to provide a simpler and more efficient uranium metal purification that the previous multi-staged, complex chemical processes. The basis for this technology currently exists in the US DOE complex, but it has not been utilized on a large scale for uranium at higher enrichments. The system requires larger-geometry vessels and furnaces in order to meet the through-put requirements. The crux of the process is the electrorefining cell, consisting of several concentric liners and an unfavorable geometry cylindrical crucible. Within the crucible, a molten Li-CL-KCL-UCL3 salt electrolyte is present. ‘Dirty’ metal is placed into a loading basket and loaded into an electrorefining cell. Here, the metal reacts into the molten salt within the cell to form UCL3, while ‘clean’ metal simultaneously plates out from the salt electrolyte in the form of metal dendrites. These dendrites are then collected and removed from the cell. After removal from the cell, the dendrites are taken to a furnace to remove adhered salts. Then, the salt-free dendrites are moved to a separate furnace for consolidation into the final product form. The development of the Criticality Safety Evaluation for this complex system brought with it many NCS Challenges and lessons learned. These challenges include: design decisions for ensuring subcriticalty in the electrorefining cell during abnormal conditions, the interface of the main glovebox system with auxiliary systems such as the purification system and designated storage, implementation of mass tracking, and concerns from production and operation regarding the movement of material within the system.

36 MATERIALS SCIENCE↗

Panel Session 108: Technology Transfer and Commercialization: Innovative Solutions for Global Opportunities

This panel focus was to build the connection between innovative solutions and the various industries looking for more efficient methods, products, and processes in Tech Transfer and Commercialization. This panel had interest across the entire conference base, whether they are encountering a challenge, introducing an innovative solution, or are the host that is trying to get from a pure research / Research, Development, Demonstration, Testing, and Evaluation solution to one that is commercially viable and robust enough for long term and/or high risk deployment scenarios and which will support greater chance of success and positive outcomes. Panelists with presentations: Practical, Successful Technology Transfer (Laurie Judd); Technology Needs for Clean-up of Mercury Contamination on the Oak Ridge Reservation (Renee Echols); US DOE Office of Technology Transitions (Kyle Wiley); Technology Transfer in Support of Delivering Clean-up Missions (Kristan Schruder); Mission to Market (J. Chris Ford)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential for Transport of Cesium as Bio-colloids in a High Ionic Strength System

The Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for long-term disposal of transuranic, radioactive waste that is a byproduct from the nation's nuclear defense program. Most likely release scenario → human intrusion (potentially through drilling) (US DOE 1995; 1996). Brine may proceed through the Rustler formation (the most transmissive layer) (Perkins et al., 1999). There is a need to investigate halophilic microbes including their mobility in the Rustler formation and the potential for enhancing transport of cesium as a bio-colloid. Objectives: To quantify the change in mobility of Cs by interaction with microbes (Chromohalobacter) that may be present near Waste Isolation Pilot Plant. What is Chromohalobacter?: a halophilic microbe, isolated from near the WIPP site, able to thrive in the high salt concentrations relevant to the repository. Does the microbe growth phase effect uptake of Cs? Experiments conducted with actively growing and stationary phase Chromohalobacter. Uptake may differ if Cs{sup +} is mistaken for K{sup +} in an actively growing (Log) phase versus stationary phase microbes (not actively reproducing). Materials: 1'' Teflon column packed with 1 gram of dolomite [355-500 μm, CaMg(CO{sub 3}){sub 2}] connected to a syringe pump and fraction collector via Teflon tubing. Chromohalobacter (100 million cells/mL) and dolomite collected near the WIPP. Synthetic brine - 15% NaCl (w/v ∼2.78 M) + 3 mM NaHCO{sub 3}. Methodology: Negative Control 5,000 ppb Cs initially injected into mini-columns with brine. Injection solution was then switched to only brine. Cs Experiments with Stationary Phase Chromo: Set 1: Viable stationary Chromo injected into minicolumns after reaction with 200 ppb Cs. Injection solution was then switched to only brine (without Cs or microbes). Set 2: Stressed stationary Chromo initially injected into mini-columns after reaction with 200 ppb Cs. Then, switched to brine only. Cs Experiments with Log phase Chromo: Set 1: Chromo injected into mini-columns after reaction with 5,000 ppb Cs. Injection then switched to only brine (without Cs or microbes). Set 2: Chromo grown with 5,000 ppb Cs and spiked with additional Cs before injection into columns. Preliminary Conclusions: Cs was not taken up or mobilized by Chromohalobacter in the actively growing or stationary phases or under stressed conditions. Competition may have occurred between Cs and K{sup +} at lower ionic strength, significantly greater concentrations of K{sup +} were present. Results suggest that Chromohalobacter can selectively uptake K{sup +} in the presence of Cs{sup +}. Future Research: K{sup +} and Cs{sup +} uptake will be monitored at high ionic strength in K{sup +} depleted media to consider uptake of Cs in the absence of K.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097A - Panel: Accomplishments and Update of the East Tennessee Technology Park in Oak Ridge, TN (1/4) (R1.16a)

This panel was deferred until 2021. The session was designed to highlight and celebrate the accomplishment of Vision 2020 at US DoE's East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Vision 2020 is the overarching strategy and guidance that have formed the foundation of success in closing one of the largest cleanup site in the DOE Complex. The session was supposed to feature representatives from the DOE Oak Ridge Office of Environmental Management (OREM) and its contractor, UCOR, in exploring the partnerships and performance excellence that have made the difference in achieving success. OREM's Vision 2020 is a collaboration with entities that have made a difference in its success: economic developers, workforce developers, the University of Tennessee, and community partners. The vigorous Oak Ridge small business contracting community has also been instrumental in helping achieve success. This session plans to celebrate the entire process, its numerous players, and the spirit of accomplishment as the Oak Ridge community comes to realize the promise of 30 years of continuous cleanup excellence. This session integrated with panel sessions 97B, 97C and 97D. Panelists with presentations: Beyond Cleanup: Achieving Risk Reduction through Partnerships and Performance Excellence (Kenneth Rueter); Strategic Approach to Achieve End States at the East Tennessee Technology Park (Jay Mullis)

61 RADIATION PROTECTION AND DOSIMETRY↗

Current TRISO Fuel Performance Capabilities and Considerations for Expanded Operational Envelopes

Current TRISO Fuel Performance Capabilities and Considerations for Expanded Operational Envelopes. US-DOE TRISO Fuel Development, AGR Fuel Design and Performance Requirements, AGR Program Fuel Irradiations, UCO Fuel Performance Evaluation Results, Performance Limiting Phenomena, Coated-Particle-Fueled Reactor Concepts and Fuel Designs, Expanded Fuel Performance Envelope, and Accelerated Fuel Qualification.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Single Primary Heat Extraction and Removal Emulator (SPHERE) Long Duration Testing

For the development of heat-pipe cooled microreactors, it is crucial to thoroughly understand the characteristics and functioning of heat pipes across a wide spectrum of operating conditions. Passive heat removal and its long-term performance stability are critical factors in this context. Enhanced experimental data is vital for evaluating the operational lifespan of alkali metal heat pipes. Idaho National Laboratory (INL) has successfully conducted an extended duration test on a high-performance sodium-filled heat pipe, closely monitoring the axial temperature profile, power supplied by the heaters, and heat removed by a gas-gap calorimeter. The results from this testing provide valuable data that are instrumental in supporting heat pipe validation efforts. Specifically, this data aids in the development and validation of Sockeye, the Multiphysics Object-Oriented Simulation Environment (MOOSE) tool under the US-DOE NEAMS program designed for heat pipe modeling. By comparing experimental results with Sockeye’s predictions, the tool's accuracy and reliability can be assessed and improved, thereby enhancing its capability to simulate heat pipe operations under various conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Measurement of the muon neutrino charged-current mesonless cross section in the NOvA near detector

NOvA is a long-baseline accelerator neutrino experiment at Fermilab. Its physics goals include precision neutrino oscillation measurements, neutrino interaction cross-section measurements and beyond Standard Model explorations. We present a measurement of muon neutrino charged-current cross section with zero mesons in the final state at the NOvA near detector. This measurement is performed as a function of the kinematics of the final state muon. Our chosen interaction channel is especially sensitive to quasielastic and meson exchange current interactions and it provides handles for constraining the cross section systematic uncertainties in oscillation analyses in present and future experiments. For particle identification, we use a convolutional neural network (CNN) trained on individual particles simulated in the NOvA Near detector. This allows us to select the desired signal while reducing the potential bias from neutrino interaction modeling. We study strategies for constraining the remaining charged-pion background via Michel electron information in a template fitting approach. The main experimental result is a two-dimensional differential cross section as a function of final-state muon kinetic energy and polar angle. The parameters of this measurement, including binning and unfolding, were optimized to reduce the expected systematic uncertainty in the total cross section. The final result shows good agreement with the main GENIE-based simulation framework that was independently fine-tuned in NOvA. We finally propose improvements and subsequent steps that build on this analysis and further dissect the final states of neutrino interactions. This work has been supported by US DOE grant DE-SC0015684.

Sánchez Falero, Sebastián Jesús [Iowa State U.]↗

From Subsurface to System: Offshore CCS Development for the Northeastern U.S. Atlantic Shelf

This study evaluated offshore carbon sequestration potential and infrastructure design along the mid-north Atlantic outer continental shelf, addressing the limited onshore storage options in the northeastern U.S. The objective was to define viable CCS pathways by integrating geological characterization, reservoir modeling, and system-level engineering for decarbonizing regional industrial sources. The work was conducted under US DOE grant FE0032407 for the Regional Initiatives and builds on a previous prospective resources assessment project by Battelle.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pilot-Scale Modular Research Facility for Acidic Water Pollution Cleanup and Domestic Production of Critical Minerals for National Security

A recent study by Penn State researchers revealed that Pennsylvania AMD streams originate from abandoned mines, with coal refuse piles of the lower Kittanning coal seam containing the most valuable heavy rare earth elements. Penn State has developed a three-stage process to recover these critical minerals, tested it for proof of concept, and secured a patent. Funded by the US DOE, a modular pilot-scale research and development unit has been designed and built to process 1,000 gallons per day of AMD from a site managed by the Pennsylvania Department of Environmental Protection (PA DEP). The system will selectively recover iron, aluminum, rare earth elements, and cobalt-nickel-manganese concentrates from AMD, followed by a proprietary downstream purification process. These operations aim to produce concentrates of critical minerals while treating acid mine drainage to meet environmental standards and evaluate different feedstocks. This presentation will describe the design, operation, and innovations of the proposed process and pilot facility, emphasizing its role in promoting sustainable recovery of critical minerals from legacy waste streams.

Pisupati, Sarma V [Center for Critical Minerals, T↗

Assessing VQLS for Fluid Dynamics on a Hybrid Quantum-HPC Stack

Recent advances in quantum linear solvers offer a promising direction for accelerating extreme scientific computations such as fluid dynamics. However, the deep and complex circuits required by many quantum algorithms limit their practical use on current quantum hardware. The Variational Quantum Linear Solver (VQLS) presents a viable alternative for near-term quantum devices (NISQ), and initial efforts have explored its application to select fluid dynamics problems. In this work, we evaluate the use of VQLS for canonical fluid dynamics problems, aiming to identify pathways for generalizing its implementation across a broader class of systems. We analyze the impact of various circuit ansatz and classical optimizers on solution quality and convergence behavior. Furthermore, we assess the algorithm's feasibility within a hybrid quantum–high-performance computing (HPC) framework by porting it to QFw, a state-of-the-art quantum-HPC software stack. 11This manuscript has been authored by UT-Battelle, LLC, under contract DE-AC05-00OR22725 with the US Department of Energy (DOE). The US government retains and the publisher, by accepting the article for publication, acknowledges that the US government retains a nonexclusive, paid-up, irrevocable, worldwide license to publish or reproduce the published form of this manuscript, or allow others to do so, for US government purposes. DOE will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan. This research used resources of the Oak Ridge Leadership Computing Facility at the Oak Ridge National Laboratory, which is supported by the Office of Science of the US DOE under Contract No. DE-AC05-00OR22725.

Gopalakrishnan Meena, Murali [ORNL] (ORCID:0000000↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Temperature-Dependent Transport Characteristics of 2D MoS2 Channel FETs Grown Using Salt-Based Precursors

D Transition Metal Dichalcogenides (TMDs), particularly MoS2, are promising candidates for sub-10 nm Gate All Around (GAA) CMOS FETs. Salt-assisted Chemical Vapor Deposition (CVD) enable lateral MoS2 growth at atmospheric pressure and low temperatures. This work analyzes salt-based precursor-driven CVD-grown MoS2 FETs at various temperatures. MoS2 was grown using Ammonium Molybdate salt, sulfurized at 750∘C, and transferred onto p−Si3/SiO2 substrates. At room temperature, threshold voltage (VT) ranged from -35 V to -25 V, with a peak drain current of 1.2μA/μm. As temperature increased above 325K, VT shifted exponentially, and carrier mobility dropped significantly. At 400 K, the gate lost channel control, though gate leakage current remained low. These results are compared with non-salt-based MoS2 growth to assess salt precursor effects.Notice: This manuscript has been authored by UT-Battelle, LLC, under contract DE-AC05-00OR22725 with the US Department of Energy (DOE). The US government retains and the publisher, by accepting the article for publication, acknowledges that the US government retains a nonexclusive, paid-up, irrevocable, worldwide license to publish or reproduce the published form of this manuscript, or allow others to do so, for US government purposes. DOE will provide public access to these results of federally sponsored research in accordance with the DOE Public Access Plan (https://www.energy.gov/doe-public-access-plan).

Jones, Andrew [ORNL] (ORCID:0009000233849687)↗

A Vision for Coupling Operation of US Fusion Facilities with HPC Systems and the Implications for Workflows and Data Management

The operation of large US Department of Energy (DOE) research facilities, like the DIII-D National Fusion Facility, results in the collection of complex multi-dimensional scientific datasets, both experimental and model-generated. In the future, it is envisioned that integrated data analysis coupled with large-scale high performance computing (HPC) simulations will be used to improve experimental planning and operation. Practically, massive data sets from these simulations provide the physics basis for generation of both reduced semi-analytic and machine-learning-based models. Storage of both HPC simulation datasets (generated from US DOE leadership computing facilities) and experimental datasets presents significant challenges. In this paper, we present a vision for a DOE-wide data management workflow that integrates US DOE fusion facilities with leadership computing facilities. Data persistence and long-term availability beyond the length of allocated projects is essential, particularly for verification and recalibration of artificial intelligence and machine learning (AI/ML) models. Because these data sets are often generated and shared among hundreds of users across multiple leadership computing facility centers, they would benefit from cross-platform accessibility, persistent identifiers (e.g. DOI, or digital object identifier), and provenance tracking. Here, the ability to handle different data access patterns suggests that a combination of low cost, high latency (e.g. for storing ML training sets) and high cost, low latency systems (e.g. for real-time, integrated machine control feedback) may be needed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗