Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RELIEF VALVES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Major results from safety-related integral effect tests with VISTA-ITL for the SMART design

A series of integral effect tests (IETs) was performed by the Korea Atomic Energy Research Inst. (KAERI) using the VISTA integral test loop (VISTA-ITL) as a small-scale IET program. Among them this paper presents major results acquired from the safety-related IETs with the VISTA-ITL facility for the SMART design. Three small-break loss-of-coolant accident (SBLOCA) tests of safety injection system (SIS) line break, shutdown cooling system (SCS) line break and pressurizer safety valve (PSV) line break were successfully performed and the transient characteristics of a complete loss of flowrate (CLOF) was simulated properly with the VISTA-ITL facility. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Study on Water-ingress Accident during the Initial Core and the Running-in Phase of HTR-PM - 18429

Water ingress accident is one of the typical accidents with potential hazard to the high temperature gas-cooled reactor (HTGR), which will cause reactivity introduction, as well as the chemical corrosion of the graphite fuel elements and reflector structure material. Besides, increase of the primary pressure may result in the opening of the safety valves, consequently leading the release of radioactive isotopes. Therefore high attention has been paid to water ingress phenomenon during the design of the HTGR to verify its inherent safety characteristics. The online continuous discharge and multi-pass of the fuel elements is another important characteristics for the pebble-bed HTGR which can effectively increase the reactor operation availability. From the initial core, a long period of time, namely the running-in phase, is needed to reach the final long-term stable equilibrium core. During this period of time, the core states are totally different, including the number of the fuel elements, the fuel enrichment, the accumulation of the fission product, the temperature feedback coefficient of the reactivity, and so on. In this paper, based on the design of 250 MW Pebble-bed Module High Temperature gas-cooled Reactor (HTR-PM) and a candidate proposal for its initial core and running-in phase, considering three typical states during the running-in phase, the design basis accident of a double-ended guillotine break of one heating tube has been analyzed with the TINTE code, and the results are compared with that of the equilibrium core. Some important parameters during the transient process, including the power, the temperature of the fuel element, the pressure of the primary coolant, as well as the graphite corrosion rate, are studied. To a certain extent, the results can verity the design of the initial core and the running-in phase, and also further prove the safety feature of the HTR. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Next Generation Nuclear Plant Phenomena Identification and Ranking Tables (PIRTs) Volume 3: Fission-Product Transport and Dose PIRTs

This Fission Product Transport (FPT) Phenomena Identification and Ranking Technique (PIRT) report briefly reviews the high-temperature gas-cooled reactor (HTGR) FPT mechanisms and then documents the step-by-step PIRT process for FPT. The panel examined three FPT modes of operation: (1) Normal operation which, for the purposes of the FPT PIRT, established the fission product circuit loading and distribution for the accident phase. (2) Anticipated transients which were of less importance to the panel because a break in the pressure circuit boundary is generally necessary for the release of fission products. The transients can change the fission product distribution within the circuit, however, because temperature changes, flow perturbations, and mechanical vibrations or shocks can result in fission product movement. (3) Postulated accidents drew the majority of the panel's time because a breach in the pressure boundary is necessary to release fission products to the confinement. The accidents of interest involved a vessel or pipe break, a safety valve opening with or without sticking, or leak of some kind. Two generic scenarios were selected as postulated accidents: (1) the pressurized loss-of-forced circulation (P-LOFC) accident, and (2) the depressurized loss-of-forced circulation (D-LOFC) accidents. FPT is not an accident driver; it is the result of an accident, and the PIRT was broken down into a two-part task. First, normal operation was seen as the initial starting point for the analysis. Fission products will be released by the fuel and distributed throughout the reactor circuit in some fashion. Second, a primary circuit breach can then lead to their release. It is the magnitude of the release into and out of the confinement that is of interest. Depending on the design of a confinement or containment, the impact of a pressure boundary breach can be minimized if a modest, but not excessively large, fission product attenuation factor can be introduced into the release path. This exercise has identified a host of material properties, thermofluid states, and physics models that must be collected, defined, and understood to evaluate this attenuation factor. The assembled PIRT table underwent two iterations with extensive reorganization between meetings. Generally, convergence was obtained on most issues, but different approaches to the specific physics and transport paths shade the answers accordingly. The reader should be cautioned that merely selecting phenomena based on high importance and low knowledge may not capture the true uncertainty of the situation. This is because a transport path is composed of several serial linkages, each with its own uncertainty. The propagation of a chain of modest uncertainties can lead to a very large uncertainty at the end of a long path, resulting in a situation that is of little regulatory guidance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Lessons learned from a hydrogen explosion

On January 8, 2007 a hydrogen explosion at the Msukingum River Power plant's 585-MW coal-fired supercritical unit 5 caused one fatality, injuries to 10 other people and significant damage to several buildings. The explosion occurred during a routine delivery of hydrogen, used to cool generating units, when a hydrogen relief device failed, which allowed the contents of the hydrogen tank to escape and be ignited by an unknown source. This article covers the findings of the incident investigation and the actions the plant has taken to prevent a reoccurrence. 4 photos.

01 COAL, LIGNITE, AND PEAT↗

Preliminary Design of Critical Function Monitoring System of PGSFR

A PGSFR (Prototype Gen-IV Sodium-cooled Fast Reactor) is under development at Korea Atomic Energy Research Institute. A critical function monitoring system of the PGSFR is preliminarily studied. The functions of CFMS are to display critical plant variables related to the safety of the plant during normal and accident conditions and guide the operators corrective actions to keep the plant in a safe condition and mitigate the consequences of accidents. The minimal critical functions of the PGSFR are composed of reactivity control, reactor core cooling, reactor coolant system integrity, primary heat transfer system(PHTS) heat removal, sodium water reaction mitigation, radiation control and containment conditions. The variables and alarm legs of each critical function of the PGSFR are as follows; - Reactivity control: The variables of reactivity control function are power range neutron flux instrumentation, intermediate range neutron flux instrumentation, source range neutron flux instrumentation, and control rod bottom contacts. The alarm leg to display the reactivity controls consists of status of control drop malfunction, high post trip power and thermal reactivity addition. - Reactor core cooling: The variables are PHTS sodium level, hot pool temperature of PHTS, subassembly exit temperature, cold pool temperature of the PHTS, PHTS pump current, and PHTS pump breaker status. The alarm leg consists of high core delta temperature, low sodium level of the PHTS, high subassembly exit temperature, and low PHTS pump load. - Reactor coolant system integrity: The variables are PHTS sodium level, cover gas pressure, and safeguard vessel sodium level. The alarm leg is composed of low sodium level of PHTS, high cover gas pressure and high sodium level of the safety guard vessel. - PHTS heat removal: The variables are PHTS sodium level, hot pool temperature of PHTS, core exit temperature, cold pool temperature of the PHTS, flow rate of passive residual heat removal system, flow rate of active residual heat removal system, and temperatures of air heat exchanger temperature of residual heat removal systems. The alarm legs are composed of two legs of a 'passive residual heat removal system not cooling' and 'active residual heat removal system not cooling'. - Sodium water reaction mitigation: The variables are intermediate heat transfer system(IHTS) pressure, pressure and temperature and level of sodium dump tank, the status of rupture disk, hydrogen concentration in IHTS and direct variable of sodium-water-reaction measure. The alarm leg consists of high IHTS pressure, the status of sodium water reaction mitigation system and the indication of direct measure. - Radiation control: The variables are radiation of PHTS, radiation of IHTS, and radiation of containment purge. The alarm leg is composed of high radiation of PHTS and IHTS, and containment purge system. - Containment condition: The variables are containment pressure, containment isolation status, and sodium fire. The alarm leg consists of high containment pressure, status of containment isolation and status of sodium fire. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A throat-bypass stability system for a YF-12 aircraft research inlet using self-acting mechanical valves

Results of a wind tunnel investigation are presented. The inlet was modified so that airflow can be removed through a porous cowl-bleed region in the vicinity of the throat. Bleed plenum exit flow area is controlled by relief type mechanical valves. Unlike valves in previous systems, these are made for use in a high Mach flight environment and include refinements so that the system could be tested on a NASA YF-12 aircraft. The valves were designed to provide their own reference pressure. The results show that the system can absorb internal-airflow-transients that are too fast for a conventional bypass door control system and that the two systems complement each other quite well. Increased tolerance to angle of attack and Mach number changes is indicated. The valves should provide sufficient time for the inlet control system to make geometry changes required to keep the inlet started.

Cole, G. L.↗

A throat-bypass stability system for a YF-12 aircraft research inlet using self-acting mechanical valves

Results of a wind tunnel investigation are presented. The inlet was modified so that airflow can be removed through a porous cowl-bleed region in the vicinity of the throat. Bleed plenum exit flow area is controlled by relief type mechanical valves. Unlike valves in previous systems, these are made for use in a high Mach flight environment and include refinements so that the system could be tested on a NASA YF-12 aircraft. The valves were designed to provide their own reference pressure; hence, do not respond to slowly varying disturbances. However, the results show that the system can absorb internal-airflow-transients that are too fast for a conventional bypass door control system and that the two systems complement each other quite well. Increased tolerance to angle of attack and Mach number changes is indicated. The valves should provide sufficient time for the inlet control system to make geometry changes required to keep the inlet started.

Cole, G. L.↗

Final Cassini Propulsion System In-Flight Characterization

Cassini plunged into Saturn’s atmosphere on September 15, 2017, the culmination of two decades of incredible planetary exploration. The Cassini propulsion system performed spectacularly during this lengthy mission, executing 360 propulsive maneuvers successfully. R-4D performance was impeccable during 183 main-engine burns, ranging from 1.3 seconds to 96 minutes in duration. Pressure transducer drift was negligible, latch valve back-pressure relief was nominal, and pressurization system performance was flawless, except for hard-seat prime regulator leakage early in the mission. System health checks based on helium mass calculations (helium mass budgets) demonstrated no discernible helium pressurant or propellant leakage. Premature degradation of prime MR-103H RCS thrusters was noted, but back-up RCS thrusters completed the mission successfully. Final usable propellant margins were about 25% for hydrazine and less than 1% for bipropellant.

Barber, Todd J.↗

Metal hydride fuel storage and method thereof

An apparatus having a first substrate having (1) a cavity, (2) one or more resistive heaters, and (3) one or more coatings forming a diffusion barrier to hydrogen; a second substrate having (1) an outlet valve comprising a pressure relief structure and (2) one or more coatings forming a diffusion barrier to hydrogen, wherein said second substrate is coupled to said first substrate forming a sealed volume in said cavity; a metal hydride material contained within said cavity; and a gas distribution system formed by coupling a microfluidic interconnect to said pressure relief structure. Additional apparatuses and methods are also disclosed.

47 OTHER INSTRUMENTATION↗

SAFETY ASPECTS OF BIG CRYOGENIC SYSTEMS DESIGN

Superconductivity and helium cryogenics are key technologies in the construction of large scientific instruments, like accelerators, fusion reactors or free electron lasers. Such cryogenic systems may contain more than hundred tons of helium, mostly in cold and high-density phases. In spite of the high reliability of the systems, accidental loss of the insulation vacuum, pipe rupture or rapid energy dissipation in the cold helium can not be overlooked. To avoid the danger of over-design pressure rise in the cryostats, they need to be equipped with a helium relief system. Such a system is comprised of safety valves, bursting disks and optionally cold or warm quench lines, collectors and storage tanks. Proper design of the helium safety relief system requires a good understanding of worst case scenarios. Such scenarios will be discussed, taking into account different possible failures of the cryogenic system. In any case it is necessary to estimate heat transfer through degraded vacuum superinsulation and mass flow through the valves and safety disks. Even if the design of the helium relief system does not foresee direct helium venting into the environment, an occasional emergency helium spill may happen. Helium propagation in the atmosphere and the origins of oxygen-deficiency hazards will be discussed.

42 ENGINEERING↗

RHIC Recovery Review Report [See also: RHIC Recovery Review - Hybrid Meeting (11/28/2023) - Indico.bnl.gov]

Just after 12:30 PM on August 1, 2023, the RHIC superconducting magnet quench system triggered and consequently the energy dump resistors were switched into the blue ring quad and dipole circuits and the interaction region DX dipole heaters were switched on. This was a spurious trip (there was no actual quench) and was not unusual as the outdoor summer temperature often caused the quench detectors to cause such trips. The collider control room notified the on-duty cryogenics technical staff of the quench trip. A short time later building 1004B cryogenic low-helium and valve box insulation vacuum failure alarms were observed. The cryogenics technical staff observed the cryo-relief line from the blue ring valve box was exhausting helium outside the building.

43 PARTICLE ACCELERATORS↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Independent Orbiter Assessment (IOA): Analysis of the electrical power generation/power reactant storage and distribution subsystem

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NAA FMEA/CIL documentation. The independent analysis results corresponding to the Orbiter Electrical Power Generation (EPG)/Power Reactants Storage and Distribution (PRSD) System Hardware is documented. The EPG/PRSD hardware is required for performing critical functions of cryogenic hydrogen and oxygen storage and distribution to the Fuel Cell Powerplants (FCP) and Atmospheric Revitalization Pressure Control Subsystem (ARPCS). Specifically, the EPG/PRSD hardware consists of the following: Hydryogen (H2) tanks; Oxygen (O2) tanks; H2 Relief Valve/Filter Packages (HRVFP); O2 Relief Valve/Filter Packages (ORVFP); H2 Valve Modules (HVM); O2 Valve Modules (OVM); and O2 and H2 lines, components, and fittings.

Gotch, S. M.↗

Pressure Regulator With Internal Ejector Circulation Pump, Flow and Pressure Measurement Porting, and Fuel Cell System Integration Options

An advanced reactant pressure regulator with an internal ejector reactant circulation pump has been developed to support NASA's future fuel cell power systems needs. These needs include reliable and safe operation in variable-gravity environments, and for exploration activities with both manned and un manned vehicles. This product was developed for use in Proton Exchange Membrane Fuel Cell (PEMFC) power plant reactant circulation systems, but the design could also be applied to other fuel cell system types, (e.g., solid-oxide or alkaline) or for other gas pressure regulation and circulation needs. The regulator design includes porting for measurement of flow and pressure at key points in the system, and also includes several fuel cell system integration options. NASA has recognized ejectors as a viable alternative to mechanical pumps for use in spacecraft fuel cell power systems. The ejector motive force is provided by a variable, high-pressure supply gas that travels through the ejector s jet nozzle, whereby the pressure energy of the fluid stream is converted to kinetic energy in the gas jet. The ejector can produce circulation-to-consumption-flow ratios that are relatively high (2-3 times), and this phenomenon can potentially (with proper consideration of the remainder of the fuel cell system s design) be used to provide completely for reactant pre-humidification and product water removal in a fuel cell system. Specifically, a custom pressure regulator has been developed that includes: (1) an ejector reactant circulation pump (with interchangeable jet nozzles and mixer sections, gas-tight sliding and static seals in required locations, and internal fluid porting for pressure-sensing at the regulator's control elements) and (2) internal fluid porting to allow for flow rate and system pressure measurements. The fluid porting also allows for inclusion of purge, relief, and vacuum-breaker check valves on the regulator assembly. In addition, this regulator could also be used with NASA's advanced nonflow-through fuel cell power systems by simply incorporating a jet nozzle with an appropriate nozzle diameter.

Vasquez, Arturo↗

Conceptual design of pressure relief systems for cryogenic application

The conceptual design of pressure relief systems is an important aspect in the early phase of any cryogenic system design, because a prudent and responsible evaluation of relief systems involves much more than just relief devices. The conceptual design consists of various steps: At first, hazard scenarios must be considered and the worst-case scenario identified. Next, a staged interaction against pressure increase is to be defined. This is followed by the selection of the general type of pressure relief device for each stage, such as safety valve and rupture disc, respectively. Then, a decision concerning their locations, their capacities and specific features must be taken. Furthermore, it is mandatory to consider the inlet pressure drop and the back pressure in the exhaust line for sizing the safety devices. And last but not least, economic and environmental considerations must be made in case of releasing the medium to the atmosphere. The development of the system's safety concept calls for a risk management strategy based on identification and analysis of hazards, and consequent risk mitigation using a system-based approach in compliance with the standards.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fluidics cube for biosensor miniaturization

To create a small, portable, fully automated biosensor, a compact means of fluid handling is required. We designed, manufactured, and tested a "fluidics cube" for such a purpose. This cube, made of thermoplastic, contains reservoirs and channels for liquid samples and reagents and operates without the use of any internal valves or meters; it is a passive fluid circuit that relies on pressure relief vents to control fluid movement. We demonstrate the ability of pressure relief vents to control fluid movement and show how to simply manufacture or modify the cube. Combined with the planar array biosensor developed at the Naval Research Laboratory, it brings us one step closer to realizing our goal of a handheld biosensor capable of analyzing multiple samples for multiple analytes.

NASA Discipline Life Sciences Technologies↗

Causes and Mitigation of Fuel Pilot Operated Valve Pilot Seal Extrusion in Space Shuttle Orbiter Primary RCS Thrusters

Extrusion of a polytetrafluoroethylene (PTFE) pilot seal located in the Space Shuttle Orbiter Primary Reaction Control Subsystem (PRCS) thruster fuel valve has been implicated in 68 ground and on-orbit fuel valve failures. A rash of six extrusion-related in-flight anomalies over a six-mission span from December 2001 to October 2002 led to heightened activity at various NASA centers, and the formation of a multidisciplinary team to solve the problem. Empirical and theoretical approaches were used. For example, thermomechanical analysis (TMA) and exposure tests showed that some extrusion is produced by thermal cycling; however, a review of thruster service histories did not reveal a strong link between thermal cycling and extrusion. Calculations showed that the amount of observed extrusion often exceeded the amount allowed by thermally-induced stress relief. Failure analysis of failed hardware also revealed the presence of fuel-oxidizer reaction product (FORP) inside the fuel valve pilot seal cavity, and differential scanning calorimetry (DSC) showed that the FORP was intimately associated with the pilot seal material. Component-level exposure tests showed that FORP of similar composition could be produced by adjacent oxidizer valve leakage in the absence of thruster firing. Specific gravity data showed that extruded fuel valve pilot seals were less dense than new pilot seals or oxidizer valve pilot seals, indicating permanent modification of the PTFE occurred during service. It is concluded that some thermally-induced extrusion is unavoidable; however, oxidizer leakage-induced extrusion is mostly avoidable and can be mitigated. Several engineering level mitigation strategies are discussed.

Waller, Jess M.↗

Underwater space suit pressure control regulator

A device is reported for regulating the pneumatic pressure in a ventilated space suit relative to the pressure imposed on the suit when being worn by a person underwater to simulate space environment for testing and experimentation. A box unit located on the chest area of the suit comprises connections for suit air supply and return lines and carries a regulator valve that stabilizes the air pressure differential between the inside and outside of the suit. The valve and suit pressure is controlled by the suit occupant and the valve includes a mechanism for quickly dumping the suit pressure in case of emergency. Pressure monitoring and relief devices are also included in the box unit.

Aldrich, B. R.↗