Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAMP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Localization and Mapping Platform Software (LAMP) v3

The Localization and Mapping Platform (LAMP) software fuses radiation and contextual data to produce 3-D maps that locate and identify gamma-ray emitting sources in complex environments. It enables data collection, fusion, and processing onboard the LAMP system in handheld configurations, and enables near-real-time 3-D mapping from onboard an unmanned aerial system (UAS). This software enables a real-time 3-D gamma-ray mapping capability that is not available commercially.

Joshi, Tenzing↗

DOE CALiPER Program, Report 20.1 Subjective Evaluation of Beam Quality, Shadow Quality, and Color Quality for LED PAR38 Lamps

This report focuses on human-evaluated characteristics, including beam quality, shadow quality, and color quality. Using a questionnaire that included rank ordering, opinions on 27 of the Report 20 PAR38 lamps were gathered during a demonstration event for members of the local Illuminating Engineering Society (IES) chapter. This was not a rigorous scientific experiment, and the data should not be extrapolated beyond the scope of the demonstration. The results suggest that many of the LED products compared favorably to halogen PAR38 benchmarks in all attributes considered. LED lamps using a single-emitter design were generally preferred for their beam quality and shadow quality, and the IES members ranking of color quality did not always match the rank according to the color rendering index (CRI).

Beam Quality↗

C-LAMP Subproject Description:Climate Forcing by the Terrestrial Biosphere During the Second Half of the 20th Century

This project will quantify selected components of climate forcing due to changes in the terrestrial biosphere over the period 1948-2004, as simulated by the climate / carboncycle models participating in C-LAMP (the Carbon-Land Model Intercomparison Project; see http://www.climatemodeling.org/c-lamp). Unlike other C-LAMP projects that attempt to close the carbon budget, this project will focus on the contributions of individual biomes in terms of the resulting climate forcing. Bala et al. (2007) used a similar (though more comprehensive) model-based technique to assess and compare different components of biospheric climate forcing, but their focus was on potential future deforestation rather than the historical period.

54 ENVIRONMENTAL SCIENCES↗

CALiPER Application Summary Report 17. LED AR111 and PAR36 Lamps

Report 17 analyzes the performance of a group of six LED products labeled as AR111 lamps. Results indicate that this product category lags behind other types of directional LED lamps but may perform acceptably in some applications and provide some energy savings.

caliper↗

CALiPER Application Summary Report 20: LED PAR38 Lamps

This report analyzes the independently tested photometric performance of 38 LED PAR38 lamps. The test results indicate substantial improvement versus earlier CALiPER testing of similar products, and performance comparable to recent data from LED Lighting Facts and ENERGY STAR. Additional testing that focuses on performance attributes beyond those covered by LM-79-08 is planned for this group of lamps, and will be presented in subsequent reports.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RF Power Estimates for LAMP Drift-Tube Linac

The LANSCE Modernization Project (LAMP) concept includes a drift-tube proton linac (DTL) from 3 MeV to 100 MeV consisting of 6 tanks. This technical note provides estimates of RF power required for the LAMP DTL tanks using DTLfish modeling.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report (Rev. 1)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed. Corresponding Technical Readiness Levels (TRLs) were also determined for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Only two subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Overview [Slides]

The LANSCE Modernization Project (LAMP) is an essential element of LANSCE sustainment. The LANSCE Front End is a single point-of-failure, long-term facility risk due to obsolescence and unexpected failures. The high-TRL LAMP front end will use modern supply chains to position LANSCE for decades of operation. The existing PSR is a risk to consistent and reliable beam delivery for material science and nuclear physics at Lujan. We have developed several options for the PSR upgrade, each of which builds upon the previous option.

42 ENGINEERING↗

Start-to-end simulation for LAMP front-end scoping studies

We present a design of a new front end in support of the LANSCE Modernization Project (LAMP). This is an updated front-end design that can largely meet LAMP threshold needs. The first half of this report details each section of the front end, including a summary of the physics design and function. The second half simulates several beam formats from the initial source all the way through the final DTL section (i.e. start-to-end simulations). Details and assumptions are described. The following table summarizes the key results for the different beam formats from this study.

43 PARTICLE ACCELERATORS↗

LAMP DTL Scoping Studies (Technical Report)

The present studies are based on the preliminary design efforts, and on the Scoping Studies of the “Strawman” design of LAMP front-end upgrade, referred in the text below to as “Feb.2024 Iteration”, presented in. The main accomplishment of present studies was substantial increase of the fidelity of the beam dynamics simulations in the proposed drift tube linac (DTL). The main accent was on development of the methodology for calculation of the longitudinal (synchrotron) and transverse (betatron) oscillations frequencies (phase advance per focusing period) values and providing the accelerating structure focusing lattice that has safe parameters of such oscillations to avoid unwanted emittance growth and possible beam halo formation. The resulting values of the oscillations phase advances are presented in Table 1, and in Figure 5 in the main body of the report. Special efforts were made to achieve the RF power consumption within limits of the existing RF power system and make sure that DTL fits in the existing tunnel. The LAMP scope does not suggest any additional building and/or tunnel construction. Table 1 summarizes some of these results, as well as Table 3 in the main body of the report.

43 PARTICLE ACCELERATORS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS↗

High-Power Amplifier Considerations for testing the LAMP RFQ and first DTL Cavity

As part of the LANSCE Accelerator Modernization Pro ject (LAMP), critical portions of the proposed accelerator will be tested as proof of concept and aid in planning the installation of LAMP at Los Alamos Neutron Science Cen ter. As part of this demonstration, the radio frequency quadrupole (RFQ) and the first drift-tube linac (DTL) cav ity will be tested with beam. For this purpose, high-power RF amplifiers are being designed to meet the testing de mands. This is a description of the requirements of these amplifiers and how the design is intended to meet them.

42 ENGINEERING↗

Decontamination Strategy for Large Area and/or Equipment Contaminated with Chemical and Biological Agents using a High Energy Arc Lamp (HEAL)

A strategy for the decontamination of large areas and or equipment contaminated with Biological Warfare Agents (BWAs) and Chemical Warfare Agents (CWAs) was demonstrated using a High Energy Arc Lamp (HEAL) photolysis system. This strategy offers an alternative that is potentially quicker, less hazardous, generates far less waste, and is easier to deploy than those currently fielded by the Department of Defense (DoD). For example, for large frame aircraft the United States Air Force still relies on the combination of weathering (stand alone in environment), air washing (fly aircraft) and finally washing the aircraft with Hot Soapy Water (HSW) in an attempt to remove any remaining contamination. This method is laborious, time consuming (upwards of 12+ hours not including decontamination site preparation), and requires large amounts of water (e.g., 1,600+ gallons for a single large frame aircraft), and generates large amounts of hazardous waste requiring disposal. The efficacy of the HEAL system was demonstrated using diisopropyl methyl phosphonate (DIMP) a G series CWA simulant, and Bacillus globigii (BG) a simulant of Bacillus anthracis. Experiments were designed to simulate the energy flux of a field deployable lamp system that could stand-off 17 meters from a 12m2 target area and uniformly expose a surface at 1360 W/m2. The HEAL system in the absence of a catalyst reduced the amount of B. globigii by five orders of magnitude at a starting concentration of 1.63 x 107 spores. In the case of CWA simulants, the HEAL system in the presence of the catalyst TiO2 effectively degraded DIMP sprayed onto a 100mm diameter Petri dish in 5 minutes.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Use of Carbon Arc Lamps as Solar Simulation in Environmental Testing

This report covers work done by the authors on the solar simulator for the six-foot diameter space simulator presently in use at JPL. The space simulator was made by modifying an existent vacuum chamber and uses carbon arc lamps for solar simulation. All Ranger vehicles flown to date have been tested in this facility. The report also contains a series of appendixes covering various aspects of space-simulation design and use. Some of these appendixes contain detailed analyses of space-simulator design criteria. Others cover the techniques used in studying carbon-arc lamps and in applying them as solar simulation.

SUNFLOWER POWER SYSTEM↗

Lamp automatically switches to new filament on burnout

Lamp with primary and secondary filaments has a means for automatic switching to the secondary filament at primary filament burnout. Lamp failures and resultant expenses during oscillograph printing are appreciably reduced.

Ingle, W. B.↗