Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Draft Requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 163 records · Page 9

Data Relay Board with Protocol for High-Speed, Free-Space Optical Communications

In a free-space optical communication system, the mitigation of transient outages through the incorporation of error-control methods is of particular concern, the outages being caused by scintillation fades and obscurants. The focus of this innovative technology is the development of a data relay system for a reliable high-data-rate free-spacebased optical-transport network. The data relay boards will establish the link, maintain synchronous connection, group the data into frames, and provide for automatic retransmission (ARQ) of lost or erred frames. A certain Quality of Service (QoS) can then be ensured, compatible with the required data rate. The protocol to be used by the data relay system is based on the draft CCSDS standard data-link protocol Proximity-1, selected by orbiters to multiple lander assets in the Mars network, for example. In addition to providing data-link protocol capabilities for the free-space optical link and buffering the data, the data relay system will interface directly with user applications over Gigabit Ethernet and/or with highspeed storage resources via Fibre Channel. The hardware implementation is built on a network-processor-based architecture. This technology combines the power of a hardware switch capable of data switching and packet routing at Gbps rates, with the flexibility of a software- driven processor that can host highly adaptive and reconfigurable protocols used, for example, in wireless local-area networks (LANs). The system will be implemented in a modular multi-board fashion. The main hardware elements of the data relay system are the new data relay board developed by Rockwell Scientific, a COTS Gigabit Ethernet board for user interface, and a COTS Fibre Channel board that connects to local storage. The boards reside in a cPCI back plane, and can be housed in a VME-type enclosure.

Wright, Malcolm↗

SIRFN Draft Test Protocols for Advanced Battery Energy Storage System Interoperability Functions.

IEA Implementing Agreement for International Smart Grid Action Network, a Cooperative Program on Smart Grids (ISGAN) discussion papers are meant as input documents to the global discussion about smart grids. Each is a statement by the author(s) regarding a topic of international interest. They reflect works in progress in the development of smart grids in the different regions of the world. Their aim is not to communicate a final outcome or to advise decision-makers, but rather to lay the ground work for further research and analysis. In this report, SIRFN laboratories (Sandia, AIT, RSE and FREA) establish a harmonized Battery Energy Storage System (BESS) evaluation/certification protocol for advanced energy storage functions. The authors present this standardized protocol as an adoption or revision option for jurisdictions when creating or modifying certification testing requirements. To complete this process, each laboratory shared information on national, international, and jurisdictional grid codes and standards for BESS. Based on these requirements, and BESS testing and certification literature, a broad list of interoperability functions, use cases, storage capabilities, and requirements were compiled. This list was then consolidated to a unique set of BESS functions for inclusion in the certification procedure. Draft certification protocols for five initial functions were created by the SIRFN group in order to harmonize the international effort to establish a unified set of procedures for interoperability testing of BESS.

25 ENERGY STORAGE↗

Draft LunaNet Interoperability Specification

Under the guidance of NASA’s Space Communication and Navigation (SCaN) program, this document, along with its companion documents, LunaNet Services Requirements Document (TBD) and the LunaNet Concept of Operations and Architecture (TBD), provides the basis for a comprehensive set of requirements for operation of a lunar communications and navigation network capable of interoperating with other networks compliant with the Lunar Network (LunaNet) for services to the human exploration, lunar science, and space technology missions. LunaNet will start with a simple architecture of a few nodes to meet the needs of the early missions and evolve to meet the growing needs of a sustained lunar presence. All relay network services are not expected to be met by a single spacecraft platform, or node. The expectation is that the needs of NASA, its partners and other users will be met through a combination of interoperable systems provided by NASA, international partners, and commercial providers. Interoperability across this network-of-networks can be achieved through negotiation of mutually-agreed-upon standards that will be reflected in this document and in the specifications defined by other participants in the combined, cooperative lunar network.

LunaNet↗

Mercury Calibration System

U.S. Environmental Protection Agency (EPA) Performance Specification 12 in the Clean Air Mercury Rule (CAMR) states that a mercury CEM must be calibrated with National Institute for Standards and Technology (NIST)-traceable standards. In early 2009, a NIST traceable standard for elemental mercury CEM calibration still does not exist. Despite the vacature of CAMR by a Federal appeals court in early 2008, a NIST traceable standard is still needed for whatever regulation is implemented in the future. Thermo Fisher is a major vendor providing complete integrated mercury continuous emissions monitoring (CEM) systems to the industry. WRI is participating with EPA, EPRI, NIST, and Thermo Fisher towards the development of the criteria that will be used in the traceability protocols to be issued by EPA. An initial draft of an elemental mercury calibration traceability protocol was distributed for comment to the participating research groups and vendors on a limited basis in early May 2007. In August 2007, EPA issued an interim traceability protocol for elemental mercury calibrators. Various working drafts of the new interim traceability protocols were distributed in late 2008 and early 2009 to participants in the Mercury Standards Working Committee project. The protocols include sections on qualification and certification. The qualification section describes in general terms tests that must be conducted by the calibrator vendors to demonstrate that their calibration equipment meets the minimum requirements to be established by EPA for use in CAMR monitoring. Variables to be examined include linearity, ambient temperature, back pressure, ambient pressure, line voltage, and effects of shipping. None of the procedures were described in detail in the draft interim documents; however they describe what EPA would like to eventually develop. WRI is providing the data and results to EPA for use in developing revised experimental procedures and realistic acceptance criteria based on actual capabilities of the current calibration technology. As part of the current effort, WRI worked with Thermo Fisher elemental mercury calibrator units to conduct qualification experiments to demonstrate their performance characteristics under a variety of conditions and to demonstrate that they qualify for use in the CEM calibration program. Monitoring of speciated mercury is another concern of this research. The mercury emissions from coal-fired power plants are comprised of both elemental and oxidized mercury. Current CEM analyzers are designed to measure elemental mercury only. Oxidized mercury must first be converted to elemental mercury prior to entering the analyzer inlet in order to be measured. CEM systems must demonstrate the ability to measure both elemental and oxidized mercury. This requires the use of oxidized mercury generators with an efficient conversion of the oxidized mercury to elemental mercury. There are currently two basic types of mercuric chloride (HgCl{sub 2}) generators used for this purpose. One is an evaporative HgCl{sub 2} generator, which produces gas standards of known concentration by vaporization of aqueous HgCl{sub 2} solutions and quantitative mixing with a diluent carrier gas. The other is a device that converts the output from an elemental Hg generator to HgCl{sub 2} by means of a chemical reaction with chlorine gas. The Thermo Fisher oxidizer system involves reaction of elemental mercury vapor with chlorine gas at an elevated temperature. The draft interim protocol for oxidized mercury units involving reaction with chlorine gas requires the vendors to demonstrate high efficiency of oxidation of an elemental mercury stream from an elemental mercury vapor generator. The Thermo Fisher oxidizer unit is designed to operate at the power plant stack at the probe outlet. Following oxidation of elemental mercury from reaction with chlorine gas, a high temperature module reduces the mercuric chloride back to elemental mercury. WRI conducted work with a custom laboratory configured stand-alone oxidized mercury generator unit provided by Thermo Fisher to perform experiments to demonstrate the high efficiency of oxidation on reaction with chlorine gas, and reduction back to elemental mercury.

01 COAL, LIGNITE, AND PEAT↗

Mercury Calibration System

U.S. Environmental Protection Agency (EPA) Performance Specification 12 in the Clean Air Mercury Rule (CAMR) states that a mercury CEM must be calibrated with National Institute for Standards and Technology (NIST)-traceable standards. In early 2009, a NIST traceable standard for elemental mercury CEM calibration still does not exist. Despite the vacature of CAMR by a Federal appeals court in early 2008, a NIST traceable standard is still needed for whatever regulation is implemented in the future. Thermo Fisher is a major vendor providing complete integrated mercury continuous emissions monitoring (CEM) systems to the industry. WRI is participating with EPA, EPRI, NIST, and Thermo Fisher towards the development of the criteria that will be used in the traceability protocols to be issued by EPA. An initial draft of an elemental mercury calibration traceability protocol was distributed for comment to the participating research groups and vendors on a limited basis in early May 2007. In August 2007, EPA issued an interim traceability protocol for elemental mercury calibrators. Various working drafts of the new interim traceability protocols were distributed in late 2008 and early 2009 to participants in the Mercury Standards Working Committee project. The protocols include sections on qualification and certification. The qualification section describes in general terms tests that must be conducted by the calibrator vendors to demonstrate that their calibration equipment meets the minimum requirements to be established by EPA for use in CAMR monitoring. Variables to be examined include linearity, ambient temperature, back pressure, ambient pressure, line voltage, and effects of shipping. None of the procedures were described in detail in the draft interim documents; however they describe what EPA would like to eventually develop. WRI is providing the data and results to EPA for use in developing revised experimental procedures and realistic acceptance criteria based on actual capabilities of the current calibration technology. As part of the current effort, WRI worked with Thermo Fisher elemental mercury calibrator units to conduct qualification experiments to demonstrate their performance characteristics under a variety of conditions and to demonstrate that they qualify for use in the CEM calibration program. Monitoring of speciated mercury is another concern of this research. The mercury emissions from coal-fired power plants are comprised of both elemental and oxidized mercury. Current CEM analyzers are designed to measure elemental mercury only. Oxidized mercury must first be converted to elemental mercury prior to entering the analyzer inlet in order to be measured. CEM systems must demonstrate the ability to measure both elemental and oxidized mercury. This requires the use of oxidized mercury generators with an efficient conversion of the oxidized mercury to elemental mercury. There are currently two basic types of mercuric chloride (HgCl{sub 2}) generators used for this purpose. One is an evaporative HgCl{sub 2} generator, which produces gas standards of known concentration by vaporization of aqueous HgCl{sub 2} solutions and quantitative mixing with a diluent carrier gas. The other is a device that converts the output from an elemental Hg generator to HgCl{sub 2} by means of a chemical reaction with chlorine gas. The Thermo Fisher oxidizer system involves reaction of elemental mercury vapor with chlorine gas at an elevated temperature. The draft interim protocol for oxidized mercury units involving reaction with chlorine gas requires the vendors to demonstrate high efficiency of oxidation of an elemental mercury stream from an elemental mercury vapor generator. The Thermo Fisher oxidizer unit is designed to operate at the power plant stack at the probe outlet. Following oxidation of elemental mercury from reaction with chlorine gas, a high temperature module reduces the mercuric chloride back to elemental mercury. WRI conducted work with a custom laboratory configured stand-alone oxidized mercury generator unit provided by Thermo Fisher to perform experiments to demonstrate the high efficiency of oxidation on reaction with chlorine gas, and reduction back to elemental mercury.

01 COAL, LIGNITE, AND PEAT↗

NASA Technology Area 07: Human Exploration Destination Systems Roadmap

This paper gives an overview of the National Aeronautics and Space Administration (NASA) Office of Chief Technologist (OCT) led Space Technology Roadmap definition efforts. This paper will given an executive summary of the technology area 07 (TA07) Human Exploration Destination Systems (HEDS). These are draft roadmaps being reviewed and updated by the National Research Council. Deep-space human exploration missions will require many game changing technologies to enable safe missions, become more independent, and enable intelligent autonomous operations and take advantage of the local resources to become self-sufficient thereby meeting the goal of sustained human presence in space. Taking advantage of in-situ resources enhances and enables revolutionary robotic and human missions beyond the traditional mission architectures and launch vehicle capabilities. Mobility systems will include in-space flying, surface roving, and Extra-vehicular Activity/Extravehicular Robotics (EVA/EVR) mobility. These push missions will take advantage of sustainability and supportability technologies that will allow mission independence to conduct human mission operations either on or near the Earth, in deep space, in the vicinity of Mars, or on the Martian surface while opening up commercialization opportunities in low Earth orbit (LEO) for research, industrial development, academia, and entertainment space industries. The Human Exploration Destination Systems (HEDS) Technology Area (TA) 7 Team has been chartered by the Office of the Chief Technologist (OCT) to strategically roadmap technology investments that will enable sustained human exploration and support NASA s missions and goals for at least the next 25 years. HEDS technologies will enable a sustained human presence for exploring destinations such as remote sites on Earth and beyond including, but not limited to, LaGrange points, low Earth orbit (LEO), high Earth orbit (HEO), geosynchronous orbit (GEO), the Moon, near-Earth objects (NEOs), which > 95% are asteroidal bodies, Phobos, Deimos, Mars, and beyond. The HEDS technology roadmap will strategically guide NASA and other U.S. Government agency technology investments that will result in capabilities enabling human exploration missions to diverse destinations generating high returns on investments.

Kennedy, Kriss J.↗

Genome Sequence Databases (Overview): Sequencing and Assembly

From the date its role in heredity was discovered, DNA has been generating interest among scientists from different fields of knowledge: physicists have studied the three dimensional structure of the DNA molecule, biologists tried to decode the secrets of life hidden within these long molecules, and technologists invent and improve methods of DNA analysis. The analysis of the nucleotide sequence of DNA occupies a special place among the methods developed. Thanks to the variety of sequencing technologies available, the process of decoding the sequence of genomic DNA (or whole genome sequencing) has become robust and inexpensive. Meanwhile the assembly of whole genome sequences remains a challenging task. In addition to the need to assemble millions of DNA fragments of different length (from 35 bp (Solexa) to 800 bp (Sanger)), great interest in analysis of microbial communities (metagenomes) of different complexities raises new problems and pushes some new requirements for sequence assembly tools to the forefront. The genome assembly process can be divided into two steps: draft assembly and assembly improvement (finishing). Despite the fact that automatically performed assembly (or draft assembly) is capable of covering up to 98% of the genome, in most cases, it still contains incorrectly assembled reads. The error rate of the consensus sequence produced at this stage is about 1/2000 bp. A finished genome represents the genome assembly of much higher accuracy (with no gaps or incorrectly assembled areas) and quality ({approx}1 error/10,000 bp), validated through a number of computer and laboratory experiments.

59 BASIC BIOLOGICAL SCIENCES↗

Endogenous Assessment of the Capacity Value of Solar PV in Generation Investment Planning Studies. Draft

There exist several different reliability- and approximation-based methods to determine the capacity contribution of solar resources towards resource adequacy. However, most of these approaches require knowing in advance the installed capacities of both conventional and solar generators. This is a complication since generator capacities are actually decision variables in capacity planning studies. In this article we study the effect of time resolution and solar PV penetration using a capacity planning model that accounts for the full distribution of generator outages and solar resource variability. We also describe a modification of a standard deterministic planning model that enforces a resource adequacy target through a reserve margin constraint. Our numerical experiments show that at least 50 days worth of data are necessary to approximate the results of the full-resolution model with a maximum error of 2.5% on costs and capacity. We also show that the amount of displaced capacity of conventional generation decreases rapidly as the penetration of solar PV increases. We find that using an exogenously defined and constant capacity factor based on time-series data can yield relatively accurate results for small penetration levels (less than 5%). For higher penetration levels (up to 20%), the modified deterministic planning model better captures avoided costs and the decreasing value of solar PV. Although our results are not general, they highlight the importance of accounting for the variation in both energy and capacity value of solar resources endogenously in capacity planning models. A11 numerical experiments are performed using the IEEE Reliability Test System and 7 years worth of demand and solar data from a utility in Arizona.

14 SOLAR ENERGY↗

Renewable Energy Requirements for Future Building Codes: Options for Compliance

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft 2 of roof area or 0.5 W/ft 2 of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft 2 of roof area. Section 5 of the report provides a basic framework for draft code language recommendations based on the analysis of the alternative compliance levels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Guideline requirements for serviceable spacecraft grasping/berthing/docking interfaces based on simulations and flight experience (survey paper)

As space vehicles and structures become larger and more complex, the development of systems to assist humans in assembling, operating, maintaining, and performing space rescue or retrieval of these vehicles and structures becomes increasingly important. With the diversity of international spacecraft, both manned and unmanned, planned to be in orbit in the future, a set of guidelines for berthing and docking subsystems is mandatory if servicing, resupply, and retrieval is to become practical on an international level. Successful interaction between these space systems and ground and/or space-based humans requires standardized and effective operational interface designs, particularly with respect to space grasping/berthing/docking interface mechanisms. This paper defines the spacecraft mechanical interfaces necessary to create a standard dynamic envelope for joining two free-flying spacecraft in a 'hard' berth or dock with each other in space. A review was made of past space flights and dynamics simulations dating back to 1962 to obtain necessary parameters and their values for successful manually controlled and autonomous spacecraft docking/berthing. The various spacecraft docking/berthing mechanisms and concepts are illustrated along with their dynamic capture and impact tolerances including maximum contact velocity along the approach axis and in the y-z plane; capture linear misalignment tolerances; and maximum capture roll, pitch, and yaw angles. From this data sets of recommended guidelines parameters were developed for autonomous and manual impact docking tolerances, non-impact grasping/berthing tolerances (end effectors), berthing contact conditions, and alignment tolerances after rigidizing. Also, detailed requirements were developed for mechanical design interface features, as well as latching, unlatching, and separation tolerances. This data was drafted in the form of a proposed ANSI Standard guideline, reviewed, and added to by members of the committee representing several spacecraft manufacturers, NASA, and the USAF, and a consensus was reached.

Thompson, Allen B.↗

Regulatory Design for Transport Security Regulations of Nuclear and Other Radioactive Material

A cornerstone within a nuclear security regime of a country is a legislative and regulatory framework that both regulates the individuals using radioactive and nuclear materials, but also regulates the regulators for their commitments under International Law. When drafting nuclear law and regulations, both technical and legal expertise is needed to ensure the regulation meets the technical requirements for security, but also is legally enforceable within a country’s jurisdiction. While the Primary Nuclear Law, or Enabling Act provides establishes the Competent Authority and responsibilities for nuclear security, regulatory development is where the proverbial, rubber meets the road for requirements. The regulations provide instruction for inspections, authorizations, and managed activities, such as use storage, and transport. Transport Security regulatory development for radioactive and nuclear material is complex because the regulation maybe multi-jurisdictional, multi-modal, and involve multiple stakeholders. Development of transport security regulations requires coordination with other ministerial stakeholders, transport operators, and alignment to international treaties and conventions outside the nuclear domain. This paper provides a brief discussion of the challenges associated with regulatory development for transport security regulations for nuclear and other radioactive materials in transport. The paper will briefly identify key stakeholders, international law involved, and current efforts by the International Atomic Energy Agency (IAEA) in supporting Member States in regulatory development. While active in that regulations are necessary for a robust nuclear security regime, regulatory development is more a slow-burn than an active activity in nuclear security.

Fialkoff, Marc↗

MODIS information, data and control system (MIDACS) operations concepts

The MODIS Information, Data, and Control System (MIDACS) Operations Concepts Document provides a basis for the mutual understanding between the users and the designers of the MIDACS, including the requirements, operating environment, external interfaces, and development plan. In defining the concepts and scope of the system, how the MIDACS will operate as an element of the Earth Observing System (EOS) within the EosDIS environment is described. This version follows an earlier release of a preliminary draft version. The individual operations concepts for planning and scheduling, control and monitoring, data acquisition and processing, calibration and validation, data archive and distribution, and user access do not yet fully represent the requirements of the data system needed to achieve the scientific objectives of the MODIS instruments and science teams. The teams are not yet formed; however, it is possible to develop the operations concepts based on the present concept of EosDIS, the level 1 and level 2 Functional Requirements Documents, and through interviews and meetings with key members of the scientific community. The operations concepts were exercised through the application of representative scenarios.

Han, D.↗

Definition of spacecraft standard interfaces by the NASA Space Assembly and Servicing Working Group (SASWG)

The purpose of the NASA Space Assembly and Servicing Working Group (SASWG) is to study enabling technologies for on-orbit spacecraft maintenance and servicing. One key technology required for effective space logistics activity is the development of standard spacecraft interfaces, including the 'Basic Set' defined by NASA, the U.S. Space Command, and industry panelists to be the following: (1) navigation aids; (2) grasping, berthing, and docking; and (3) utility connections for power, data, and fluids. Draft standards have been prepared and referred to professional standards organizations, including the AIAA, EIA, and SAE space standards committee. The objective of the SASWG is to support these committees with the technical expertise required to prepare standards, guidelines, and recommended practices which will be accepted by the ANSI and international standards organizations, including the ISO, IEC, and PASC.

Radtke, Robert↗

Development of a Technical Standard for Radiological Characterization of DAW - 18062

Throughout its 70+-year history, the U.S. Department of Energy (DOE) and its predecessor agencies have performed a wide mission involving nuclear materials and weapons development, production, testing, and modernization. While the initial mission components relied heavily upon reactor physics and chemistry, the environmental programs have increasingly relied upon development of more accurate and effective measurement methodologies to determine the radiological and chemical properties of the unique waste streams that were generated during the weapons production and testing mission. Over time, the DOE laboratories and former production sites have developed a wide range of site-specific processes and procedures for conducting radiological characterization of dry active waste (DAW) that is managed as low-level radioactive waste. This has resulted in a Complex-wide variability among sites with respect to the methodologies and instrumentation used to characterize individual waste streams. The DAW-type waste was selected for development of a characterization standard since it is a simple, voluminous, and repetitive waste stream with a substantial knowledge base, established experience history at multiple site locations, and the potential for realization of programmatic benefits though standardization. The Energy Facility Contractors Group (EFCOG) Waste Management Working Group (WMWG) has proposed the development of a new DOE Technical Standard for radiological characterization of DAW. The purpose of the proposed new standard is to provide a technical resource that integrates and enhances the utilization of current site-specific methodologies and processes. A Technical Basis Document (TBD) has been prepared to support the development and utilization of the new standard by providing detailed information for use by site personnel when implementing the guidance provided in the standard. It also provides the rationale for and details concerning the recommended technical approaches for radiological characterization of representative DAW-type waste streams. The TBD will be included as an appendix to the proposed standard. Adoption of a standardized approach to DAW characterization will take advantage of multiple applications for a technology that is both mature and stable. The DAW characterization process is repetitive and lends itself to implementation at a wide range of operating locations - resulting in economies of scale, compliance with regulatory requirements, and consistent implementation of procedures which support design, operations, maintenance, and management of facilities, activities and programs. The purpose of the proposed new Technical Standard for DAW Radiological Characterization is to integrate and improve the utilization of current site-specific methodologies and processes and will include a comprehensive evaluation and comparison of current radiological characterization methodologies to determine which ones are most reliable and effective in producing relevant and valid data. In view of the long history and participation by several agencies in the regulation of nuclear programs, existing Voluntary Consensus Standards have also been reviewed for relevancy and applicability to the new proposed standard. The proposed new Standard will be developed in concert with existing scientific and regulatory guidance to produce a document that incorporates the state of current knowledge and site practices with a graded approach to applying those methodologies that are applicable and effective for characterizing a wide range of DAW-type wastes - including, but not limited to, debris, low specific activity (LSA) material, and surface contaminated objects (SCO). Under the leadership of the National Laboratory Subgroup of the EFCOG/WMWG), an EFCOG team will develop the proposed technical standard. This process will incorporate the information gathered during preparation of the TBD, which will serve as a technical resource to support the technical approach for selection of DAW characterization methodologies. Preparation of the TBD included a detailed survey of historical site practices and examination of the characterization approaches and measurement methodologies currently being applied to DAW-type wastes. Future activities include the development and submittal of a Project Justification Statement that will be submitted to the DOE Technical Standards Program for review and comment. The EFCOG/WMWG Team will respond to reviewer comments, as required. Following final concurrence by affected organizations through the DOE Technical Standards Coordination process, the EFCOG/WMWG Team will prepare the draft technical standard and respond to comments generated during RevCom review and final format review by the DOE Technical Standards Management Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste-Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Vitrification Melter - 12167

The Department of Energy (DOE) has determined that the vitrification melter used in the West Valley Demonstration Project can be disposed of as low-level waste (LLW) after completion of a waste-incidental-to-reprocessing evaluation performed in accordance with the evaluation process of DOE Manual 435.1-1, Radioactive Waste Management Manual. The vitrification melter - which consists of a ceramic lined, electrically heated box structure - was operated for more than 5 years melting and fusing high-level waste (HLW) slurry and glass formers and pouring the molten glass into 275 stainless steel canisters. Prior to shutdown, the melter was decontaminated by processing low-activity decontamination flush solutions and by extracting molten glass from the melter cavity. Because it could not be completely emptied, residual radioactivity conservatively estimated at approximately 170 TBq (4,600 Ci) remained in the vitrification melter. To establish whether the melter was incidental to reprocessing, DOE prepared an evaluation to demonstrate that the vitrification melter: (1) had been processed to remove key radionuclides to the maximum extent technically and economically practical; (2) would be managed to meet safety requirements comparable to the performance objectives for LLW established by the Nuclear Regulatory Commission (NRC); and (3) would be managed by DOE in accordance with DOE's requirements for LLW after it had been incorporated in a solid physical form with radionuclide concentrations that do not exceed the NRC concentration limits for Class C LLW. DOE consulted with the NRC on the draft evaluation and gave other stakeholders an opportunity to submit comments before the determination was made. The NRC submitted a request for additional information in connection with staff review of the draft evaluation; DOE provided the additional information and made improvements to the evaluation, which was issued in January 2012. DOE considered the NRC Technical Evaluation Report as well as comments received from other stakeholders prior to making its determination that the vitrification melter is not HLW, does not require permanent isolation in a geologic repository, and can be disposed of as LLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering Drawing Practices: Volume I of I - Aerospace and Ground Support Equipment

KSC-GP-435,Engineering Drawing Practices, Volume I of II, Aerospace and Ground Support Equipment, establishes the conventions to be adhered to by engineering and drafting personnel in the preparation, revision, and completion of engineering digital product definition data sets. This manual sets forth the minimum requirements acceptable at Kennedy Space Center (KSC) for the preparation of model-only, model and dependent drawing, and drawing-only digital product definition data sets based on the engineering drawing and model requirements in the ASME Y14 series.

Wendy Ledezma↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Main Power Distribution Unit for the Jupiter Icy Moons Orbiter (JIMO)

Around the year 2011, the Jupiter Icy Moons Orbiter (JIMO) will be launched and on its way to orbit three of Jupiter s planet-sized moons. The mission goals for the JIMO project revolve heavily around gathering scientific data concerning ingredients we, as humans, consider essential: water, energy and necessary chemical elements. The JIM0 is an ambitious mission which will implore propulsion from an ION thruster powered by a nuclear fission reactor. Glenn Research Center is responsible for the development of the dynamic power conversion, power management and distribution, heat rejection and ION thrusters. The first test phase for the JIM0 program concerns the High Power AC Power Management and Distribution (PMAD) Test Bed. The goal of this testing is to support electrical performance verification of the power systems. The test bed will incorporate a 2kW Brayton Rotating Unit (BRU) to simulate the nuclear reactor as well as two ION thrusters. The first module of the PMAD Test Bed to be designed is the Main Power Distribution Unit (MPDU) which relays the power input to the various propulsion systems and scientific instruments. The MPDU involves circuitry design as well as mechanical design to determine the placement of the components. The MPDU consists of fourteen relays of four different variations used to convert the input power into the appropriate power output. The three phase system uses 400 Vo1ts(sub L-L) rms at 1000 Hertz. The power is relayed through the circuit and distributed to the scientific instruments, the ION thrusters and other controlled systems. The mechanical design requires the components to be positioned for easy electrical wiring as well as allowing adequate room for the main buss bars, individual circuit boards connected to each component and power supplies. To accomplish creating a suitable design, AutoCAD was used as a drafting tool. By showing a visual layout of the components, it is easy to see where there is extra room or where the components may interfere with one another. By working with the electrical engineer who is designing the circuit, the specific design requirements for the MPDU were determined and used as guidelines. Space is limited due to the size of the mounting plate therefore each component must be strategically placed. Since the MPDU is being designed to fit into a simulated model of the spacecraft systems on the JIMO, components must be positioned where they are easily accessible to be wired to the other onboard systems. Mechanical and electrical requirements provided equally important limits which are combined to produce the best possible design of the MPDU.

Papa, Melissa R.↗