Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,567 records · Page 87

Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operations (SUMMER-GO): Project Final Report

The Solar Uncertainty Management and Mitigation for Exceptional Reliability in Grid Operation (SUMMER-GO) project was recently completed through a collaboration among the National Renewable Energy Laboratory, Maxar, the Electric Reliability Council of Texas (ERCOT), the University of Texas at Dallas, the University of California Berkeley, and the University of Colorado Boulder. The project made significant advances in probabilistic solar power forecasting, both through the development of Bayesian model averaging methods for ensemble forecasting and in bringing these and other advancements into practice with Maxar's delivery of operational forecasts to ERCOT. In addition to creating more reliable solar power forecasts, the project developed methods for their utilization in power system operations. These include the development of risk-aware unit commitment and economic dispatch algorithms and methods to reformulate probabilistic forecasts to be used in these power system operational models. Dynamic power system reserve methods were also developed, which have been shown in silico to create economic savings and reliability improvements on an ERCOT-like system as well as financial savings in the ERCOT system through more granular consideration of the uncertainty associated with solar power forecasts. Finally, a situational awareness tool to help grid operators better understand solar power forecast uncertainty in daily operations was developed and extensively vetted.

14 SOLAR ENERGY↗

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lawrence Livermore National Laboratory Livermore Site: 4200 Block Development Project Soil Sampling and Analysis Plan (June 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Maintenance Shop Facility in the 4200 Block (project). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Software Contribution to the L-CAPE project

The L-CAPE project utilizes asynchronous data from thousands of Linear Accelerator devices and applies data science techniques to detect anomaly of accelerator failure before the incident, as well as automatic labels of accelerator outages. The author describes her contribution progress for the L-CAPE project this summer, as well as suggestions for future interns working on the project.

Tang, Jasmine↗

Conduct of Engineering Project Engineer Qualification Standard

This document describes the training and qualification requirements for the Project Engineer (PE) position at the Los Alamos National Laboratory (LANL). Analysis indicates that the Project Engineer position is not required to meet the requirements of DOE Order 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities for “Technical Staff” positions. However, Engineering Services Division (ESD) has decided to hold their Project Engineers to a higher professional standard by developing a qualification program for the PEs.

42 ENGINEERING↗

Accelerating the Deployment of Advanced Energy Communities: The Oakland EcoBlock A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project

This report describes the design development process and recommendations of a Community-Scale Zero Net Energy Master Plan for a residential block in Oakland, the Oakland EcoBlock. The recommended master plan includes an integrated system of energy efficiency retrofits, a direct current solar/storage/electric vehicle microgrid, alternating/direct current houses, and water efficiency retrofits with rainwater capture. The recommended master plan is projected to be close to zero-net energy (95 percent) for homes, reduce carbon emissions by 65 percent at the block scale (including transportation), and reduce water use 60–70 percent. The integrated system of energy efficiency and a direct current solar/storage/electric vehicle (EV) charging microgrid is the first of its kind at the residential block scale. This breakthrough because the deep energy efficiency retrofit savings free up enough capacity in the solar supply and storage to enable residents to switch from natural gas to electricity for heating and domestic hot water and to provide EV charging for 33 percent of vehicle miles traveled. The savings in household transportation costs are a game changer because when combined with savings in the electric and water utility bills, the total cash flow savings are projected to fund the capital improvements of the proposed systems. This project’s benefits include lower and more predictable utility bills; greater resiliency because the system can operate during outages, and vastly improved indoor air quality by reducing natural gas consumption. The local energy storage reduces peak demand for the utility. California benefits from a model that exceeds the targets for reductions in energy consumption and carbon emissions and the reductions in water use address California’s severe water challenges. The Oakland EcoBlock is a transformative model for accelerating the rapid deployment of advanced energy communities.

decarbonization codes↗

An Environmental Approach for Construction, Operation, and Maintenance of Floating Solar Array Renewable Energy Projects on Army Installations

The U.S. Army Office of Energy Initiatives (OEI) has primary responsibility over renewable projects to help achieve the Army’s renewable energy goals. The OEI serves as the central management office for partnering with U.S. Army installations to implement cost-effective, renewable energy projects, leveraging private sector financing. Siting, construction, and operation of solar power systems on U.S. Army installations help to achieve renewable energy goals. This report provides a general framework for environmental analysis for the siting, construction, and operation of floating solar renewable energy projects on U.S. Army installations, to include joint bases managed by the Department of the Army. This report includes specific information by resource area regarding the potential environmental impacts and probable best management practices or minimization approaches that afford environmental protection. This report provides analyses and suggestions that could support a programmatic analysis or site-specific action.

14 SOLAR ENERGY↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Safety Basis Compliant Flexible Operations [Capstone Project]

Compliant nuclear operations must be weighed against the radiological risk to the worker, public, and the environment. This project set out to look at one facility at Los Alamos National Laboratory (LANL or the Laboratory) and compare the risk with the operational restrictions associated with the Technical Safety Requirements (TSRs). The hope was to identify controls that could be reduced or simplified while maintaining compliance with 10 CFR 830, Nuclear Safety Management. This would result in increasing facility operational flexibility and efficiency. Controls were identified to be simplified or eliminated based on risk. This identification was initially envisioned from the perspective of reanalysis of the accident and hazard analysis consequences. Additionally, it was envisioned that fire testing could show that the consequences of a fire are not as dramatic as analyzed. Specific facility controls were identified that cause operational inefficiencies. Based on data collection, two controls were identified for further evaluation. The first control was combustible loading within the waste storage buildings, and the second control is related to the seismic power cutoff switch. In evaluating the combustible loading control, the thought is that the fire suppression system (FSS) provides adequate protection and the combustible loading controls do not need elevation to a TSR control. The FSS, along with the Fire Protection Program, would provide protection to prevent a fire from impacting large amounts of stored waste material. The seismic switch was more of a challenge. When reviewing the facility operation, it was determined that the facility does not operate anywhere near the established material-at-risk (MAR – radioactive material) limits. By adjusting these limits, a reduced consequence could be achieved and hence, a significant risk reduction achieved. A new operating mode would be used to achieve this reduction. A reduced MAR limit was successfully used as a test case for snow removal during this project. This project expands on that trial case as related to combustible loading and the seismic power cutoff switch TSRs. This will increase the efficiency of operations with reduced TSR controls while reducing overall facility risk. This is a win-win situation for Triad National Security, LLC (Triad) and the U.S. Department of Energy (DOE). Due to schedule and budgetary constraints, not all envisioned work scope was accomplished. However, it is maintained in this report for future efforts.

61 RADIATION PROTECTION AND DOSIMETRY↗

Building 871 and 874 Retaining Wall Project Soil Sampling and Analysis Plan

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Functional Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed retaining wall near Buildings 871 and 874 (project) (Figure 1). The purpose of the SAP is to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction. This SAP follows criteria established in Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which was formalized in accordance with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006) and the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) guidance (U.S. NRC, U.S. EPA, U.S. DOE, and U.S. DOD 2000). The scope of this SAP is based on preliminary design information provided by PMO.

54 ENVIRONMENTAL SCIENCES↗

Advanced Algorithms for Scrutiny of Mandatory State Reports Declarations to the IAEA (Final Project Report)

In compliance with their Comprehensive Safeguards Agreements, based on INFCIRC/153 (corrected) (International Atomic Energy Agency, 1972), States Party to the Treaty on the NonProliferation of Nuclear Weapons (NPT) are obligated to declare to the International Atomic Energy Agency (IAEA) all changes in their nuclear material inventory as well as movement of the material across boundaries of IAEA recognized material balance areas (MBA), inventories and nuclear material balances. This project addresses capabilities to detect irregularities in State reports, thus ensuring their accuracy and completeness, and in the broader context, States’ compliance with safeguards obligations of the NPT. A recent study (Henzl et al., 2022) (lead by this project’s PI) demonstrated how analysis of dynamic correlations in nuclear material movement within the entire fuel cycle of a State (viewed as a single system) can reveal variances consistent with and indicative of “irregular” activities. Expanding on this concept, novel ways to analyze State declarations themselves—again, for the State as a whole entity—will help the IAEA draw accurate safeguards conclusions and trust the validity and authenticity of Stategenerated declaration reports. Introducing new declaration analyses capabilities explored in this project will help to provide credible assurance of both the non-diversion of nuclear material from declared activities and of the absence of undeclared nuclear material and activities in the State in general.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Hawaii Solar Desalination Project

This project built the world’s largest Forward Osmosis (FO) solar thermal desalination plant at the NELHA Hawaii Ocean Science and Technology Park for a high visibility “on sun” demonstration of seawater desalination for agricultural applications. The project included re-commissioning an existing 2MW micro-dish solar thermal array and coupling it to a next-generation 500m3/day FO system. The purpose of the project was to validate FO at commercial scale; to verify that the water produced is safe for potential downstream agricultural users; to gather data on capital cost, energy consumption and operating expense for the technology; and to demonstrate that FO can be successfully coupled to low-grade thermal resources. The plant implemented advancements in FO component technology, including hot nano-filtration, polymeric heat exchangers, draw solutions, and improved FO membranes, and operated from June 2022 to September 2023 - producing 30gpm of permeate water. Thermal energy was below 30kWh/m 3 during operation, establishing a new benchmark in thermal desalination technology, with recovery rates at times exceeding 65%, well above what commercial RO systems can achieve. Combining the plant capital cost (CAPEX) and the operating expenses (OPEX) yields a Levelized Cost of Water (LCOW) that is competitive with existing carbon-intensive technologies such as RO. The ability of the plant to operate from a renewable resource paves the way toward a low-carbon desalination future using low-grade thermal resources.

14 SOLAR ENERGY↗

Representative Project Design Envelope for Floating Offshore Wind Energy: A Focus on the California 2023 Federal Leases

NREL developed recommendations for a representative project design envelope (RPDE) for floating offshore wind energy projects in the California lease areas, considering industry feedback from offshore wind farm developers. The RPDE provides estimates of minimum and maximum values for project design parameters that are relevant for assessing environmental impacts. The design envelope considers the practical range of technology options that may be deployed and accounts for major physical constraints, technology feasibility, and supply chain readiness. In addition to the RPDE, this report presents four scenarios that illustrate some of the differences between technologies that could be used offshore California, as well as descriptions of the typical installation processes that are expected to be used for floating offshore wind farms.

17 WIND ENERGY↗

Efficient Hybrid Attack Graph Generation for Cyber-Physical System Resilience Experimentation (Final Project Report)

HAGEN project has developed theory, algorithms, and capabilities to assist cyber physical system modelers and operators to perform system and device-level vulnerability assessment, risk assessment, impact assessment, and mitigation planning. The project generates hybrid attack graphs for Cyber-Physical System (CPS) resilience experimentation at desired scale and speed. The project will produce composite attack datasets, algorithms, and demonstrable prototypical tools, and a library of high-impact attack sequences for a given CPS of interest. This report provided overall summary of research and development performed between FY22-24.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Advances in the PIP-II Project and the Indian Institutions & Fermilab Collaboration

The Proton Improvement Plan – II (PIP-II) project at Fermi National Accelerator Laboratory (Fermilab) is the first particle accelerator project in the USA to receive significant in-kind contributions from international partners. Partnering countries include the USA, India, Italy, the United Kingdom, France, and Poland. When completed, PIP-II will accelerate protons to 800 MeV, and power the world’s most intense neutrino beam for the Deep Underground Neutrino Experiment (DUNE). Technological advancements for PIP-II across the entire collaboration have significantly matured, with the project currently in the construction phase. The Indian Institutions & Fermilab Collaboration (IIFC) for PIP-II has a 14+ years history. The IIFC R&D phase concluded with the validation of various prototypes and defined the beginning of the construction phase. This presentation highlights the advances of the synergistic PIP-II collaboration. Work supported, in part, by the U.S. Department of Energy, Office of Science, Office of High Energy Physics, under U.S. DOE Contract No. 89243024CSC000002.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Laboratory Directed Research and Development Program: FY 2024 Completed Projects Report

Oak Ridge National Laboratory (ORNL) is the US Department of Energy’s (DOE’s) largest multiprogram science, technology, and energy laboratory. It possesses distinctive capabilities in a variety of fields, such as neutron science, computing, advanced materials, and nuclear science and technology. Using these capabilities, ORNL conducts basic and applied research and development (R&D) to support DOE’s overarching mission “to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions.” As a national resource, ORNL also applies its capabilities and skills to the specific needs of other federal agencies and customers through the DOE Strategic Partnership Projects (SPP) Program. Information about the laboratory and its programs is available on the ORNL website. The Laboratory Directed Research and Development (LDRD) Program at ORNL operates under the authority of DOE Order 413.2C, Laboratory Directed Research and Development,3 which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. The LDRD Program funds are obtained through a charge to all laboratory programs. Although it represents a relatively small portion of the overall research budget, the LDRD Program plays an essential role in maintaining the laboratory’s ability to respond to national needs. The program allows ORNL to improve its distinctive capabilities and to enhance its ability to conduct cutting-edge R&D. In accordance with the DOE order, R&D projects funded through the LDRD Program at ORNL support the goals of • maintaining the scientific and technical vitality of the laboratory; • enhancing the laboratory’s ability to address future DOE missions; • fostering creativity and stimulating exploration of forefront areas of science and technology; • serving as a proving ground for new concepts in R&D; and • supporting high-risk, potentially high-value R&D. This report provides an overview of the LDRD Program at ORNL in FY 2024 and contains summaries of all the LDRD research projects that concluded between October 1, 2023, and September 30, 2024.

99 GENERAL AND MISCELLANEOUS↗

University of Hawai‘i, Shallow Geothermal Resources: Energy Technology Innovation Partnership Project (Final Report)

Scientists at Lawrence Berkeley National Laboratory (Berkeley Lab) have teamed up with the University of Hawai‘i at Manoa (UH Manoa) through the U.S. Department of Energy’s Energy Technology Innovation Partnership Project to evaluate the technological and market feasibility of shallow geothermal heat exchanger (GHE) technology. UH requested this analysis to evaluate opportunities in building cooling, energy efficiency, and emissions reduction applications in Hawai‘i. UH has an abundance of geologic and geothermal data and is looking to the national labs’ expertise to execute this analysis. UH is also interested in investigating policy, regulatory, and business conditions advantageous for implementation of a pilot project and more broad deployment of this technology in Hawai‘i. In many locations around the world, the demands for heating and cooling are roughly balanced over the course of the year, so GHEs do not cause significant long-term changes in subsurface temperature. This is not the case in Hawai’i, where the demand for heating is very small, meaning that, over time, GHEs will add heat to the subsurface. If temperatures increase significantly, GHE systems will not work as designed. Regional groundwater flow has the potential to sweep heated water away from boreholes, thereby maintaining the functionality of the GHE system. Significant regional groundwater flow requires two things: a sufficiently large driving hydraulic head gradient (usually closely related to surface topography), and sufficient porosity and permeability to enable groundwater to flow in large enough quantities to enable near-borehole temperatures to be maintained at ambient values. Hawai‘i’s volcanic terrain offers ample surface topographic variation. The lava itself shows an extremely large range of porosity and permeability, so sites with large enough values of these properties must be selected. Numerical modeling of coupled groundwater and heat flow can be used to determine how large is large enough. Primarily, closed-loop systems have been investigated. Other options considered are open-loop systems and using cool seawater as the chilling source. Project work investigated the feasibility of GHE technology at two scales. At the island scale, GIS layers of various attributes relevant for GHE were combined to develop an overall favorability map for employing GHE in Hawai‘i. At the local scale, a hydrogeologic model for the subsurface component of a closed-loop system was developed for the Stan Sheriff Center at the UH Manoa campus. This site is considered promising because the rock below and immediately downgradient of the borefield is highly permeable, consisting of a subsurface karst system (limestone containing high-permeability open channels), which is underlain by a thick, high-permeability fractured basalt. Moreover, the site is near the base of the Ko‘olau Range, providing a large hydraulic head gradient. Thus, groundwater flow through the site is expected to be large, enabling efficient removal of heated groundwater. A full-GHE-system model of the site was also developed, with a simplified representation of the subsurface, in which groundwater flow is not considered and heat transfer is purely by conduction. Using the building cooling load data provided by UH, simulation results show that with groundwater flow present, a GHE can operate successfully for at least 10 years, but with no groundwater flow, the subsurface begins to heat up after only one year of operation, making the GHE unviable within 2-6 years. The team also developed a techno-economic model for this site to compare the cost of cooling using a GHE system with the costs of operating the current air-conditioning system. The GHE system is advantageous economically if favorable tax incentives and interest rates can be obtained.

15 GEOTHERMAL ENERGY↗

New NDA Methods for Thorium Fuel Cycle Safeguards (Mid-Project Report)

This project is developing new Non-Destructive Assay (NDA) safeguards techniques for emergent thorium fuel cycles based on Neutron Resonance Transmission Analysis (NRTA), which can assay 233 U and 235 U when they are present together in a sample with potentially high gamma-ray backgrounds from fission products and 232 U. Existing passive techniques face large challenges for this task so new active interrogation methods are needed. This effort is also exploring how gamma-ray signatures can complement NRTA for enhanced assayed performance. This project leverages an NRTA system being developed at PNNL in collaboration with MIT, which uses a commercially available deuterium-tritium neutron generator at short standoff (~2 m). We aim to assess the feasibility and performance of these new NDA techniques for the range of relevant samples in thorium fuel cycles. Key advancements described in this mid-project report include NRTA system design for thorium safeguards measurements, characterization of 233 U oxide powder at PNNL, a survey of detector technologies suitable for NRTA in high gamma background environments, successful preliminary demonstration of a quantitative isotopic estimation algorithm, and first NRTA measurements of a thorium sample.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗