Engineering Papers⌕ Search

DOE OSTI · 1974448

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

Abstract

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Chhaya, Sunil. 2023-04-30. Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report). https://doi.org/10.2172/1974448

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Nodal capacity expansion planning with flexible large-scale load siting

We propose explicitly incorporating large-scale load siting into a stochastic nodal power system capacity expansion planning model that concurrently co-optimizes generation, transmission, and storage expansion. The potential operational flexibility of some of these large loads is also taken into account by considering them as consisting of a set of tranches with different reliability requirements, which are modeled as a constraint on expected served energy across operational scenarios. We implement our model as a two-stage stochastic mixed-integer optimization problem with cross-scenario expectation constraints. To overcome the challenge of scalability, we build upon existing work to implement this model on a high performance computing platform and exploit scenario parallelization using an augmented Progressive Hedging Algorithm. The algorithm is implemented using the bounding features of mpisppy, which have shown to provide satisfactory provable optimality gaps despite the absence of theoretical guarantees of convergence. We test our approach and assess the value of this proactive planning framework on total system cost and reliability metrics using realistic testcases geographically assigned to San Diego and South Carolina, with datacenter and direct air capture facilities as large loads.

24 POWER TRANSMISSION AND DISTRIBUTION↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗