IDC Reengineering Phase 2 Project Scope

The Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO) operates the International Data Centre (IDC) to support treaty verification activities by Member States. The IDC collects, stores, processes, and distributes data from seismic, hydroacoustic, infrasound, and radionuclide stations. A significant component of the IDC is the seismic, hydroacoustic, and infrasound (SHI) processing system. The IDC has recognized the need to reengineer the SHI processing system and has defined a three-phase reengineering effort. IDC Reengineering Phase 1 (RP1) started in 2011 with the goal to significantly modernize SHI automatic and interactive data processing software, focusing on enhancements to individual components of the system. Reengineering Phase 2 (RP2), started in 2014, addresses the task of specifying a unified architecture for all SHI software, across processing stages, to pave the way for further software development and sustainment in the future. A key objective of RP2 is an architecture sufficient to provide a basis for a cost estimate for the development or enhancement of the software components and subsystems. This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system.This report expands upon the “Scope for IDC Reengineering Phase 2”, July 2014, ECS-DIS-WGB-43-PTS-MATERIAL-12-ADD-1, produced by the IDC.

58 GEOSCIENCES↗

Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗

Recovery of Rare Earth Elements (REEs) from Coal Mine Drainage, Phase 2

Phase 1 research identified a two-step refining train, acid leaching of AMD precipitate feed followed by solvent extraction (SX), to produce a 2% TREE product. For the Phase 2 bench scale system, the objective was to get the acid leaching step to operate in batch-mode with sufficient storage capacity to feed an aqueous, enriched REE liquor to a pilot SX plant operating in continuous-mode at a feed rate capable of producing 3 g/hr 2% TREE. Important process variables included feed rate, extractant makeup, flowsheet configuration, and stripping conditions. Operating parameters were optimized through a feedback-capable SCADA system configured for the SX bench scale plant. These conditions were met and exceeded. TREE grades approaching 90% were produced while our Techno-Economic Assessment indicated highly favorable economic returns. The project led to the design of a pilot facility for producing roughly 500 kg/TREE/year. That plant is now in the procurement stage with constructed expected to begin in late 2020.

01 COAL, LIGNITE, AND PEAT↗

Sister Rod Destructive Test Results (FY19)

This report documents work performed under the Spent Fuel and Waste Disposition, Spent Fuel and Waste Science and Technology program for the US Department of Energy (DOE) Office of Nuclear Energy (NE). This work was performed to fulfill Level 2 Milestone M2SF-19ORO010201026 within work package SF-19OR01020102 and is an update to the work reported in M2SF-19OR010201028 and M3SF-19OR010201027. The document incorporates comments received with respect to the previous reports and incorporates additional test results. As a part of the US Department of Energy (DOE) Office of Nuclear Energy (NE) High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 gigawatt days per metric ton uranium) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called the “sister rods,” are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zircaloy-4 (LT Zirc-4), ZIRLO ® , and M5 ® . The DEs are being conducted to obtain a baseline of the HBU rod’s condition prior to dry storage and are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding will be tested to derive material properties. While the data generated can be used for multiple purposes, a primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and consolidation activities. This report documents the status of the ORNL Phase I DEs of 8 sister rods and outlines the DE tasks performed and the data collected to date, as guided by the sister rod test plans. The DEs are performed using a phased approach, and the Phase 1 DEs being performed at ORNL include: • full-length rod heat treatments (FHT) of 3 selected sister rods to examine the effects of temperatures reached during dry storage preparation, • rod internal pressure and void volume measurements of the 3 FHT rods and 3 corresponding baseline rods, as well as 2 additional rods selected for depressurization/gas transmission tests and fatigue lifetime tests, • fission gas sampling and analysis, • depressurization and gas transmission tests, • rough segmentation of the selected rods for mechanical tests and rod characterization, • fuel sampling and burnup analysis, • metallography, • cladding total hydrogen measurements, • mechanical testing, including fatigue lifetime (CIRFT), four-point bend, axial tension, microhardness, ring compression, and burst tests. Table S-1 provides a summary of the DE status. The mechanical testing will be performed using fueled segments and is expected to complement previous and current mechanical test results using defueled cladding segments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US-UK Phase 3 Task 1 Oxidation in Supercritical Fluids

A presentation of the US-UK Phase 3 Task 1 Oxidation in Supercritical Fluids. Includes slides on Supercritical Steam, sCO 2 Power Cycles – Indirect, sCO 2 Power Cycles – Direct, Experimental Exposures, Alloys, Why Si, Results—Ni-xCr Alloys (5-24Cr), Fatigue Crack Growth$-$Experiment, and Alloys and Samples, Fatigue Crack Growth—Results (H282).

Holcomb, Gordon R.↗

Regenerable biocide delivery unit, volume 1

The Microbial Check Valve (MCV), which is currently used aboard the Shuttle Orbiter for disinfection of the potable water supply, is an expendable flow-through canister containing iodinated ion exchange resin. Means for extension of MCV life are desirable to avoid resupply penalties. The Phase 1 Regenerable Biocide Delivery Unit program demonstrated the feasibility of regenerating an MCV in situ, using a strong aqueous elemental iodine solution resulting from diversion of the MCV influent to a packed bed containing iodine crystals. In small column tests, eight manual regenerations of an MCV resin were accomplished. The term Regenerative Microbial Check Valve (RMCV) was adopted describing this new technology. The Phase 2 program resulted in the development of a full scale and fully autonomous prototype RMCV, capable of maintaining residual I(sub 2) levels between 2.0 - 4.0 mg/L for prolonged periods. During six months of testing at the Space Station baseline flow rate of 120 cm(sup 3)/min, the prototype RMCV underwent nine regenerations. RMCV life cycle tests, using a variety of influent streams, were conducted over an eighteen month period to determine the useful lives of MCV's incorporating this new technology and to determine ultimate failure mechanisms. MCV life extensions of 130 fold were demonstrated, limited only by the Phase 2 performance period. Based upon this work, it is certain that RMCV units can be developed to provide unattended biocide addition for the thirty year life of Space Station Freedom, or for other longer duration applications such as a Lunar Base or Mars mission. RMCV technology was also demonstrated capable of delivering, on demand, a concentrated aqueous I(sub 2) solution for potential use as a disinfectant during transient episodes of microbial surface contamination, for the control of biofilm formation, or as a preventative measure in systems which are particularly susceptible to the growth of microorganisms.

Atwater, James E.↗

Experimental clean combustor program, phase 2

The primary objectives of this three-phase program are to develop technology for the design of advanced combustors with significantly lower pollutant emission levels than those of current combustors, and to demonstrate these pollutant emission reductions in CF6-50C engine tests. The purpose of the Phase 2 Program was to further develop the two most promising concepts identified in the Phase 1 Program, the double annular combustor and the radial/axial staged combustor, and to design a combustor and breadboard fuel splitter control for CF6-50 engine demonstration testing in the Phase 3 Program. Noise measurement and alternate fuels addendums to the basic program were conducted to obtain additional experimental data. Twenty-one full annular and fifty-two sector combustor configurations were evaluated. Both combustor types demonstrated the capability for significantly reducing pollutant emission levels. The most promising results were obtained with the double annular combustor. Rig test results corrected to CF-50C engine conditions produced EPA emission parameters for CO, HC, and NOX of 3.4, 0.4, and 4.5 respectively. These levels represent CO, HC, and NOX reductions of 69, 90, and 42 percent respectively from current combustor emission levels. The combustor also met smoke emission level requirements and development engine performance and installation requirements.

Gleason, C. C.↗

Microwave measurement of the solid propellant pressure-coupled response function

The results of an investigation are presented on the applicability of a microwave Doppler shift technique for directly determining propellant response functions over the desired frequency range. The investigation consisted of three phases. In Phase 1 the validity of the technique was established by comparing measured pressure-coupled response function data to existing data from T-burners and rotating valve tests. In Phase 2 a new microwave burner-pressure modulation system capable of achieving frequencies and mean chamber pressures of at least 1500 Hz and 10.5 MPa (1500 psia), respectively, was developed. During Phase 3 test firings are being carried out to define the frequency limit, response function resolution, and precision of the new design.

Strand, L. D.↗

Solar dynamic power for space station freedom

The Space Station Freedom Program is presently planned to consist of two phases. At the completion of Phase 1, Freedom's manned base will consist of a transverse boom with attached manned modules and 75 kW of available electric power supplied by photovoltaic (PV) power sources. In Phase 2, electric power available to the manned base will be increased to 125 kW by the addition of two solar dynamic (SD) power modules, one at each end of the transverse boom. Power for manned base growth beyond Phase 2 will be supplied by additional SD modules. Studies show that SD power for the growth eras will result in life cycle cost savings of $3 to $4 billion when compared to PV-supplied power. In the SD power modules for Space Station Freedom, an offset parabolic concentrator collects and focuses solar energy into a heat receiver. To allow full power operation over the entire orbit, the receiver includes integral thermal energy storage by means of the heat of fusion of a salt mixture. Thermal energy is removed from the receiver and converted to electrical energy by a power conversion unit (PCU) which includes a closed brayton cycle (CBC) heat engine and an alternator. The receiver/PCU/radiator combination will be completely assembled and charged with gas and cooling fluid on Earth before launch to orbit. The concentrator subassemblies will be pre-aligned and stowed in the orbiter bay before launch. On orbit, the receiver/PCU/radiator assembly will be installed as a unit. The pre-aligned concentrator panels will then be latched together and the total concentrator attached to the receiver/PCU/radiator by the astronauts. After final electric connections are made and checkout is complete, the SD power module will be ready for operation.

Labus, Thomas L.↗

Solar dynamic power for Space Station Freedom

The Space Station Freedom Program is presently planned to consist of two phases. At the completion of Phase 1, Freedom's manned base will consist of a transverse boom with attached manned modules and 75 kW of available electric power supplied by photovoltaic (PV) power sources. In Phase 2, electric power available to the manned base will be increased to 125 kW by the addition of two solar dynamic (SD) power modules, one at each end of the transverse boom. Power for manned base growth beyond Phase 2 will be supplied by additional SD modules. Studies show that SD power for the growth eras will result in life cycle cost savings of $3 to $4 billion when compared to PV-supplied power. In the SD power modules for Space Station Freedom, an offset parabolic concentrator collects and focuses solar energy into a heat receiver. To allow full power operation over the entire orbit, the receiver includes integral thermal energy storage by means of the heat of fusion of a salt mixture. Thermal energy is removed from the receiver and converted to electrical energy by a power conversion unit (PCU) which includes a closed brayton cycle (CBC) heat engine and an alternator. The receiver/PCU/radiator combination will be completely assembled and charged with gas and cooling fluid on earth before launch to orbit. The concentrator subassemblies will be pre-aligned and stowed in the orbiter bay before launch. On orbit, the receiver/PCU/radiator assembly will be installed as a unit. The pre-aligned concentrator panels will then be latched together and the total concentrator attached to the receiver/PCU/radiator by the astronauts. After final electric connections are made and checkout is complete, the SD power module will be ready for operation.

Labus, Thomas L.↗

Magnetite in Martian Meteorite Mil 03346 and Gusev Adirondack Class Basalt: Moessbauer Evidence for Variability in the Oxidation State of Adirondack Lavas

The Moessbauer spectrometers on the Mars Exploration Rovers Spirit (Gusev crater) and Opportunity (Meridiani Planum) have returned information on the oxidation state of iron, the mineralogical composition of Fe-bearing phases, and the distribution of Fe among oxidation states and phases [1,2,3]. To date, ~100 and ~85 surface targets have been analyzed by the Spirit and Opportunity spectrometers, respectively. Twelve component subspectra (8 doublets and 4 sextets) have been identified and most have been assigned to mineralogical compositions [4]. Two sextet subspectra result from the opaque and strongly magnetic mineral magnetite (Fe3O4 for the stoichiometric composition), one each for the crystallographic sites occupied by tetrahedrally-coordinated Fe3+ and by octahedrally-coordinated Fe3+ and Fe2+. At Gusev crater, the percentage of total Fe associated with magnetite for rocks ranges from 0 to ~ 35% (Fig. 1) [3]. The range for soils (~5 to ~12% of total Fe from Mt, with one exception) is narrower. The ubiquitous presence of Mt in soil firmly establishes the phase as the strongly magnetic component in martian soil

Morris, R. V.↗

Magnetite in Martian Meteorite Mil 03346 and Gusev Adirondack Class Basalt: Mossbauer Evidence for Variability in the Oxidation State of Adirondack Lavas

The Moessbauer spectrometers on the Mars Exploration Rovers Spirit (Gusev crater) and Opportunity (Meridiani Planum) have returned information on the oxidation state of iron, the mineralogical composition of Fe-bearing phases, and the distribution of Fe among oxidation states and phases [1,2,3]. To date, approx.100 and approx.85 surface targets have been analyzed by the Spirit and Opportunity spectrometers, respectively. Twelve component subspectra (8 doublets and 4 sextets) have been identified and most have been assigned to mineralogical compositions [4]. Two sextet subspectra result from the opaque and strongly magnetic mineral magnetite (Fe3O4 for the stoichiometric composition), one each for the crystallographic sites occupied by tetrahedrally-coordinated Fe3+ and by octahedrally-coordinated Fe3+ and Fe2+. At Gusev crater, the percentage of total Fe associated with magnetite for rocks ranges from 0 to approx. 35% (Fig. 1) [3]. The range for soils (approx.5 to approx.12% of total Fe from Mt, with one exception) is narrower. The ubiquitous presence of Mt in soil firmly establishes the phase as the strongly magnetic component in martian soil [4,5].

Morris, R. V.↗

Scale Model Thruster Acoustic Measurement Results

The Space Launch System (SLS) Scale Model Acoustic Test (SMAT) is a 5% scale representation of the SLS vehicle, mobile launcher, tower, and launch pad trench. The SLS launch propulsion system will be comprised of the Rocket Assisted Take-Off (RATO) motors representing the solid boosters and 4 Gas Hydrogen (GH2) thrusters representing the core engines. The GH2 thrusters were tested in a horizontal configuration in order to characterize their performance. In Phase 1, a single thruster was fired to determine the engine performance parameters necessary for scaling a single engine. A cluster configuration, consisting of the 4 thrusters, was tested in Phase 2 to integrate the system and determine their combined performance. Acoustic and overpressure data was collected during both test phases in order to characterize the system's acoustic performance. The results from the single thruster and 4- thuster system are discussed and compared.

Vargas, Magda↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 2b of the SkyMine® Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO2 from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO2 to products having commercial value (i.e., beneficial use), show the economic viability of the CO2 capture and conversion process, and thereby advance the technology to the point of readiness for commercial scale demonstration and deployment. The overall process is carbon negative, resulting in mineralization of CO2 that would otherwise be released into the atmosphere. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at the commercial scale. The project is being conducted in two phases. The primary objectives of Phase 1 were to evaluate proven SkyMine® process chemistry for commercial pilot-scale operation and complete the preliminary design for the pilot plant to be built and operated in Phase 2, complete a NEPA evaluation, and develop a comprehensive carbon life cycle analysis. The objective of Phase 2b was to build the pilot plant to be operated and tested in Phase 2c.

Christenson, Norm↗

Power Module Precursors and Prognostics

The ongoing work involves 1) the identification and evaluation of various electric signals as indicators to module failure and precursors to aging, and 2) the development of corresponding detection techniques. In the current phase, 1) the increase of on-state resistance is selected as the precursor to the power cycle aging of silicon carbide power MOSFET modules based on review and rest data. 2) A detection method leveraging the gate voltage fluctuations magnitude during commutation transients to inform the on-state resistance increase is investigated which has the benefit of being able to be integrated into the gate driver. A dedicated detection circuit for implementation is designed and simulated and is currently in fabrication.

ADVANCED PROPULSION SYSTEMS↗

Performance Evaluation of Advanced Retrofit Roof Technologies Using Field-Test Data -- Phase Three Final Report, Volume 2

This article presents some miscellaneous data from two low-slope and two steep-slope experimental roofs. The low-slope roofs were designed to compare the performance of various roof coatings exposed to natural weatherization. The steep-slope roofs contained different combinations of phase change material, rigid insulation, low emittance surface and above-sheathing ventilation, with standing-seam metal panels on top. The steep-slope roofs were constructed on a series of adjacent attics separated at the gables using thick foam insulation. This article describes phase three (3) of a study that began in 2009 to evaluate the energy benefits of a sustainable re-roofing technology utilizing standing-seam metal roofing panels combined with energy efficient features like above-sheathing-ventilation (ASV), phase change material (PCM) and rigid insulation board. The data from phases 1 and 2 have been previously published and reported [Kosny et al., 2011; Biswas et al., 2011; Biswas and Childs, 2012; Kosny et al., 2012]. Based on previous data analyses and discussions within the research group, additional test roofs were installed in May 2012, to test new configurations and further investigate different components of the dynamic insulation systems. Some experimental data from phase 3 testing from May 2012 to December 2013 and some EnergyPlus modeling results have been reported in volumes 1 and 3, respectively, of the final report [Biswas et al., 2014; Biswas and Bhandari, 2014].

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗

Exact realization of integer and fractional quantum Hall phases in U(1)×U(1) models in (2+1)d

In this work we present a set of microscopic U(1)×U(1) models which realize insulating phases with a quantized Hall conductivity σ{sub xy}. The models are defined in terms of physical degrees of freedom, and can be realized by local Hamiltonians. For one set of these models, we find that σ{sub xy} is quantized to be an even integer. The origin of this effect is a condensation of objects made up of bosons of one species bound to a single vortex of the other species. For other models, the Hall conductivity can be quantized as a rational number times two. For these systems, the condensed objects contain bosons of one species bound to multiple vortices of the other species. These systems have excitations carrying fractional charges and non-trivial mutual statistics. We present sign-free reformulations of these models which can be studied in Monte Carlo, and we use such reformulations to numerically detect a gapless boundary between the quantum Hall and trivial insulator states. We also present the broader phase diagrams of the models. -- Highlights: •We present a set of models of two species of bosons which realize topological phases. •The models exist on a lattice, and can be realized by local Hamiltonians. •These models exhibit both integer and fractional bosonic Hall effects. •The models can be studied in sign-free Monte Carlo.