Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wells”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Discrete Measurements of the Least Horizontal Principal Stress from Core Data: An Application of Viscoelastic Stress Relaxation

Summary The emerging Paradox Oil Play in southeastern Utah is among the most significant unconventional plays in the western USA. The mean total undiscovered oil resources within just the Pennsylvanian Cane Creek interval of the Paradox Basin are believed to exceed 215 million barrels. However, to date, less than 5% (~9 million barrels) of the total Cane Creek resource has been produced from fewer than 40 wells, and only approximately one-half of those are horizontal wells. More than 95% of production is from the central Cane Creek Unit (CCU). Natural fractures are a key feature of many production wells, but stimulation by induced hydraulic fractures is not consistently successful. We hypothesize that more effective production in this play will rely on better fundamental characterization, especially on better quantification of the state of stress. Approximately 110 ft of core, well logs, and a diagnostic fracture injection test (DFIT) were acquired from the State 16-2 well within the CCU. With these data, we applied two methods to constrain and clarify the state of stress. The first technique, the Simpson’s coefficient method, provides lower bounds on the two horizontal principal stresses and relies on only limited data. Alternatively, the viscoelastic stress relaxation (VSR) method is used to estimate the least horizontal principal stress, building on observations that principal stresses become more isotropic as the viscous behavior of a rock is more pronounced. Results of these two methods support the hypothesis that the state of stress in the CCU of the Paradox Basin is nearly lithostatic and isotropic. Other factors consistent with this hypothesis include high formation pore pressure, which tends to reduce the possible stress states by changing the frictional failure equilibrium; lack of induced fractures in the core, which should be present in the case of stress anisotropy; and interbedded halite layers, which given their high degree of ductility, probably lead to greater VSR for the entire sedimentary package.

Energy & Fuels↗

Numerical Simulations of Geologic Storage Reservoir Management to Support Risk Mitigation Evaluation

This report provides a detailed description of a set of numerical simulations that represent reservoir behavior over time in response to different operational decision scenarios for detection of potential leakage and reduction or avoidance of leakage impact at a hypothetical geological carbon storage (GCS) site. These simulations serve as the basis for a series of GCS leakage risk forecasts that are to be developed using the National Risk Assessment Partnership’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), and a demonstration of a simple decision support workflow for evaluation of mitigation strategies based on results of those system model forecasts. This risk assessment and decision support study is forthcoming. Four injection scenarios were considered: a constant rate carbon dioxide (CO 2 ) injection case (base case), a case with CO 2 injection rate adjustment, a case with early termination of injection operations, and a case with brine extraction. CO 2 injection operations were controlled to ensure that the pressure transient remains below the defined manageable reservoir fracture pressure, with consideration shown to hypothetical locations within the modeled spatial domain where the overburden was weaker and lower transient pressure increases were allowable. Additionally, a brine extraction alternative was considered as a reservoir management and risk mitigation option to reduce reservoir pressure, steer the plume away from any hypothetical geohazard such as fault as needed, and enhance storage capacity. Such operational actions contribute to risk management overtime. This study explores the potential utility of reservoir management for risk reduction at GCS sites. This study shows that the injection design may modify the time to CO 2 breakthrough at a legacy well; in particular, these results show that brine extraction can add value for mitigating risk both by delaying leakage and reducing pressure build-up. For the scenario considered, both pressure plots and pressure distributions demonstrate that pressure build-up was decreased by 3% with brine extraction. Additionally, extraction of brine afforded enhancement of CO 2 storage capacity by 5% compared to the base case. These findings suggest that brine extraction has substantial potential to steer the risk-related reservoir effects away from known geohazards (e.g., faults and legacy wells) by conducting pressure transient effects and CO 2 plume movement toward the production well. Injection rate adjustment scenarios considered in this study show potential value for managing both reservoir pressure transients and CO 2 plume behavior. Operational actions for reducing injection and/or early termination of injection (as compared to the base case), however, require careful design; tailoring both the extent and timing of injection rate adjustment over the injection and post-injection operational period must be thoroughly planned to balance maximizing storage and minimizing subsurface environmental risk. The study also gives preliminary consideration to the effectiveness that monitoring strategy may play in providing useful information to inform reservoir management decisions for risk reduction. Two types of monitoring were considered: 1) pressure build-up or pressure transient; and 2) potential leakage detection from a CO 2 mass or plume. Four hypothetical legacy wells, two plugged and two abandoned, were placed in the model domain. Monitoring along these wells was measured over time in individual stacked reservoir formations and shale formations to support risk mitigation decisions, especially operational decisions that assisted in risk reduction. These simulations will serve as the basis for a series of GCS leakage risk forecasts that are to be developed using NRAP’s Open-IAM, and demonstration of a simple decision support workflow for comparative assessment of mitigation alternatives based on results of those system model forecasts. This risk assessment and decision support study is forthcoming.

54 ENVIRONMENTAL SCIENCES↗

Fluid-Kinetic Coupling: Advanced Discretizations for Simulations on Emerging Heterogeneous Architectures (LDRD FY20-0643)

Plasma physics simulations are vital for a host of Sandia mission concerns, for fundamental science, and for clean energy in the form of fusion power. Sandia's most mature plasma physics simulation capabilities come in the form of particle-in-cell (PIC) models and magnetohydrodynamics (MHD) models. MHD models for a plasma work well in denser plasma regimes when there is enough material that the plasma approximates a fluid. PIC models, on the other hand, work well in lower-density regimes, in which there is not too much to simulate; error in PIC scales as the square root of the number of particles, making high-accuracy simulations expensive. Real-world applications, however, almost always involve a transition region between the high-density regimes where MHD is appropriate, and the low-density regimes for PIC. In such a transition region, a direct discretization of Vlasov is appropriate. Such discretizations come with their own computational costs, however; the phase-space mesh for Vlasov can involve up to six dimensions (seven if time is included), and to apply appropriate homogeneous boundary conditions in velocity space requires meshing a substantial padding region to ensure that the distribution remains sufficiently close to zero at the velocity boundaries. Moreover, for collisional plasmas, the right-hand side of the Vlasov equation is a collision operator, which is non-local in velocity space, and which may dominate the cost of the Vlasov solver. The present LDRD project endeavors to develop modern, foundational tools for the development of continuum-kinetic Vlasov solvers, using the discontinuous Petrov-Galerkin (DPG) methodology, for discretization of Vlasov, and machine-learning (ML) models to enable efficient evaluation of collision operators. DPG affords several key advantages. First, it has a built-in, robust error indicator, allowing us to adapt the mesh in a very natural way, enabling a coarse velocity-space mesh near the homogeneous boundaries, and a fine mesh where the solution has fine features. Second, it is an inherently high-order, high-intensity method, requiring extra local computations to determine so-called optimal test functions, which makes it particularly suited to modern hardware in which floating-point throughput is increasing at a faster rate than memory bandwidth. Finally, DPG is a residual-minimizing method, which enables high-accuracy computation: in typical cases, the method delivers something very close to the $L^2$ projection of the exact solution. Meanwhile, the ML-based collision model we adopt affords a cost structure that scales as the square root of a standard direct evaluation. Moreover, we design our model to conserve mass, momentum, and energy by construction, and our approach to training is highly flexible, in that it can incorporate not only synthetic data from direct-simulation Monte Carlo (DSMC) codes, but also experimental data. We have developed two DPG formulations for Vlasov-Poisson: a time-marching, backward-Euler discretization and a space-time discretization. We have conducted a number of numerical experiments to verify the approach in a 1D1V setting. In this report, we detail these formulations and experiments. We also summarize some new theoretical results developed as part of this project (published as papers previously): some new analysis of DPG for the convection-reaction problem (of which the Vlasov equation is an instance), a new exponential integrator for DPG, and some numerical exploration of various DPG-based time-marching approaches to the heat equation. As part of this work, we have contributed extensively to the Camellia open-source library; we also describe the new capabilities and their usage. We have also developed a well-documented methodology for single-species collision operators, which we applied to argon and demonstrated with numerical experiments. We summarize those results here, as well as describing at a high level a design extending the methodology to multi-species operators. We have released a new open-source library, MLC, under a BSD license; we include a summary of its capabilities as well.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Comprehensive Review of Multi-arm Caliper Data for the Big Hill SPR Site

The Big Hill SPR site has a rich data set consisting of multi-arm caliper (MAC) logs collected from the cavern wells. This data set provides insight into the on-going casing deformation at the Big Hill site. This report summarizes the MAC surveys for each well and presents well longevity estimates where possible. Included in the report is an examination of the well twins for each cavern and a discussion on what may or may not be responsible for the different levels of deformation between some of the well twins. The report also takes a systematic view of the MAC data presenting spatial patterns of casing deformation and deformation orientation in an effort to better understand the underlying causes. The conclusions present a hypothesis suggesting the small-scale variations in casing deformation are attributable to similar scale variations in the character of the salt-caprock interface. These variations do not appear directly related to shear zones or faults.

58 GEOSCIENCES↗

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

Quarterly Research Performance Progress Report (Q8)

As part of Task 1, we have started by testing our modeling capabilities by reproducing isothermal DFIT simulations presented in the literature. Once satisfied with the results we have started by targeting the modeling of the DFITs at conducted at well 58-32. We have a identified a specific test (cycle 4 in zone 2) as the most interesting to be model with GEOS hydraulic fracturing module. Thus, we have first produced results with an isothermal model and adjusted model parameters to get a satisfying match with field pressure data. The, we have added thermal effects and compared the modeling results with and without thermal effects to estimate how thermal effects may influence test interpretation. Models seem to suggest that, for small volumes of fluid, thermal effects are moderate. In Task 2, we have adapted GEOS phase-field formulation to be able to simulate near-wellbore hydraulic fracture nucleation and propagation. We have devised a novel formulation that, compared to other existing ones, incorporates rock strengths. We have submitted a journal publication about our work. We are currently employing this phase-field formulation to model the experiments taking place at U Pitt and help us understand the effect of various parameters. In Task 3, we have built a model of the region surround well 16A and have started modeling stage 3 stimulation because of its simpler planar geometry. After calibrating simulation parameters using known analytical solutions, we have simulated the stage 3 stimulation using our isothermal hydraulic fracturing module, varying the permeability field, the stress conditions including different physics to get a better understanding of the numerical challenges and of the effects of varying these parameters on the simulation results. In Task 4 laboratory experimentation, a set of specialized drilling and injection tools has been customized and constructed to accommodate an inclined well with an orientation of up to 30 degrees relative to material anisotropy or principal stress axes. These inclined samples have also undergone thermal stress and hydraulic fracturing at a temperature of 190 degrees Celsius. Furthermore, both vertical and deviated sampling testing setups enable an extended analysis of post-peak pressure behaviors, facilitating post-test pressure analyses such as the G-function, step rate, and fracture reopening measurements. Thus, the key components of in-situ stress estimation can be extracted and validated through our experiment, providing a solid foundation for validating existing in-situ stress estimation theories or proposing new ones. Simultaneously, we are integrating computer vision techniques with traditional experimental fracture observation methods such as multi-overcore/slicing and water-penetration fracture observation. This combination will prove beneficial in populating the hydraulic fracture patterns database, generated under challenging EGS conditions. This approach aims to deepen our understanding of the complexities in EGS reservoirs and pave the way for future data-driven investigations. Additionally, PITT has also equipped the ELE International compression machine, which is now prepared for conducting indirect tensile and fracture toughness tests. These tests will aid in characterizing how rock fabrics influence the resulting fracture patterns. Additionally, we have completed the required personnel training and gained access to Scanning Electron Microscopy (SEM) and Energy Dispersive Spectroscopy (EDS) for conducting more detailed characterization and analysis of rock fabrics, as well as the examination of thermal and hydraulically induced fracture patterns. Thus, the PITT team has effectively demonstrated the capabilities of our experimental apparatuses in exploring the thermal effects, well deviation angles, material anisotropy, and operational choices (such as circulation rate, injection fluid viscosity, and injection rate) and their impact on pressure responses and fracture trajectories under the Utah FORGE conditions.

15 GEOTHERMAL ENERGY↗

Field Results from New Tensor Borehole Optical Fiber Strainmeter Installations in Oklahoma and Utah

The time evolving strain field contains a wealth of information that can be used to interpret subsurface behavior. For example, injecting or removing fluids from reservoirs or aquifers causes deformation that can be used as a diagnostic signal in some cases, while it can interfere with geodetic interpretations in other cases. We've previously demonstrated the feasibility of measuring the strain tensor at a depth of 30m caused by injection into a reservoir at 530m. The observed strain signals were interpreted using four independent analytic and numerical methods that resulted in estimates of the poroelastic properties and geometry of the reservoir that was consistent with data from well logs. However, studies like these are only possible if these deformations can be reliably measured. Years of lab and field work has culminated in the development of a novel borehole strainmeter capable of resolving multiple components of strain using embedded optical fibers configured as Michelson interferometers. It features four horizontal gauges separated by 45° to resolve the horizontal strain tensor as well as a vertical strain gauge and a sixth null component for state-of-health monitoring. The downhole sensing package also includes an open pipe through its center for grout circulation during single-trip deployments and a fully welded stainless steel exterior for robustness and longevity. These instruments have a resolution of 2x10-13 strain that can easily measure the solid earth tides. Preliminary data are available from four strainmeters in shale at our Oklahoma site and four in compacted sand and gravel in Utah. These are deployed from 40-60m, except one of the strainmeters in Oklahoma is deployed at 500m. The data include strains from the initial grout curing, comparisons to predicted earth tide models and in-situ calibration results, barometric pressure admittances and spectral analyses as well as signals from underground injections and surface waves from teleseismic events. Preliminary analyses indicate behavior consistent with other strainmeter deployments, and comparison to data from a Gladwin strainmeter at the Oklahoma site validate the performance of the new design. Analyses from a suite of six well tests at the Oklahoma site show for the first time how the strain tensor field varies with location during well testing.

DeWolf, Scott↗

2024 Update of Comprehensive Review of Multi-arm Caliper Data for the Big Hill SPR Site

The Big Hill SPR site has a rich data set consisting of multi-arm caliper (MAC) logs collected from the cavern wells. This data set provides insight into the on-going casing deformation at the Big Hill site. This report summarizes the MAC surveys for each well and presents well longevity estimates where possible. Included in the report is an examination of the well twins for each cavern and a discussion on what may or may not be responsible for the different levels of deformation between some of the well twins. The report also takes a systematic view of the MAC data presenting spatial patterns of casing deformation and deformation orientation in an effort to better understand the underlying causes. The conclusions present a hypothesis suggesting the small-scale variations in casing deformation are attributable to similar scale variations in the character of the salt-caprock interface. These variations do not appear directly related to shear zones or faults. In addition, the deformation orientation shows no preferred directionality. This 2024 edition of this report represents an update to the original, 2023 edition. The updates primarily focus on the inclusion of MAC log data run since the December 2021 threshold date for the original report, but some new analyses are also included.

58 GEOSCIENCES↗

RePED 250: Manufacturing and Market Analysis of High-Temperature Alternators

The novel repetitive pulsed electric drill 250 (RePED 250) has the potential to greatly lower the costs and drilling times of geothermal projects. This tool discharges electric pulses through hard rock formations, shattering the rock in tension and allowing it to be quickly removed. One hurdle in bringing this technology to market is the RePED 250 downhole alternator. This component is essential for supplying power to the electronic drilling tool. There are currently no downhole tools on the market that meet the RePED 250 alternator's high temperature and power requirements. This report focuses on the path to commercialization for this novel alternator technology being developed as part of the RePED 250 project. One aim of this work is to identify the geothermal market size for the RePED 250 alternator, as well as other potential markets for this technology outside of geothermal. The geothermal market is very small, with only approximately 13 wells drilled in the United States each year. The worldwide market is several times this size and growing each year. The ability of the RePED 250 technology to drastically reduce the cost of geothermal projects may also lead to an increase in this market size. Technology developed for the high-temperature, high-power RePED 250 alternator can also be used to create high-temperature and high-power motors. These motors and alternators will have potential applications in oil and gas drilling, a $300 billion dollar industry in the United States alone, as well as in more distant industries such as aircraft, weapon systems, space exploration, and electric vehicles. Other aspects of the RePED 250 alternator's path to commercialization are also analyzed, including the supply chain for production materials and potential manufacturing methods. The supply chain and manufacturing practices for low-temperature motors and alternators are well established and require relatively minor changes for the high-temperature and high-power RePED 250 alternator. Sourcing for high-temperature materials has been identified, as well as potential supply chain risks. These most notably include electrical steel and high-temperature samarium cobalt (SmCo) magnets. Overall, these risks are not expected to be significant at the likely manufacturing scale required for the RePED 250.

15 GEOTHERMAL ENERGY↗

Transitioning CO2-EOR Field to Dedicated CO2 Storage: Risk Considerations and Quantifications

Presentation slides on “Transitioning CO2-EOR Field to Dedicated CO2 Storage: Risk Considerations and Quantifications” for the CCUS 2025 conference held in Houston, Texas March 3-5, 2025. CO2 injection wells for enhanced oil recovery (EOR) are currently regulated as Class II wells under the U.S. Environmental Protection Agency’s (EPA) Underground Injection Control (UIC) program, while dedicated geological CO2 storage (GCS) wells are considered Class VI wells. The UIC classification of wells for a transitioning CO2-EOR facility has the potential to substantially impact the feasibility of operations. This paper reports a case study of risk assessment of this transition, including areas review, plume stability and pressure transient and its impacts in dedicated CO2 storage.

carbon storage↗

Prediction and Analysis of Utah FORGE Injection Activities using a Coupled Thermo-hydro-mechanical and Earthquake (THM+E) Modeling Workflow

A coupled thermo-hydro-mechanical (THM) numerical workflow that is capable of modeling seismic slip is critical for the successful development of enhanced geothermal systems (EGS). By integrating key physical processes, this workflow enables accurate simulation of temperature and pressure diffusions, stress changes, and induced seismicity. As a result, it serves as a vital tool for predicting induced seismicity and optimizing reservoir stimulation strategies. The Utah FORGE (Frontier Observatory for Research in Geothermal Energy) project, located near Milford, Utah, is a U.S. Department of Energy initiative aimed at advancing EGS technology. In April 2024, eight new stimulation stages (Stages 3R-10) were conducted in well 16A (injection well) subsequent to the first series of stimulation (Stages 1-3) performed in April, 2022. To monitor the induced seismicity, geophones were deployed in wells 58-32, 56-32, and 78B-32, while fiber optic cables were also installed in wells 16B, 78-32, and 78B-32 to collect microseismic data and detect frac hits Preliminary analyses of microseismic catalogs and fiber optic data suggest that the stimulated fractures in Stages 3R–6 closely align with that generated during Stage 3, indicating that the new stimulations were likely reactivating the previously stimulated fracture. To better understand the underlying process, a comprehensive modeling approach that can accurately capture thermal, hydrological, mechanical, and seismic responses is essential. In this work, we propose and utilize a coupled thermo-hydro-mechanical and earthquake (THM+E) simulation workflow to numerically investigate the stimulation activities on well 16A. The specific objective is to confirm whether the new stimulation stages (Stages 3R–6) reactivated fractures previously stimulated during Stage 3. For this purpose, we perform THM+E simulations individually for Stages 3, 3R, 4, and 5, incorporating the discrete fracture networks (DFNs) created by the plane-fitting technique based on the microseismic catalogs. The simulation workflow consists of two separate models: a THM model and an earthquake model, coupled in a one-way manner. Detailed descriptions of the workflow are provided in Section 3. Simulation results are presented in terms of injection pressure, permeability evolution, and predicted seismic catalogs, which are then compared with field data for further analyses. This report is structured as follows. In Section 2, we present detailed analyses of the field data and propose the hypothesis that the new stimulation stages (Stages 3R–6) were probably reactivating the previously stimulated fractures in Stage 3. In Section 3, we introduce the coupled THM+E workflow and the problem setup to validate our hypothesis, followed by the simulation results for each stage in Section 4. Meanwhile, discussions are included to analyze the model predictions and their comparison with field data. Lastly, we conclude the report and outline future plans in Section 5.

15 GEOTHERMAL ENERGY↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

IACMI Project 4.7: Pultruded Textile Carbon Fiber for Spar Caps (Final Report)

The primary objective of this project was to demonstrate the potential to significantly reduce the cost of wind turbine blades with carbon fiber reinforced polymer (CFRP) structure. Applicability of textile carbon fibers (TCF) were evaluated for use in pultruded spar cap (SC) elements as a path to cost reduction for utility scale wind turbine blades. In earlier work for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), a collaboration of Sandia National Laboratory (SNL), Oak Ridge National Laboratory (ORNL), and Montana State University has demonstrated potential for pultruded TCF to compete with infused fiberglass and commercially available carbon fiber pultruded sections for spar cap construction. In the design cases evaluated, the TCF sections fared well when compared on cost per unit composite stiffness and cost per unit composite compressive strength for those designs [1]. Both stiffness and compressive strength tend to be key factors in the design of blade composite Spar Cap which carry the bulk of the blade structural loads in bending. Spar Cap design tends to distribute largely symmetric tensile and compressive stresses to opposite sides of the spar structure, but since carbon fiber composite compressive strength is typically 20-50% lower than tensile strength, the compressive loading reaches failure levels well before the tensile loading. Stiffness is critical in containing the large tip deflection in high wind loading situations. However, materials and process development were very limited in the earlier study and the work in this project was expanded to make the comparative information more representative of what will be required in order to make further inroads towards implementation. Similar to that study, this project team confirmed that the primary materials of interest for pultruded spar cap elements should be thermoset (TS) resins reinforced by carbon fibers, utilizing as high a percentage of TCF as practical to benchmark cost and performance against commercial carbon fibers. To make the closest comparison possible and eliminate specific test article size, resin selection, and equipment/operational nuance effects, the team planned to pultrude sections with 100% commercially available carbon fiber (Panex 35 carbon fiber from Zoltek) as well as samples utilizing high fractions of TCF. The resin system chosen was based on formulations recommended by large wind industry supplier Hexion and consisted of Hexion resin RSL-4597, curing agent CCA-138, and internal mold release additive 117, along with common kaolin filler ASP400P from BASF. As commonly deployed in spar cap configurations, the team had a mold built to pultrude a rectangular spar cap element of 100mm width and 3mm thickness. The extremely limited number of samples produced for the earlier study were produced with a “generic” epoxy utilized for a variety of applications by the pultruder contracted to produce test articles for demonstration purposes. More importantly, those samples were produced at a fiber fraction only slightly over 50%. Based on feedback from our industrial advisory team for that project and strongly recommended by this project team, the consensus is that it is highly desirable to obtain fiber fractions of 65-68% for significant penetration in wind blade spar cap. Although this requirement has yet to be exhaustively confirmed in readily available information, this was established as a project goal and informally decided we needed to exceed 60% fiber fraction to gain serious industry consideration. Previous TCF pultrusion trials have been challenged by the lack of robust TCF packages, resulting in non-uniform tension across and between tows, as well as excess labor and waste for removal of interleaved paper. The non-uniform tension and associated intermingling of tows in textile acrylic fiber tows and associated difficulties created from broken filaments in carbon fiber conversion inhibit the ordered packing necessary to enhance fiber fraction elevation. (These “cross-overs” are not considered undesirable for textile applications and there is some sense that they might be advantageous for those applications). In addition to work that is ongoing at the acrylic fiber manufacturers to improve their formats, The Institute of Advanced Composites Manufacturing Innovation (IACMI) Project 6.12 (report PA16-0349-6.12-01) [2] has developed and demonstrated a more robust packaging and creeling approach that at least partially addresses these issues, thus improving control of the TCF feed into the pultrusion unit. It was hoped that these and other improvements currently being implemented would allow us to achieve fiber fractions at least approaching these fiber fraction targets. During this project, sections utilizing 100% commercially available carbon fiber reinforcement were produced as a baseline, as well as sections reinforced with about 94% TCF and the balance being commercially available fiber for comparison. The most important finding was that similar to results reported in the earlier WETO-funded project and results from tests of TCF reported at IACMI meetings, this work demonstrated that sections pultruded with TCF in an epoxy resin frequently utilized in actual spar cap production had stiffness and compressive strengths largely comparable to similar sections pultruded with a commercially available carbon fiber also frequently utilized in the wind industry. Although the amount of that data is limited, some of the tensile strength results were actually closer than would have been expected based on fiber strength results provided by the TCF and commercial fiber producers. The actual test data are reported and discussed in detail in Section 5. The pultruded sections dominated by TCF reinforcement were approximately 8-10% lower in fiber fraction than for the sections produced using commercial fiber alone, making direct comparison difficult. The COVID-19 project has provided significant insight into the current state-of-the-art with various TCF product forms. The data obtained in this project will guide the planned improvements at the precursor level, especially in attaining uniform tensioning and payout to facilitate enhanced fiber fractions and overall processability of the TCF composites. The project team is providing guidance to stakeholders concerning the attributes, needs, and potential demand for TCF in wind blade spar caps. Results achieved in this project are consistent with findings in the related work cited [1] and support this guidance and the high potential for this product type. TCF precursor-producing partners continue to express interest in enhancing their product forms and the team looks forward to working with these improved materials as they become available.

42 ENGINEERING↗

One Earth Energy Static and Dynamic Reservoir Modeling

This report presents the static and dynamic reservoir modeling conducted for the CarbonSAFE Phase III Illinois Storage Corridor project to assess the feasibility of commercial-scale CO 2 storage in the Mt. Simon Sandstone at the One Earth Energy (OEE) site in McLean County, Illinois. Three-dimensional geocellular models of the Mt. Simon storage complex were developed in Petrel ® by integrating petrophysical log data, core analyses, and seismic surveys from the OEE #1 stratigraphic test well and two nearby wells, with multiple model versions created as new data became available. Dynamic reservoir simulations, performed using Landmark's Nexus software, progressed through three phases (preliminary, sensitivity, and UIC Class VI permit studies) evaluating injection scenarios across varying rates, well orientations, permeability models, and multi-well configurations. Results demonstrate that commercial-scale storage is feasible: three injection wells spaced approximately one mile apart can store a total of 90 million tonnes of CO 2 over 20 years, producing a combined plume with an equivalent radius of 3.2 miles and a maximum pressure-front-defined Area of Review of 178 mi 2 at the end of injection that diminishes to 34 mi 2 after 50 years of post-injection monitoring. Sensitivity analyses indicate that a 20% change in porosity or permeability yields approximately a 7% change in AoR radius, and that perforating the high-permeability arkosic zone minimizes the pressure front compared to injection in the upper Mt. Simon Sandstone.

09 BIOMASS FUELS↗

Metagenome-assembled genomes provide insight into the metabolic potential during early production of Hydraulic Fracturing Test Site 2 in the Delaware Basin

Demand for natural gas continues to climb in the United States, having reached a record monthly high of 104.9 billion cubic feet per day (Bcf/d) in November 2023. Hydraulic fracturing, a technique used to extract natural gas and oil from deep underground reservoirs, involves injecting large volumes of fluid, proppant, and chemical additives into shale units. This is followed by a “shut-in” period, during which the fracture fluid remains pressurized in the well for several weeks. The microbial processes that occur within the reservoir during this shut-in period are not well understood; yet, these reactions may significantly impact the structural integrity and overall recovery of oil and gas from the well. To shed light on this critical phase, we conducted an analysis of both pre-shut-in material alongside production fluid collected throughout the initial production phase at the Hydraulic Fracturing Test Site 2 (HFTS 2) located in the prolific Wolfcamp formation within the Permian Delaware Basin of west Texas, USA. Specifically, we aimed to assess the microbial ecology and functional potential of the microbial community during this crucial time frame. Prior analysis of 16S rRNA sequencing data through the first 35 days of production revealed a strong selection for a Clostridia species corresponding to a significant decrease in microbial diversity. Here, we performed a metagenomic analysis of produced water sampled on Day 33 of production. This analysis yielded three high-quality metagenome-assembled genomes (MAGs), one of which was a Clostridia draft genome closely related to the recently classified Petromonas tenebris. This draft genome likely represents the dominant Clostridia species observed in our 16S rRNA profile. Annotation of the MAGs revealed the presence of genes involved in critical metabolic processes, including thiosulfate reduction, mixed acid fermentation, and biofilm formation. These findings suggest that this microbial community has the potential to contribute to well souring, biocorrosion, and biofouling within the reservoir. Our research provides unique insights into the early stages of production in one of the most prolific unconventional plays in the United States, with important implications for well management and energy recovery.

natural gas↗

Modeling Subsurface Performance of a Geothermal Reservoir Using Machine Learning

Geothermal power plants typically show decreasing heat and power production rates over time. Mitigation strategies include optimizing the management of existing wells—increasing or decreasing the fluid flow rates across the wells—and drilling new wells at appropriate locations. The latter is expensive, time-consuming, and subject to many engineering constraints, but the former is a viable mechanism for periodic adjustment of the available fluid allocations. In this study, we describe a new approach combining reservoir modeling and machine learning to produce models that enable such a strategy. Our computational approach allows us, first, to translate sets of potential flow rates for the active wells into reservoir-wide estimates of produced energy, and second, to find optimal flow allocations among the studied sets. In our computational experiments, we utilize collections of simulations for a specific reservoir (which capture subsurface characterization and realize history matching) along with machine learning models that predict temperature and pressure timeseries for production wells. We evaluate this approach using an “open-source” reservoir we have constructed that captures many of the characteristics of Brady Hot Springs, a commercially operational geothermal field in Nevada, USA. Selected results from a reservoir model of Brady Hot Springs itself are presented to show successful application to an existing system. In both cases, energy predictions prove to be highly accurate: all observed prediction errors do not exceed 3.68% for temperatures and 4.75% for pressures. In a cumulative energy estimation, we observe prediction errors that are less than 4.04%. A typical reservoir simulation for Brady Hot Springs completes in approximately 4 h, whereas our machine learning models yield accurate 20-year predictions for temperatures, pressures, and produced energy in 0.9 s. This paper aims to demonstrate how the models and techniques from our study can be applied to achieve rapid exploration of controlled parameters and optimization of other geothermal reservoirs.

15 GEOTHERMAL ENERGY↗