Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,531 records · Page 85

Reference Stratigraphy Applied to Rock Mechanics Studies for the Waste Isolation Pilot Plant: A Review - January 11, 2017

Reference stratigraphy for the Waste Isolation discernible clay in the orange halite, and Pilot Plant (WIPP) was developed to provide a standard for comparing the results of different models of mechanical behavior of the WIPP underground (e.g., Krieg, 1984) (Figure 1). Munson et al. (1989) revised the reference stratigraphy (Figure 2), and they concluded that mechanical behavior at WIPP was better represented by a different distribution of lithologies, in particular by assigning most of the units in the reference stratigraphy to “argillaceous halite” rather than as “clean halite.” Here I re-evaluate the background for these reference stratigraphies and lithology by examining core and other data.

58 GEOSCIENCES↗

Carbon Capture Pilot at Dry Fork Power Station (Final Technical Report)

The objective of this project was to design, seek necessary approvals, build and operate a large-scale pilot sorbent-based post combustion carbon capture system (CCS) at a coal fired power generation facility. TDA’s CCS uses a highly stable, low-cost, high-capacity physical adsorbent to effectively remove CO 2 via a combination vacuum and concentration swing adsorption (VCSA) process. The CCS is integrated with the power plant flue gas exhaust, which is rich in CO 2 (~13% vol. CO 2 ) and removes more than 90% of the plant’s overall carbon emissions.

01 COAL, LIGNITE, AND PEAT↗

Computer vision-based rock bolt detection in orthomosaic imagery obtained in the Waste Isolation Pilot Plant underground facility

Assessing structural integrity of large underground tunnel facilities is often a time consuming and human-labor intensive task. Thus, research using various modes of sensing and automated detection of key structural components in mines is posed to aid in safety assessments and establishing overall structural health. We propose an approach utilizing off-the-shelf camera and lidar technology fixed to a custom sensing platform, image stitching techniques, fine-tuned object detection models, and specialized model-inference methods to automatically detect, count, and map roof bolts for assessment of structural safety in man-made underground tunnels. Results show a novel workflow for effective object counting in orthomosaic tunnel ceiling images generated from collections in GPS-denied mining environments. Additionally, we demonstrate effective fine-tuning of EfficientDet object detectors utilizing state-of-the-art image augmentation techniques known as the mosaic and mixup transformations. Our work is demonstrated on sensed data and imagery collected from the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) where miles of tunnel ceiling must be assessed for structural integrity.

42 ENGINEERING↗

Ceramic Membrane Solar Desal: Pilot System Design and Full-Scale System Techno-Economic Analysis (CRADA Final Report)

This work is conducted in support of the American Made Challenges Solar Prize. The current scope addresses the Design portion of the overall prize competition. This team, led by the University of Connecticut, will design a solar powered, pilot scale, ceramic-based membrane distillation system that can operate on high salinity waters and propose that design for construction in the Test phase of the Prize competition.

14 SOLAR ENERGY↗

Pilot Development Progress to Demonstrate Electric Thermal Energy Storage (ETES) Using Low-Cost Particles

The rapid growth of future energy demand increases the need to economically store electrical energy over durations up to several days in long-duration energy storage (LDES) applications. LDES can reduce the grid stress for improving the resilience of the grid. The integration of renewable power and storage has several significant and positive impacts including expanding the renewable energy portion of electricity generation, meeting peak-load demand, and coordinating supply and demand. Several energy storage approaches including mechanical, chemical and electrochemical methods are currently deployed or under development. However, LDES requirements pose unique challenges for scalability, energy capacity, and cost. Thermal energy storage (TES) has the ability to store a large capacity of energy with improved site flexibility compared to incumbent LDES technologies (i.e., pumped hydro) and has attracted significant interest. Our development in TES technology using solid particles as the storage medium has shown feasibility and potential in serving LDES purposes. Particle TES has various advantages over commercialized molten nitrate salt TES and has emerged as a promising storage technology originating from Generation 3 concentrating solar power (CSP) development. Stable, inexpensive silica sand produced in the Midwestern U.S. was identified as a suitable storage medium and has been validated through lab heating and cycling tests. We have successfully developed particle TES for bidirectional electric energy storage to broaden the applications for TES beyond CSP technologies and into standalone electric-thermal energy storage (ETES) systems. Key component designs and performance were verified with prototype testing and model simulations. The ETES system uses high-temperature, low-cost particle thermal energy storage coupled with a unique pressurized fluidized bed heat exchanger that supports a high-efficiency, air-Brayton combined power cycle. At times of low energy demand or high renewable production, an electric particle heater heats large quantities of solid particles to high temperatures in excess of 1100 degrees C. The particles are stored in internally insulated silos. At times of high electricity demand, the hot particles are gravity-fed through the heat exchanger where stored thermal energy is transferred to the power cycle working fluid to drive the gas turbine power generation system, thereby converting the thermal energy back into electricity for the grid. The cold particles leaving the heat exchanger are returned to the storage silos by a well-insulated particle conveyor. This ETES technology using particle TES can be sited anywhere and is predicted to be economic and efficient. Moreover, this ETES technology could be co-located with a retired coal or gas plant to leverage existing power generation and grid infrastructure. Our work has focused on the development of each of the key components (e.g., the electric particle heater, particle storage silos, and the particle-to-gas pressurized fluidized bed heat exchanger) through conceptual designs, prototype testing, and computational modeling. These developments demonstrate technological feasibility and are an important step towards the next phase of development of this promising LDES technology. This presentation will show the progress in developing a pilot demonstration of the ETES system on a commercially relevant scale.

25 ENERGY STORAGE↗

Pilot Development Progress to Demonstrate Electric Thermal Energy Storage (ETES) Using Low-Cost Particles

The rapid growth of variable renewable power generation increases the need to economically store electrical energy over durations up to several days in long-duration energy storage (LDES) applications. LDES can bridge the intermittency of increasing variable renewable energy (VRE) and facilitate emission-free dispatchable electricity to improve the resilience of the grid and provide reliable and potentially cost-effective energy. Several energy storage approaches including mechanical, chemical and electrochemical methods are currently deployed or under development. However, LDES requirements pose unique challenges for scalability, energy capacity, and cost. Electro-thermal energy storage (ETES) can store a large capacity of energy with site flexibility and has attracted significant interest for LDES purposes. This paper shows the progress of developing a demonstration test facility for particle ETES technology including pilot-scale component design and fabrication.

25 ENERGY STORAGE↗

AI-Ready Data Pilot Project Report

The proliferation of artificial intelligence in scientific research has created an urgent need to define "AI-ready data" for researchers and, more importantly, provide resources to help them produce AI-ready data. At Pacific Northwest National Laboratory, we conducted a pilot study with three data scientists evaluating three CSV datasets from different scientific domains, followed by semi-structured interviews capturing assessment practices. Our findings reveal that AI-readiness evaluation is intuition-based, with practitioners asking "How fast can I go from raw data to my machine learning pipeline?" Data scientists consistently prioritized workflow efficiency, human interpretability, and quality stewardship signals. From these insights, we developed a practical evaluation framework comprising data requirements, metadata standards, and validation tests that provides actionable criteria for producing and curating AI-ready datasets, addressing the gap between theoretical understanding and practical implementation.

97 MATHEMATICS AND COMPUTING↗

Air-sea interactions yielding rapid Beaufort Sea ice losses during the 2021 ONR THINICE Pilot Field Campaign

Seasonal sea ice coverage has declined in the Pacific Arctic region. Losses of the ice cover have modified the region’s surface heat and momentum fluxes providing weather systems more direct interaction with the upper ocean. For example, recent cyclones that have passed over these waters have initiated multiple air-sea interactions and have impacted mixed layer depth, wave properties, and sea ice mass budgets due to diabatic and/or advective processes. As a United States Office of Naval Research (ONR) Departmental Research initiative, one key component of the ONR THINICE program was to advance knowledge on Arctic cyclone coupling with the ocean surface, its ice cover, and understand how such coupling can lead to rapid ice loss. Leading up to the primary field campaign in August 2022, a pilot field campaign from 19 August to 13 September 2021 focused in Utqiagvik, Alaska and Longyearbyen, Svalbard was carried out. This period was marked by frequent Arctic cyclones, periods of strong low-level winds, and stints of extreme short-term Beaufort Sea ice area losses. Cyclones traversed these waters much more frequently than usual during this 26-day period, but did not exhibit extreme central pressures indicative of high intensity and impactful storms. Using ERA5 atmospheric reanalysis fields, CERES and AIRS surface flux retrievals, and in situ sensor data collected from ice-tethered profilers and ice mass balance buoys, we highlight air-sea-ice interactions in the Beaufort Sea during and between these cyclones leading up to extreme ice loss events. Our case study analysis is aimed at understanding how Arctic cyclones, including air-sea interactions prompted by their passage over the marginal ice zone, influence the end-of-summer ice conditions and ice loss events. This study provides an example where frequent, yet weak storms drive rather large marginal sea-scale losses albeit with heterogenous sea ice effects at local scales.

Ballinger, Thomas [International Arctic Research C↗

Research Development and Partnership Pilot (RDPP): Developing plans and partnerships for incorporating tree reproduction to understand Earth system change

The goals for this Research Development and Partnership Pilot (RDPP) proposal were to i) learn about Department of Energy (DOE) research and use the PI’s expertise on patterns and environmental drivers of tree reproduction as a basis to make connections with individuals and research groups at DOE National Laboratories, and ii) to develop plans and form partnerships that will both enhance the PI’s research. The objectives of the proj ect were for the PI to i) participate in the Department of Energy's Office of Science program in Biological and Environmental Research training and outreach activities, ii) conduct directed fact-finding on Earth and Environmental Systems Sciences Division (EESSD) research projects and new partnerships with individuals and groups at National Laboratories, ii) conduct meetings with potential collaborators at National Laboratories to discuss EESSD-relevant research ideas, and iv) to develop a plan for future research efforts. During the period of the award, the objectives of the proposal were met, as the PI attended Environmental System Sciences meetings, American Geophysical Union meetings, SPRUCE experiment meetings, and visited the Oak Ridge National Lab. These activities led to increased understanding of the research being conducted by DOE scientists and the PI had meetings with potential collaborators to develop future research plans that leverage expertise at DOE and the research interests of the PI to increase understanding of the role of tree reproduction in future carbon allocation and in tree regeneration models in boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Controlling Mercury Release from Source Zones to Surface Water: Initial Results of Pilot Tests at the Y-12 National Security Complex

This report presents initial results obtained during year 2008 and satisfies a deliverable listed in the work breakdown structure (WBS) element OR081301. Broad objectives of the multi-year project are: (1) evaluation of remediation technologies for waterborne mercury, (2) development of treatment methods for soil mercury, and (3) source identification, characterization and analyses to improve mass balance on mercury estimates. This report presents the results of pilot tests, conducted in summer and fall 2008, which focused on remediation of waterborne mercury. The goal of this task is to develop strategies and treatment technologies that reduce the concentration and loading of waterborne mercury discharges to the UEFPC, thus minimizing mercury uptake by fish. The two specific studies are: (1) reducing flow augmentation in UEFPC to lessen mercury mobilization from contaminated stream sediments, and (2) treatment of contaminated source waters with a chemical reductant to convert dissolved mercury to a volatile form that can be removed by air stripping or natural evasion. Diversion of 50% of the flow currently added to UEFPC by the flow management system appeared to reduce mercury inputs from a localized, highly contaminated streambed by 0.6-1.5 grams per day (g/d). A reduction of 0.6 g/d represents {approx} 7-10% decrease in mercury input to UEFPC. Mercury concentrations within UEFPC did not rise proportionately with the loss of dilution, in part because of the reduction in input from the streambed source and in part because of reduced flow from the Y-12 NSC storm drain system. A longer-term test that includes seasonal variability will be the next step to validate these initial field observations of the flow diversion experiment. Preliminary laboratory experiments show that a large fraction ({approx} 90%) of the mercury can be chemically reduced to Hg(0) by addition of low concentrations of tin, Sn(II). Conversion of mercury to volatile Hg(0) in UEFPC was also demonstrated in the field by in-situ addition of low levels of Sn(II) in the headwaters. A substantial fraction ({approx} 30% of baseline mercury levels by the end of the experiment) of the mercury was converted from oxidation state II to 0. The addition of the dechlorinating agent sodium thiosulfate mobilized a small amount of additional mercury from the pipe through which EFPC flowed, but the excess Hg largely disappeared by the end of the chemical addition period. No excess tin was observed at the regulatory monitoring point, mercury levels in air were low, and no in-stream toxicity was observed. At a Hg(II) reduction efficiency of {approx} 30%, in-situ reduction coupled with air stripping has the potential to remove large quantities of mercury from the UEFPC flow. Air stripping has not been implemented, but a demonstration is planned for the next phase of field experiments. The initial results from this 2008 study suggest a combination of reducing augmented flow volume and chemical reduction using stannous chloride will produce at least a 35% reduction in baseflow mercury loading to UEFPC, from approximately 8 g/d to 5 g/d. The goal of research in 2009 and beyond will be to gain further improvements in each of these approaches.

54 ENVIRONMENTAL SCIENCES↗

Optical People Counting for Demand Controlled Ventilation: A Pilot Study of Counter Performance

This pilot scale study evaluated the counting accuracy of two people counting systems that could be used in demand controlled ventilation systems to provide control signals for modulating outdoor air ventilation rates. The evaluations included controlled challenges of the people counting systems using pre-planned movements of occupants through doorways and evaluations of counting accuracies when naive occupants (i.e., occupants unaware of the counting systems) passed through the entrance doors of the building or room. The two people counting systems had high counting accuracy accuracies, with errors typically less than 10percent, for typical non-demanding counting events. However, counting errors were high in some highly challenging situations, such as multiple people passing simultaneously through a door. Counting errors, for at least one system, can be very high if people stand in the field of view of the sensor. Both counting system have limitations and would need to be used only at appropriate sites and where the demanding situations that led to counting errors were rare.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Customer Impact Evaluation for the 2009 Southern California Edison Participating Load Pilot

The 2009 Participating Load Pilot Customer Impact Evaluation provides evidence that short duration demand response events which cycle off air conditioners for less than thirty minutes in a hot, dry environment do not lead to a significant degradation in the comfort level of residents participating in the program. This was investigated using: (1) Analysis of interval temperature data collected from inside residences of select program participants; and (2) Direct and indirect customer feedback from surveys designed and implemented by Southern California Edison at the conclusion of the program season. There were 100 indoor temperature monitors that were acquired by LBNL for this study that transmitted temperature readings at least once per hour with corresponding timestamps during the program season, June-October, 2009. Recorded temperatures were transferred from the onsite telemetry devices to a mesh network, stored, and then delivered to KEMA for analysis. Following an extensive data quality review, temperature increases during each of the thirty demand response test events were calculated for each device. The results are as follows: (1) Even for tests taking place during outside temperatures in excess of 100 degrees Fahrenheit, over 85 percent of the devices measured less than a 0.5 degree Fahrenheit temperature increase indoors during the duration of the event. (2) For the increases that were observed, none was more than 5 degrees and it was extremely rare for increases to be more than 2 degrees. At the end of the testing season SCE and KEMA designed and conducted a survey of the a facilities and public works managers and approximately 100 customers feedback survey to assess the extent the PLP events were noticed or disrupted the comfort level of participants. While only a small sampling of 3 managers and 16 customer surveys were completed, their responses indicate: (1) No customer reported even a moderate level of discomfort from the cycling-off of their air conditioners during test events; and (2) Very few customers noticed any of the thirty events at all. The results of this study suggest that the impacts on comfort from short-duration interruptions of air-conditioners, even in very hot climates, are for the most part very modest, if they are even noticed at all. Still, we should expect that these impacts will increase with longer interruptions of air-conditioning. By the same token, we should also expect that they will be less significant in cooler climates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

New Metallization Technique Suitable for 6-MW Pilot Production of Efficient Multicrystalline Solar Cells Using Upgraded Metallurgical Silicon: Final Technical Progress Report, December 17, 2007 -- June 16, 2009

This report describes CaliSolar's work as a Photovoltaic Technology Incubator awardee within the U.S. Department of Energy's Solar Energy Technologies Program. The term of this subcontract with the National Renewable Energy Laboratory was two years. During this time, CaliSolar evolved from a handful of employees to over 100 scientists, engineers, technicians, and operators. On the technical side, the company transitioned from a proof-of-concept through pilot-scale to large-scale industrial production. A fully automated 60-megawatt manufacturing line was commissioned in Sunnyvale, California. The facility converts upgraded metallurgical-grade silicon feedstock to ingots, wafers, and high-efficiency multicrystalline solar cells.

14 SOLAR ENERGY↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 8)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Biennial Environmental Compliance Report

This biennial environmental compliance report (BECR), the ninth to be issued, documents United States (U.S.) Department of Energy (DOE) compliance with environmental regulations at the Waste Isolation Pilot Plant (WIPP), a facility designed and authorized for the safe disposal of transuranic (TRU) radioactive waste and mixed TRU waste. TRU waste is radioactive waste which contains alpha-emitting radionuclides of atomic number greater than 92, with half lives longer than 20 years, and which are present in concentrations greater than 100 nanocuries per gram of waste. The BECR meets the requirements of the WIPP Land Withdrawal Act (LWA) (Public Law [Pub. L.] 102-579, as amended by Pub. L. 104-201, WIPP Land Withdrawal Act Amendments of 1996).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗