Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGETS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,477 records · Page 82

Atmospheric System Research Marine Low Clouds Workshop Report, January 27-29,2016

Marine low clouds are a major determinant of the Earth?s albedo and are a major source of uncertainty in how the climate responds to changing greenhouse gas levels and anthropogenic aerosol. Marine low clouds are particularly difficult to simulate accurately in climate models, and their remote locations present a significant observational challenge. A complex set of interacting controlling processes determine the coverage, condensate loading, and microphysical and radiative properties of marine low clouds. Marine low clouds are sensitive to atmospheric aerosol in several ways. Interactions at microphysical scales involve changes in the concentration of cloud droplets and precipitation, which induce cloud dynamical impacts including changes in entrainment and mesoscale organization. Marine low clouds are also impacted by atmospheric heating changes due to absorbing aerosols. The response of marine low clouds to aerosol perturbations depends strongly upon the unperturbed aerosol-cloud state, which necessitates greater understanding of processes controlling the budget of aerosol in the marine boundary layer. Entrainment and precipitation mediate the response of low clouds to aerosols but these processes also play leading roles in controlling the aerosol budget. The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) Climate Research Facility and Atmospheric System Research (ASR) program are making major recent investments in observational data sets from fixed and mobile sites dominated by marine low clouds. This report provides specific action items for how these measurements can be used together with process modeling to make progress on understanding and quantifying the key cloud and aerosol controlling processes in the next 5-10 years. Measurements of aerosol composition and its variation with particle size are needed to advance a quantitative, process-level understanding of marine boundary-layer aerosol budget. Quantitative precipitation estimates that combine radar and lidar measurements are becoming available, and these could be used to test process models, quantify precipitation responses to aerosol, and constrain climate models. Models and observations can be used to constrain how clouds respond dynamically to changing precipitation. New measurements of turbulence from ground-based remote sensing could be used to attempt to relate entrainment to the vertical and horizontal structure of turbulence in the boundary layer. Cloud-top entrainment plays a major role in modulating how low clouds respond to both aerosols and to greenhouse gases, so investment in promising new observational estimates would be beneficial. Precipitation formation and radiative cooling both help marine low clouds to organize on the mesoscale. More work is needed to develop metrics to characterize mesoscale organization, to elucidate mechanisms that determine the type and spatial scale of mesoscale cellular convection, and to understand the role of mesoscale structures in the stratocumulus-to-cumulus transition.

54 ENVIRONMENTAL SCIENCES↗

Bench Scale Process for Low Cost CO 2 Capture Using a Phase-Changing Absorbent: Final Scientific/Technical Report

The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO 2 -capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO 2 -capture absorbent for post-combustion capture of CO 2 from coal-fired power plants. The U.S. Department of Energy’s goal for Transformational Carbon Capture Technologies is the development of technologies available for demonstration by 2025 that can capture 90% of emitted CO 2 with at least 95% CO 2 purity for less than $40/tonne of CO 2 captured. In the first budget period of the project, the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-e project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO 2 capture performance. In the second budget period of the project, individual bench-scale unit operations were tested to determine the performance of each of each unit. Solids production was demonstrated in dry simulated flue gas across a wide range of absorber operating conditions, with single stage CO 2 conversion rates up to 75mol%. Desorber operation was demonstrated in batch mode, resulting in desorption performance consistent with the equilibrium isotherms for GAP-0/CO 2 reaction. Important risks associated with gas humidity impact on solids consistency and desorber temperature impact on thermal degradation were explored, and adjustments to the bench-scale process were made to address those effects. Corrosion experiments were conducted to support selection of suitable materials of construction for the major unit operations in the process. The bench scale unit operations were assembled into a continuous system to support steady state system testing. In the third budget period of the project, continuous system testing was conducted, including closed-loop operation of the absorber and desober systems. Slurries of GAP-0/GAP-0 carbamate/water mixtures produced in the absorber were pumped successfully to the desorber unit, and regenerated solvent was returned to the absorber. A techno-economic analysis, EH&S risk assessment, and solvent manufacturability study were completed.

20 FOSSIL-FUELED POWER PLANTS↗

Sustainable Biosolids/Renewable Energy Plant

In keeping with its designation as being Florida’s first “Green City”, the City's primary purpose of this project is to process and dispose of biosolids and yard wastes in a manner that results in the production of thermal, electrical, gas, or some other form of energy. This project was completed in two budget periods. Budget period one of the project consisted of a feasibility evaluation to determine potential applicable technologies, budget period two consisted of project design.

09 BIOMASS FUELS↗

Integrated Boosting and Hybridization for Extreme Fuel Economy and Downsizing

The objective of this project was to develop, demonstrate, and evaluate commercialization of a highly efficient downsized engine by electrification of the air delivery and waste heat recovery system and optimizing energy usage to achieve significant fuel economy improvement at a commercially viable cost. The system consists of an Electrically Assisted Variable speed Supercharger (EAVS), driven by an electric motor and the engine through a planetary gear train, that provides engine boost pressure and provides the mild hybrid functions of engine start/stop, torque assist, and brake energy recovery. In the exhaust path of the engine is the electric Waste Heat Recovery (eWHR) system, a roots-based expander driven by another electric motor, that enables exhaust gas energy recovery along with controlled back pressure on the engine. The two electric motors are powered by a 48V rechargeable lithium-ion battery. Further, the EAVS system coupled to an EGR valve enables very precise high exhaust recirculation rates to control the NOx emissions. Through two budget periods, the project team of Eaton, Isuzu, Southwest Research Institute and AVL designed and developed the EAVS and eWHR systems, integrated with an Isuzu diesel engine, and validated the target fuel economy performance and emissions by engine dynamometer testing and vehicle level simulations. GT Power model-based analyses results were used to size the EAVS and eWHR systems for the 1.9L Isuzu Spark engine. The two systems were built and the functional testing was carried out to verify the boosting performance of the superchargers. Following the baseline engine dynamometer testing, the two systems were integrated with the engine and the fuel economy performance and emissions were determined by combined steady state and transient testing over three drive cycles, namely, FTP75, NEDC and HWFET. The EAVS/eWHR system demonstrated 4% improvement in fuel economy for the NEDC cycle in engine dyno testing, correlating well with vehicle simulation results (5.3%). The simulation results indicated that the combination of hybrid functions and drivetrain optimization, fuel economy improvement of more than 20% was feasible with the system. The commercialization study to evaluate the cost of the system and the scalability for different engine/vehicle classes was planned for the final budget period but not completed as the project was closed at the end of budget period two.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lab-scale Development of a Hybrid Capture System with Advanced Membrane, Solvent system, and Process Integration

The objective of the project is to achieve lab-scale demonstration of a transformational hybrid membrane/solvent system for the capture of CO 2 from flue gas. A novel process integration scheme was proposed to overcome the low partial pressure of CO 2 present in flue gas. This scheme takes advantage of the potential synergies inherent in the membrane and solvent capture systems. The proposed hybrid technology replaces the second-stage membrane with a solvent capture process. The combustion air is used as a sweeping gas in the solvent stripper. This overall configuration has the major advantages of requiring much less air and eliminating the problems associated with oxygen slip in the membrane-based systems. Even more importantly, because of the presence of the air sweep in the stripper, much lower temperatures are required for solvent regeneration, which enables heat integration to the point that no process steam is required. This project was to perform lab-scale demonstration of Liquid Ion Solutions (LIS) transformational hybrid membrane/solvent system for post-combustion CO 2 capture while demonstrating significant progress toward achievement of the overall fossil energy performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. This report is written chronologically based on budget periods. Each budget period discusses the work performed and its results. At the end of each budget period the milestone charts are provided to show the progress. This project was not able to meet its stated goals. The performances of the power plant equipped with the hybrid process and Baseline Case B12B were compared. The simulation results showed that the power plant equipped with hybrid CO2 capture process has an improved thermal efficiency of 33.4% compared to the Baseline Case B12B, which is 32.5%. However, the COE for the hybrid process is $146.3/MWh which is higher than the $142.8/MWh for Case B12B. If this process were to be applied as a retrofit, it may make sense to use this configuration as it does not require any change in an existing plant configuration and steam cycle. However, for a new powerplant the capital cost is higher than the Case B12B. On the membrane development side, we successfully showed that interfacially-controlled envelope (ICE) membranes work. The inclusion of surface modified nano-particles results in much higher gas diffusivities. The Gen-1 ICE membrane developed under this project showed exceptional improved permeability for CO 2 . However, we ran into major problems which were associated with the scalability and reproducibility of the poly(phosphozene) polymers. The issues with scale-up are and batch to batch variability is also discussed. At the end of this report we have provided our recommendations on materials development for better membrane materials and alluded to the use of much simpler chemistry while keeping the concept of ICE membrane intact. It is also clear that vacuum and compression equipment is costly. If a process which can eliminate the use of vacuum and compression equipment would significantly decrease the overall cost of capture. Some thoughts regarding such system is also provided in the outlook portion of this report.

20 FOSSIL-FUELED POWER PLANTS↗

Major improvements on the longwave radiative interactions between surface and clouds in the polar regions in atmospheric global circulation model

Motivations: One of the most important tasks in the study of physical and socioeconomic aspects of climate change is the simulation of polar climate and how it changes in response to global warming. One import component of the polar energy budget (and thus of polar climate) is the radiative interaction between surface and clouds. As of today, the vast majority of state-of-the-art global climate models (GCMs), including all three US flagship GCMs (NCAR CESM, GFDL CM3, and GISS E2-H/E2-R), still assume constant surface emissivity overall spectral bands in their longwave radiation treatment. Similarly, a majority of state-of-the-art GCMs assume non-scattering clouds in the longwave spectrum, including both the NCAR CESM and GFDL CM3. The issues of ignoring spectral variation in surface emissivity and scattering by clouds manifest themselves in the far-infrared (IR) over the polar continents because (1) there is so little water vapor in such areas that surface far-IR emission can reach clouds; and (2) the imaginary part of the refractive index of ice has a local minimum over 350-550 cm-1, which implies possible strong scattering effects over this spectral region both within and between the snow surface and ice clouds. Our sensitivity studies using CloudSat-retrieved hydrometeor profiles over the high-elevation Antarctic continent show that, in winter, an appropriate inclusion of snow surface spectral emissivity and ice cloud scattering in radiative transfer calculations can noticeably reduce the monthly-mean surface net downward far-IR flux and net atmospheric far-IR emission over the entire region. For the far-IR alone, the magnitude of these effects is ~1Wm-2 or even larger. Projection Objectives: We propose to carry out the following studies: (1) Develop or update schemes that can be used in the CESM to compute the optical properties of the snow surface and ice clouds consistently across the longwave and the shortwave spectrum; (2) Modify the longwave radiation scheme in the CESM such that it can incorporate surface spectral emissivity and scattering of clouds; (3) Validate schemes developed for (1) and (2) against measurements or benchmark models; (4) Evaluate the effects of these new treatments on the simulated polar energy budget and climate by the CESM. Technical Approaches:1.Use a detailed snowpack radiative transfer model to simulate spectrally resolved emissivity of snow surfaces as a function of snow effective radius. The model will be validated against available high spectral-resolution measurements of snow spectral emissivity (ASTER spectra library v2.0). Currently the CESM prognoses vertically-resolved snow effective radius, and snow shortwave albedo is parameterized based on snow effective radius. Our treatment of snow spectral emissivity here will be consistent with the treatment of snow albedo in the shortwave and seamlessly connected with the snow physical module in the CESM. 2. Update the parameterization of ice cloud optical properties in the CESM, for both longwave and shortwave, based on the latest ice-cloud scattering database developed by co-I Prof. Yang. 3. Modify RRTMG_LW, the current longwave radiation scheme in the CESM, to include the surface spectral emissivity and the scattering of clouds in the longwave calculation. Validate modified scheme against a line-by-line radiative transfer model with multiple scattering capability (LBLRTM/CHARTS). 4. Implement products from Steps 1-3 into the CESM and conduct simulations to evaluate their effects on the simulated polar climate and energy budget. These runs will be compared to control runs and evaluated using routine model-observation diagnostics, including data from the ARM NSA (North Slope of Alaska) site. Moreover, a novel aspect in this step is that we will evaluate the simulated longwave band-by-band fluxes and cloud radiative effect against observational counterparts over both polar continents, using a product recently derived by the lead PI Prof. Huang from collocated AIRS and CERES satellite observations from 2002 to 2013. Benefits and outcomes: This project will significantly improve the longwave radiation scheme in the CESM and its successors and provide more realistic treatment of radiative interactions between polar surfaces and clouds. In the future, it will also be straightforward to extend this framework to include spectral emissivity of all surface types. This is responsive to identified DoE Earth System Modeling Science Drivers to improve the performance of the fully coupled climate system modeling and to help address questions on how rapid changes in cryospheric systems interact with the climate system.

54 ENVIRONMENTAL SCIENCES↗

Cryogenic Carbon Capture Development (Final Report)

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant. The specific areas of work in this project are: Budget Period 1: 1) Selection of the most energy-efficient drying system for ambient-pressure flue gas. Sustainable Energy Solutions, LLC (SES) has successfully demonstrated a dryer that removes bulk water using a low-temperature brine to remove about 99% of the water followed by a mol sieve 3A desiccant dryer to remove the remaining 1% water; 2) Selection and demonstration of efficient solution to fouling due to dissolved CO 2 . SES has tested several commercial heat exchangers that purport to be able to handle fouling issues similar to those experienced in the contact liquid chiller. Replicated tests using the CCC ECL™ skid and dimpled brazed plate heat exchangers demonstrate that quick throttling of refrigerant combined with a burst of clean gas mitigate the fouling caused by CO 2 solubility in contact liquid with only minor increases in parasitic load. SES models indicate that parasitic load would increase by approximately 0.0125 GJ/tonne, an order of magnitude less than what was determined to be the maximum allowable additional parasitic load caused by this system; 3) Selection and demonstration of efficient and scalable solid–liquid separation system. The screw press technology met or exceeded the 70% solids loading benchmark during several test runs exceeding 24 hours on the CCC ECL™ skid. The average solids loading during the entire 50-hour run was 67%. The energy demand for this system is less than 0.1 GJ e /tonne of CO 2 processed; 4) Optimize design and demonstration of patented desublimating heat exchangers. We designed and built a hybrid spray tower that was tested over many hundreds of hours and a 50-hour continuous test run was completed capturing over 0.5 tonne CO 2 /day at >90% capture; (5) Plan for safe dilution of oxygen-depleted, cleaned flue-gas stream. The AERSCREEN simulator developed by the EPA modeled the dispersion of oxygen-depleted flue gas from the CCC process at a commercial plant. The results indicate that this plan effectively mitigates the flue gas hazards; (6) Simulation of and experimental work related to multi-pollutant capture. SES programmed an upgrade to its solid/vapor/liquid equilibrium (SVLE) algorithm. This enables simultaneous modeling of multiple pollutants (i.e., CO 2 , SO x , NO x , Hg, HCl). Budget Period 2; (7) Modify the CCC ECL™ skid for field testing and complete shakedown testing. The plans for modifying the CCC ECL™ skid were finalized and put into place. Shakedown testing of the updated CCC ECL™ skid occurred at SES using closed-loop mode (i.e., using a synthetic flue gas consisting of only N 2 and CO 2 ) and at the Hunter Power Plant using flue gas from the coal-fired boiler. Shakedown testing took longer than expected due to delays in receiving equipment and unexpected equipment performance in the field; (8) Operate the CCC ECL™ skid in the field. Longer testing of the CCC ECL™ skid occurred at the Hunter Power Plant. Multiple tests exceeding 35 hours were completed, with a total of over 600 hours of CO 2 capture completed using flue gas at the Hunter Power Plant with an average CO 2 capture rate of over 91% during those hours. Extensive notes and documentation were acquired informing improved methods for controls, startup, operation, and shut down; (9) Determine figures of merit and quantify process improvement. SES defined figures of merit for unit operation performance and overall CCC ECL™ process performance. All figures of merit were achieved or surpassed, except for 500 continuous hours of demonstration at the Hunter Power Plant; (10) Complete an Environmental Health and Safety Risk assessment by a third party. Tri-State completed an Environmental Health and Safety Risk assessment; (11) Update techno-economic analysis with third-party validation. The techno-economic analysis has been completed. It confirms the potential large reduction in energy and cost of the CCC process compared with leading alternatives and that the estimates and estimation techniques are reliable.

20 FOSSIL-FUELED POWER PLANTS↗

Wood-to-Fuel for California's Transportation Sector using Autothermal Pyrolysis (Progress Report for FRD-17-002)

In the month of April, we planned to have the Site License Agreement with SPI signed and fully executed, make further progress on the market assessment for the Wood-to-Bio-oil Market Report, and hoped to have the subcontracts in place with Iowa State University and Frontline BioEnergy, LLC once we have approval from the CAM. We also plan to have the updated budget from Iowa State in order to send both updated sub-recipient budget sheets to the CAM for approval.We continue to make more progress towards getting our subcontracts in place and received the requested adjustments to ISU’s budget sheets. These were sent to the CAM on 4/30/2020. As the COVID-19 situation is country-wide, we anticipate slower responses from our partners due to similar delays in their organizations to what we are experiencing internally. Although their response times will be slower, both ISU and Frontline are continuing to make good progress on their work for the demonstration in Iowa for this summer, which is assisting with keeping us on schedule for the overall effort. We are continuing to work on the required documents for our subcontracts – though neither will be placed before we receive official approval from our CAM – so that once we have approval, we can place them very quickly.

09 BIOMASS FUELS↗

Discovering Blind Geothermal Systems in the Great Basin Region: An Integrated Geologic and Geophysical Approach for Establishing Geothermal Play Fairways: All Phases

Most geothermal resources in the Great Basin region of the western USA are blind, and thus the discovery of new commercial-grade systems requires synthesis of favorable characteristics for geothermal activity. The geothermal play fairway concept involves integration of multiple parameters indicative of geothermal activity to identify promising areas for new development. This project integrated multiple datasets to apply the play fairway concept and assess geothermal potential in a large region of the Great Basin in Nevada. It is therefore referred to as the Nevada play fairway project. This project was a strong collaborative effort between several organizations, led by the Nevada Bureau of Mines and Geology at the University of Nevada, Reno, but with key support from the U.S. Geological Survey, ATLAS Geosciences, Inc,, Hi-Q Geophysical, Inc., Lawrence Berkeley National Laboratory, Utah Geological Survey, and Innovative Geothermal Ltd. In Budget Period 1 of this project, available data for nine geologic, geochemical, and geophysical parameters were initially synthesized to produce a new detailed geothermal potential map of 96,000 km2 from west-central to eastern Nevada. These parameters were grouped into subsets and individually weighted to delineate rankings for local permeability, intermediate permeability, regional permeability, and thermal potential, which collectively defined geothermal play fairways (i.e., most likely locations for significant geothermal fluid flow). This initial work was aimed at reducing the risks in regional exploration and therefore facilitating discovery of new commercial-grade systems in blind settings, as well as in areas with surface expressions of geothermal activity. Budget Period 2 of the project involved detailed analysis of some of the most promising areas identified in Phase 1. Twenty-four highly prospective areas, including both known undeveloped systems and previously undiscovered potential blind systems, were identified for further analysis. After reconnaissance of these areas, five of the most promising sites were selected for detailed studies. Multiple techniques were employed in the detailed studies, including geologic mapping, shallow temperature surveys, gravity surveys, Lidar, geochemical studies, seismic reflection analysis, and 3D modeling. The goal of the detailed studies was to identify specific areas with the highest likelihood for high permeability and thermal fluids, such that drill sites could be targeted. Three main sets of predictive maps were generated for each detailed study area: 1) play fairway maps, 2) play fairway error maps, and 3) direct evidence maps. Local- and intermediate-scale permeability models were revised to reflect results of the detailed geologic, geophysical, and geochemical analyses. Budget Period 3 of the project involved more detailed geophysical analyses and temperature-gradient (TG) drilling in southeastern Gabbs Valley and northern Granite Springs Valley, deemed the two most promising sites, with the goal of providing preliminary validation of the play fairway methodology. In southeastern Gabbs Valley, the collocation of a favorable structural setting (displacement transfer zone and fault intersections), Quaternary faults, intersecting and terminating gravity gradients, magnetic low, shallow (2 m) temperature anomaly, low resistivity anomaly, and promising geothermometry from nearby water wells provided evidence for a blind system. Drilling of six TG holes defines an apparent geothermal system at this locality with temperatures as high as 124°C at 152 m. This system is blind, with no surface hot springs, fumaroles, or paleo-geothermal deposits. For northern Granite Springs Valley, a favorable structural setting (termination of a major Quaternary normal fault), terminating gravity gradient, magnetic gradient, newly discovered sinter deposits, nearby warm water wells, previously drilled TG holes in the vicinity, and promising geothermometry suggest a hidden system. Drilling of six new TG holes yields temperatures of ~96°C at ~250 m, suggesting the presence of a geothermal system. Major lessons learned in the course of this project include: 1) initially identified sites commonly include multiple favorable structural settings at a finer scale; 2) promising sites in Cenozoic basins cannot be recognized without detailed geophysical surveys; and 3) play fairway analysis should be refined as the exploration program vectors into the most promising sites and finer-scale data are acquired. In addition to producing copious amounts of data, this project resulted in 16 published papers, 10 abstracts, more than 40 presentations across the U.S. and abroad (including several keynote addresses), 2 Masters theses, and 7 media reports.

15 GEOTHERMAL ENERGY↗

Technology Development for Modular, Low-Cost, High-Temperature Recuperators for Supercritical CO 2 Power Cycles (Final Report)

The program’s focus was to evaluate, advance, and demonstrate recuperator design concepts, materials, and fabrication methods that facilitate the commercial availability of compact and low-cost recuperators. Emphasis was placed on recompression closed Brayton cycles having a turbine inlet temperature exceeding 700°C and differential pressures on the order of 200 bar and were scalable to accommodate plant sizes from 10 to 1,000 MWe. The primary objectives of the first budget period, which included conceptual design, preliminary development, and prototype fabrication and testing, were accomplished. A new recuperator design concept, stacked-sheet heat exchanger (SSHX), was realized during the project. The design was taken from paper to hardware and successfully tested. The SSHX prototype recuperator met or exceeded program thermal, hydraulic and performance/cost metrics goals. The first budget period was extended to retire risk in scaling the recuperator from the kWt to MWt thermal capacity scale. The fabrication and design requirements for the budget period one extension were met. Delays associated with the Covid-19 pandemic prevented the fabrication and testing of the industrial scale prototype.

14 SOLAR ENERGY↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Revised Monitoring Plan

This report summarizes the revisions made after attainment of project metrics of monitoring 1.5 million metric tons stored which occurred at 1 ½ years and after the end of the period of accelerated injection rate (February 2011) to reach project metrics. Denbury continues downdip injection because of its impact on production, but has modified the rate of injection to meet its EOR objectives. Therefore this project will not have a post-injection “closure” period. Injected CO 2 is being recycled and the flow field is substantively controlled by production. However, a period of observation of this long duration storage has value to the program in terms of showing no impact on near-surface environments and monitoring any changes in the reservoir over the long term. In addition, observations made during the first two years of injection have raised a number of significant questions that can be addressed during the next stages of research. Lastly, budget readjustment is needed, as some tasks have gone over budget and some have been completed under budget, leaving some opportunities to address remaining issues. This report provides an overview of the revisions and supplements proposed to the modeling and monitoring plan to complete the project.

01 COAL, LIGNITE, AND PEAT↗

Regal Beloit Final Technical Report

The original project proposal submitted from NovaTorque Inc (NovaTorque) in 2016 was to improve the existing motor with 95% efficiency by reducing the losses by 21% to achieve 96%. A few months after the proposal was submitted, NovaTorque lost funding and went out of business. The assets of NovaTorque were then acquired by Regal Beloit Corporation (“Regal Beloit” or “Regal”). When the NovaTorque proposal was selected, the project was transferred to Regal Beloit. Once we had production samples from the new Regal production line, they were tested at the Regal Beloit test lab in Wausau, WI. The original NovaTorque motor had an efficiency of 95%, but when the technology was transferred to Regal Beloit, there were multiple manufacturing improvements made, even though the basic electromagnetic design did not change. The test results in Wausau showed that the motors made at the Regal Beloit plant had an efficiency of 96%. Since the goal of the project was to reduce the losses by 21%, a new efficiency target of 96.8% became the project objective. In the first budget period, motors were tested to get the baseline performance. We then used FEA modeling with ANSYS Maxwell to model the existing motor to get correlation between the FEA simulations and the actual test results. Once the model was validated, we evaluated some changes that could be made to the stator to reduce the losses and improve efficiency without changing the rotor or stator housing, keeping the modifications easy to implement. The changes were primarily in the area of making the stator axially shorter and adding Soft Magnetic Composite (SMC) tooth tips. In the second budget period, we proceeded to design and build the new stator that was identified above and identified additional improvements in the process that included a stator machining modification and the use of rectangular wire. When we actually built the motor, the choice of rectangular wire turned out to be a problem. The wire was made by squishing round wire to get the rectangular shape, which caused work hardening, making the wire too stiff to make the desired coils. We shifted to annealed square wire which was better, but we still could not maintain the proper coil envelope. The result was that we had reduced cross section area for stator laminations. We also had to have a radial offset resulting in a radial misalignment between the stator and rotor because of the oversized coils. After the motor was completed, it was shipped to Texas A&M University for testing. With the loss of flux from these issues, the measured motor efficiency was only 96.3%. The primary focus of this motor was to make sure our FEA simulation model predicted the measured losses and overall efficiency, this we moved on to the FEA simulation. The FEA simulations of the motor “as built” with misalignments had good correlation with the test results, so the next step was to use that model to optimize the design of the motor for a final build. This time we considered changes to the stator and rotor and also minor changes to the housing diameter. In the third budget period, we did the detailed design and construction of the final prototypes. The final prototypes had a slight increase in the stator diameter to fit in a standard Regal Beloit housing. We shortened the stator and use more layers of wire in the coils. We also increased the cone angle of the rotor and stator from the original 110 degrees to 130 degrees to get some additional efficiency and optimized the stator cross section. The predicted efficiency from the FEA simulations was 96.9%. When completed, the motors were tested. We were a little short of reaching our target efficiency goal of 96.8%. We were only able to get to 96.7% efficiency. While it may be possible with additional iterations in designs and future builds to gain that additional 0.1%, we believe that we are close to the best we can achieve from a practical viewpoint, and additional iterations would be more work than the potential gains would be worth. No other motor in this class can even reach the 96% that we started with.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) (Final Scientific/Technical Report)

This report summarizes the activities conducted under the DOE VTO funded project DE- EE0008451, where ABB Inc. (ABB), in collaboration with Idaho National Laboratory (INL), APS Global (APS), and XOS Trucks (XOS) pursued the development of a cyber-resilient extreme fast charging (XFC) management system. This project entitled Cybersecurity for Grid Connected eXtreme Fast Charging (XFC) Station (CyberX) focuses on a resilient architecture for smart charging EV Supply Equipment (EVSE) device control and Coordinated Anomaly Detection System (CADS) features that can be added at the charging site depot level to increase cybersecurity. The project was split into two budget periods focused first on developing the threat model and resilient control concepts and second on testing, improving, and validating those developed resilient control algorithms and features with a focus on key vulnerabilities identified during the threat assessment portion of the project. During the first budget period of the CyberX project, the ABB led team focused on activities to identify, model, and quantitatively prioritize high-impact attack scenarios with potential cyber-physical effects while also modeling and developing concepts for a resilient control system that could securely address integration of DERs and other resources with EV charging. Development of the security focused XFC management system (XMS) was accomplished first by offline simulation using a developed XFC station or depot with 480V input level and simulating measurement inputs to monitoring and control systems in concept development. A representative distribution grid model was developed supporting an EV charging site model with BESS and 6 general EV charging models. These EV charging models allowed multiple configurations of charging level, multiple connected protection and measurement devices, and simulation function to show general compromise of EV, BESS, and protection features based on parallel threat analysis. During the second budget period, the EV site and supporting systems model was developed in more detail and converted from offline model to real-time to real-time with EV charging hardware in the loop (HIL). The resilient control architecture developed as concept in the first part of the project was further tested and validated for integration of local energy resources and XFC charging station site equipment while maintaining cybersecure operating principles. The proposed resilient architecture for smart charging and cybersecurity features consists of two main concepts developed and tested within the project. The first concept is an XFC management system (XMS) consisting of a hardware gateway, software platform, and Supervisory Control and Data Acquisition (SCADA) or Distribution Management System integration components. The second concept is a Coordinated Anomaly Detection System (CADS) which forms a primarily software-related subsystem of the total CyberX solution focused on monitoring system measurements, estimation of measurement states, and predicting current at the utility point of interaction based on machine learning for anomaly detection.

33 ADVANCED PROPULSION SYSTEMS↗

A Process with Decoupled Absorber Kinetics and Solvent Regeneration through Membrane Dewatering and In-Column Heat Transfer (Final Report)

This report summarizes the work conducted on project DE-FE0031604 where University of Kentucky Center for Applied Energy (UK CAER) has validated its intensified CO 2 capture process through substantial enhancements to the kinetics of the absorption process and energy reductions by absorber temperature profile modification, dewatering and heat integration technologies for achieving significant capital and operating cost reductions. To address DOE’s objective of improving post-combustion CO 2 capture technology and reducing associated cost, UK CAER employed an intensified process which combined three key aspects targeted at overcoming inherent limitations or barriers in the conventional CO 2 capture and desorption process. The process designed to be independent of the type of solvent used, included (1) the use of 3-D printed two-channel structured packing material to control the temperature profile and increase the CO 2 absorption rate in the absorber, (2) a zeolite membrane dewatering unit for dewatering of the carbon-rich solvent to decouple solvent concentration needs for CO 2 absorption and desorption, and (3) a rich-split feed with two-phase flow heat transfer prior to the stripper that provided a secondary point of vapor generation to provide energy savings in steam extraction and solvent regeneration. The project was executed over two budget periods. This involved testing of individual process components which included the advanced heat transfer packing and the dewatering membrane on UK CAER’s 30 liter per minute (L/min) CO 2 (3” Column) capture bench unit with simulated flue gas in the first budget period. Subsequent scaled-up testing of these components together with the split-feed configuration were also tested in UK CAER’s 0.1 MWth CO 2 capture unit with coal-derived flue gas in the second-budget period. Long term studies were done during this period to assess process and solvent performance over extended duration. Project partners Lawrence Livermore National Laboratory (LLNL) and Media & Process Technology (MPT) led the development efforts for the advanced packing material and dewatering membrane respectively. Data from the long term testing was used as input for an environmental, health and safety (EH&S) assessment for the process and scaled technology performed by ALL4 LLC. Trimeric Corporation also completed a techno-economic analysis (TEA) for the UK CAER technology which was compared to the DOE reference Case B12B. Tests on the 3” column capture unit showed that the advanced heat transfer packing could be used to lower the bulge temperature in the absorber, and this was also proven in the scaled testing in the 0.1 MWth CO 2 capture unit. The bulge temperature could be lowered by >10 °C, changing the temperature profile in the absorber, and showed potential to enhance absorption with the ability to tailor the profile to provide conditions suitable for a solvent’s properties and kinetics. Conditions for short term evaluation of a 19” zeolite dewatering membrane on the 3” column capture unit yielded desirable fluxes and sustained rejection rates of >80%. However, for the scaled testing of six membrane modules consisting of 21 parts of 31-inch-long membrane tubes in each bundle (surface area 0.3 m 2 ), over a more extended duration, similar rejection rates could not be achieved. With the split-feed of the rich stream to the stripper, improved heat recovery minimized waste heat exiting the top of the stripper. The stripper exhaust temperatures could be reduced by >10 °C; reducing the amount of water vaporization contributed to lowering the regeneration energy by ~ 15%. The energy benefit could be sustained from the long term monitoring of the solvent performance. The solvent properties were not significantly impacted over the long-term operations. The benefits of the UK CAER process demonstrated experimentally were mostly validated from the TEA comparing a commercial scale application of the technology to DOE reference Case B12B. The cost of CO 2 capture for the UK CAER technology was estimated to be ~$34.97/tonne of CO 2 captured; a reduction of 23% compared to Case B12B. The increase in cost of electricity was also shown to be 16% lower than that of Case B12B. The total parasitic demand was also shown to be 11% lower. The key drivers for the benefits are a result of the process intensification approaches employed in the UK CAER technology for enhanced solvent performance, effective heat recovery and improved energy performance. The EH&S assessment did not find any major environmental concerns or barriers to the full scale implementation of the technology.

20 FOSSIL-FUELED POWER PLANTS↗

Development and Demonstration of a Fuel-Efficient, Class 8 Tractor & Trailer Engine System (SuperTruck II)

Navistar presents the SuperTruck II (ST II) Final Report to the Unites States Department of Energy (US DOE), which covers the five Budget Periods (BPs) from 10-1-2016 through 6-30-2022. For ST II, Navistar built on the achievements of the SuperTruck I (ST I) Program as a catalyst to continue critical research, design and development, testing, and operations to reach the ambitious goals of the ST II project. This approach allowed Navistar to continue contributing to the essential needs of our nation for safe, efficient, and cost-effective delivery of goods and services, as we reduced negative environmental effects and improved operational productivity. This document contains information specified in DOE F 4600.2, Final Scientific/Technical Report DOE F 241.3, B. SCIENTIFIC/TECHNICAL REPORTS, explaining how we met and exceeded program requirements. Throughout this Final Report, Navistar extracted information from documents prepared during the project that represent our management, design and development, building, and testing efforts to meet and exceed SuperTruck II project goals. Navistar followed Plan requirements to achieve / exceed Project Objectives: a) >100% improvement in vehicle freight efficiency (FE) (on ton-MPG basis) relative to 2009 baseline with stretch goal of 140% improvement [actual: 170%); b) >55% engine brake thermal efficiency (BTE) demonstrated in operational engine at a 65-mph cruise point on a dynamometer – ≥31% increase from 2009 baseline [actual: 55.20% of combined BTE) ; and c) development and implementation of commercially cost effective technologies (in terms of a simple payback). Technology selection / development path focused on developing technologies applicable for production within 3-year approach, while ensuring technology readiness and cost of ownership for end users. The Program was organized into five budget periods: Requirements / Technology Assessment and Initial Hardware Testing; Technology Development and Concept Readiness Demonstration; Technology Finalization and Validation Tractor / Trailer Fabrication, Integration and Commissioning Demonstration; and Fuel Economy (FE) and Brake Thermal Efficiency (BTE) and Program Completion. Leadership was provided by DOE, with tasks performed by laboratories (Argonne National Laboratory, Lawrence Livermore National Laboratory); partners at Bosch, TPI, Dana, and J.B. Hunt; , and support from University of Michigan and Clemson University. Navistar lead this team with Principal Investigator / Contracting Officer; Project Manager (PM); Vehicle, Engine, and Aftertreatment Engineers; Finance Manager, Technical Program Leads, and Legal/IP; and other key personnel. Work also included personnel in risk management; funding / budget / finance. Work involved analysis, development, testing, and down selection of individual/system engine, aftertreatment, and vehicle technologies, with integration of selected technologies into a prototype vehicle for demonstration of fuel-efficiency gain. Work also included component/integrated system level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. As ST II progressed, Navistar performed computer-based modeling / simulations of technologies focused on the primary operational areas: Engine, Aftertreatment, and Vehicle. During the ST II Program, the COVID Virus outbreak unexpectedly challenged by the effects of, which affected staffing, scheduling, design, supplies, availability of materials, production procedures, and testing. The DOE responded by extending the program by three quarters to ensure that project tasks were completed for this vital project. Focus continued on analyzing, developing, testing, and down selecting individual-/system-level engine and vehicle technologies for integration of the final selected technologies into a prototype vehicle that would demonstrate fuel-efficiency gains made possible through these technologies. This included component/integrated system-level development of truck and trailer aerodynamics, base engine efficiency, advanced aftertreatment, combustion efficiency, waste heat recovery, solar power, distributed and intelligent vehicle power, hybrid powertrain, reduced rolling resistance, weight reduction, idle reduction, and driver feedback. Throughout the program, function, reliability, and performance at all levels were ensured through testing. Proof of this approach was demonstrated in multiple, on-road demonstrations: Scenario A (Flatland) Fuel Economy, Scenario B (Hilly) Fuel Economy, and City Cycle Tests. Other benefits derived from ST II included new/improved products, publications, patents, and next-step capabilities related to electric/hydrogen vehicles and autonomous driving.

Zukouski, Russ↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

Z Facility Sustainment Status (April FY 2023) [Slides]

98% of the budget is deployed, remaining $325,000 to be assigned by the end of May. Costs plus Commitments total 58% of the deployed budget. 29 projects have been kicked off and are in progress. Five project plans are being finalized and will be kicked off early summer. The February start has contributed to the risk of not costing all of the FY23 budget.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High Performance (R-10/inch) Clay-Cellulose-Silica Nanopore Insulation Board For New and Retrofit Buildings (Final Scientific Report)

The objective of Liatris’s 3-year DOE BENEFIT project was to develop and validate a high-performance, lightweight, aerogel-based insulation board of ≥R-10/inch at a cost of ≤$\$$1.50 per board foot using non-flammable inorganic nanocomposites. We have summarized each yearly goal below: Year 1 – Ambient dried inorganic/organic nanocomposite, R-6/inch Year 2 – Processing efficiency and cost down, R-8/inch at $\$$2.0/board-ft Year 3 – Scale up to continuous, pilot production of R-10 at ≤ $\$$1.50/board-ft Over the course of the project period, Liatris has successfully met or exceeded all of the goals outlined above. The project scope over 3 years was extensive, covering method development of ambient dried silica aerogels in Budget Period 1, process formulation and R-value improvement in Budget Period 2, and composite scale up with corporate partners in Budget Period 3. Over the course of the project Liatris has been able to progressively improve the thermal resistance properties from about R-6/in to > R-11/in, 2-3X the performance of conventional insulation products.

36 MATERIALS SCIENCE↗