Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,459 records · Page 81

AGR-1 Compact 1-3-1 Post-Irradiation Examination Results

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform the requisite research and development on tristructural isotropic (TRISO) coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel program. The overarching program goal is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety testing, fuel performance modeling, and fission product transport (INL 2015). A series of fuel irradiation experiments is being planned and conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). These experiments will provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for safety testing, and support the development of fuel performance and fission product transport models. The first of these irradiation tests, designated AGR-1, began in the ATR in December 2006 and ended in November 2009. This experiment was conducted primarily to act as a shakedown test of the multicapsule test train design and provide early data on fuel performance for use in fuel fabrication process development. It also provided samples for post-irradiation safety testing, where fission product retention of the fuel at high temperatures will be experimentally measured. The capsule design and details of the AGR-1 experiment have been presented previously (Grover, Petti, and Maki 2010, Maki 2009).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

VTR Startup Fuel Paper for NFSM

A 2017 report issued by the Department of Energy Office of Nuclear Energy’s (DOE-NE) Nuclear Energy Advisory Committee (NEAC) discussed needs and requirements for a new test reactor in the U.S. The report included a recommendation to “proceed immediately with pre-conceptual design planning activities to support a new test reactor (including cost and schedule estimates).”

99 GENERAL AND MISCELLANEOUS↗

CHLORIDE WASHER PERFORMACE TESTING

Testing was performed to determine the chloride (Cl-) removal capabilities of the Savannah River National Laboratory (SRNL) designed and built Cl- washing equipment intended for HB-Line installation. The equipment to be deployed was tested using a cerium oxide (CeO2) based simulant in place of the 3013 plutonium oxide (PuO2) material. Two different simulant mixtures were included in this testing -- one having higher Cl- content than the other. The higher Cl- simulant was based on K-Area Interim Surveillance Inspection Program (KIS) material with Cl- content approximately equal to 70,000 ppm. The lower Cl- level simulant was comparable to KIS material containing approximately 8,000-ppm Cl- content. The performance testing results indicate that the washer is capable of reducing the Cl- content of both surrogates to below 200 ppm with three 1/2-liter washes of 0.1M sodium hydroxide (NaOH) solution. Larger wash volumes were used with similar results - all of the prescribed test parameters consistently reduced the Cl- content of the surrogate to a value below 200 ppm Cl- in the final washed surrogate material. The washer uses a 20-micron filter to retain the surrogate solids. Tests showed that 0.16-0.41% of the insoluble fraction of the starting mass passed through the 20-micron filter. The solids retention performance indicates that the fissile masses passing through the 20-micron filter should not exceed the waste acceptance criteria for discard in grout to TRU waste. It is recommended that additional testing be pursued for further verification and optimization purposes. It is likely that wash volumes smaller than those tested could still reduce the Cl- values to acceptable levels. Along with reduced wash volumes, reuse of the third wash volume (in the next run processed) should be tested as a wash solution minimization plan. A 67% reduction in the number of grouted paint pails could be realized if wash solution minimization testing returned acceptable results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Investigation Plan for Corrective Action Unit 576: Miscellaneous Radiological Sites and Debris Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 576 is located in Areas 2, 3, 5, 8, and 9 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 576 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 576, which comprises the following corrective action sites (CASs): 00-99-01, Potential Source Material; 02-99-12, U-2af (Kennebec) Surface Rad-Chem Piping; 03-99-20, Area 3 Subsurface Rad-Chem Piping; 05-19-04, Frenchman Flat Rad Waste Dump ; 09-99-08, U-9x (Allegheny) Subsurface Rad-Chem Piping; 09-99-09, U-9its u24 (Avens-Alkermes) Surface Contaminated Flex Line These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document (CADD).

54 ENVIRONMENTAL SCIENCES↗

Development of ITM Oxygen Technology for Integration in IGCC and Other Advanced Power Generation DECISION POINT 1 UNDER PHASE 3

Air Products and the DOE have partnered over a number of years in the development of ITM Oxygen technology in support of gasification technology. Throughout this process, studies of application of the technology to IGCC and oxy-coal combustion have shown significant reduction in capital and operating costs compared to similar systems using conventional cryogenic air separation. Phase 3, the current phase of the program, focuses on the design, construction and operation of a 30- to 100-TPD pilot facility, the Intermediate Scale Test Unit (ISTU). Execution of this phase to date has resulted in significant advances in a number of areas including ceramic membrane material development, module design and production, ceramic-to-metal seal design, process control strategies, and engineering development of process cycles. Phase 3 will be complete upon successful operation of the ISTU in a series of tests making oxygen from ceramic membrane modules and producing power from a hot gas expander. Phase 3 work has extended beyond the planned schedule due to a delay in delivery of equipment from vendors. Air Products is currently managing the equipment delay by close involvement with the vendor to redesign the problematic equipment and oversee its fabrication. The result of these unforeseen challenges is that the ISTU project completion date has been delayed. Tight cost controls have been implemented both by DOE program management and APCI to meet budget constraints despite increased costs due to budget delays. Total project costs have increased in several areas. Increased costs in the ISTU project include purchased equipment, instruments, construction, and contractor engineering. Increased costs for other tasks include additional work in support of module production by Ceramatec, Inc, and increased Air Products labor for component testing. Air Products plans to complete testing as outlined in the SOPO and successfully complete all project objectives by the end of FY14.

Anderson, Lori↗

AGR 3/4 Irradiation Test Final As Run Report

Several fuel and material irradiation experiments have been planned for the Idaho National Laboratory Advanced Reactor Technologies Technology Development Office Advanced Gas Reactor Fuel Development and Qualification Program (referred to as the INL ART TDO/AGR fuel program hereafter), which supports the development and qualification of tristructural-isotropic (TRISO) coated particle fuel for use in HTGRs. The goals of these experiments are to provide irradiation performance data to support fuel process development, qualify fuel for normal operating conditions, support development and validation of fuel performance and fission product transport models and codes, and provide irradiated fuel and materials for post irradiation examination and safety testing (INL 05/2015). AGR-3/4 combined the third and fourth in this series of planned experiments to test TRISO coated low enriched uranium (LEU) oxycarbide fuel. This combined experiment was intended to support the refinement of fission product transport models and to assess the effects of sweep gas impurities on fuel performance and fission product transport by irradiating designed-to-fail fuel particles and by measuring subsequent fission metal transport in fuel-compact matrix material and fuel-element graphite. The AGR 3/4 fuel test was successful in irradiating the fuel compacts to the burnup and fast fluence target ranges, considering the experiment was terminated short of its initial 400 EFPD target (Collin 2015). Out of the 48 AGR-3/4 compacts, 42 achieved the specified burnup of at least 6% fissions per initial heavy-metal atom (FIMA). Three capsules had a maximum fuel compact average burnup < 10% FIMA, one more than originally specified, and the maximum fuel compact average burnup was <19% FIMA for the remaining capsules, as specified. Fast neutron fluence fell in the expected range of 1.0 to 5.5×1025 n/m2 (E >0.18 MeV) for all compacts. In addition, the AGR-3/4 experiment was globally successful in keeping the temperature in the twelve capsules relatively flat in a range of temperatures suitable for the measurement of fission product diffusion in compact matrix and structural graphite materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cesium Removal from Tank Waste Simulants Using Crystalline Silicotitanate at 12% and 100% TSCR Bed Heights

The Direct Feed Low-Activity Waste flowsheet provides for the early production of immobilized low-activity waste (LAW) by feeding waste directly from Hanford tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) for vitrification. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank waste supernatant will be pretreated by the Tank Side Cesium Removal (TSCR) system to meet the WTP LAW waste acceptance criteria (<3.18E-5 Ci 137 Cs/mole of Na). This pretreatment will remove cesium from the waste stream using ion exchange (IX). The selected media for IX is crystalline silicotitanate (CST), product number UOP-IONSIV-R9140-B, manufactured by Honeywell UOP LLC (Des Plaines, IL). Testing was requested by Washington River Protection Solutions to better define IX processing using Low-Activity Waste Pretreatment System (LAWPS) prototypic IX unit operation process steps at full height and medium height. The information is intended to significantly contribute towards establishing accurate process flowsheets for the individual feed campaigns planned for the LAWPS. Column testing at both the medium (12% of the full bed height) and full height scales was conducted to evaluate process variables and scale up performance of Cs exchange onto the CST, Lot 8056202-999. Nominal process conditions used 5.6 M Na simulant processed at 1.8 bed volumes per hour (BV/h) at 20 °C. Process variables included 1) increased process temperature to 35 °C, 2) increased Na concentration to 6.0 M, 3) added organics to the 5.6 M Na simulant, and 4) flowrate changes. The medium scale tests used single columns containing 44 mL of <25 mesh CST in a 1.44 cm diameter column, 27 cm tall CST bed. The full height columns used lead/lag columns containing 1.15 L unsieved (as-received) CST in 2.54-cm-diameter columns, 226 cm tall CST beds. Two process flowrates were tested at the full height: 1.30 and 1.82 BV/h. IX testing with simulant solutions was conducted using TSCR prototypic IX unit operations: feed processing, feed displacement with 0.1 M NaOH, water rinse, and solution expulsion with compressed air.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-628: Predicted Risk of Post-Irradiation Cerebral Necrosis in Pediatric Brain Cancer Patients: A Treatment Planning Comparison of Proton Vs. Photon Therapy

Purpose: Post-irradiation cerebral necrosis (PICN) is a severe late effect that can Result from brain cancers treatment using radiation therapy. The purpose of this study was to compare the treatment plans and predicted risk of PICN after volumetric modulated arc therapy (VMAT) to the risk after passively scattered proton therapy (PSPT) and intensity modulated proton therapy (IMPT) in a cohort of pediatric patients. Methods: Thirteen pediatric patients with varying age and sex were selected for this study. A clinical treatment volume (CTV) was constructed for 8 glioma patients and 5 ependymoma patients. Prescribed dose was 54 Gy over 30 fractions to the planning volume. Dosimetric endpoints were compared between VMAT and proton plans. The normal tissue complication probability (NTCP) following VMAT and proton therapy planning was also calculated using PICN as the biological endpoint. Sensitivity tests were performed to determine if predicted risk of PICN was sensitive to positional errors, proton range errors and selection of risk models. Results: Both PSPT and IMPT plans resulted in a significant increase in the maximum dose and reduction in the total brain volume irradiated to low doses compared with the VMAT plans. The average ratios of NTCP between PSPT and VMAT were 0.56 and 0.38 for glioma and ependymoma patients respectively and the average ratios of NTCP between IMPT and VMAT were 0.67 and 0.68 for glioma and ependymoma plans respectively. Sensitivity test revealed that predicted ratios of risk were insensitive to range and positional errors but varied with risk model selection. Conclusion: Both PSPT and IMPT plans resulted in a decrease in the predictive risk of necrosis for the pediatric plans studied in this work. Sensitivity analysis upheld the qualitative findings of the risk models used in this study, however more accurate models that take into account dose and volume are needed.

61 RADIATION PROTECTION AND DOSIMETRY↗

Comparison of Heart and Coronary Artery Doses Associated With Intensity-Modulated Radiotherapy Versus Three-Dimensional Conformal Radiotherapy for Distal Esophageal Cancer

Purpose: To compare heart and coronary artery radiation exposure using intensity-modulated radiotherapy (IMRT) vs. four-field three-dimensional conformal radiotherapy (3D-CRT) treatment plans for patients with distal esophageal cancer undergoing chemoradiation. Methods and Materials: Nineteen patients with distal esophageal cancers treated with IMRT from March 2007 to May 2008 were identified. All patients were treated to 50.4 Gy with five-field IMRT plans. Theoretical 3D-CRT plans with four-field beam arrangements were generated. Dose-volume histograms of the planning target volume, heart, right coronary artery, left coronary artery, and other critical normal tissues were compared between the IMRT and 3D-CRT plans, and selected parameters were statistically evaluated using the Wilcoxon rank-sum test. Results: Intensity-modulated radiotherapy treatment planning showed significant reduction (p < 0.05) in heart dose over 3D-CRT as assessed by average mean dose (22.9 vs. 28.2 Gy) and V30 (24.8% vs. 61.0%). There was also significant sparing of the right coronary artery (average mean dose, 23.8 Gy vs. 35.5 Gy), whereas the left coronary artery showed no significant improvement (mean dose, 11.2 Gy vs. 9.2 Gy), p = 0.11. There was no significant difference in percentage of total lung volume receiving at least 10, 15, or 20 Gy or in the mean lung dose between the planning methods. There were also no significant differences observed for the kidneys, liver, stomach, or spinal cord. Intensity-modulated radiotherapy achieved a significant improvement in target conformity as measured by the conformality index (ratio of total volume receiving 95% of prescription dose to planning target volume receiving 95% of prescription dose), with the mean conformality index reduced from 1.56 to 1.30 using IMRT. Conclusions: Treatment of patients with distal esophageal cancer using IMRT significantly decreases the exposure of the heart and right coronary artery when compared with 3D-CRT. Long-term studies are necessary to determine how this will impact on development of coronary artery disease and other cardiac complications.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Thermal hydraulic analysis of the AFIP-7 irradiation test in the Advanced test Reactor – Model correlation and performance evaluation

We report as a system level code, RELAP5 is widely used in the nuclear field for the reactor hydraulic analysis. In the component/experimental level, it is frequently employed as well. This paper demonstrates that the RELAP5 flow simulation of the AFIP-7 irradiation experiment which has a complicated 3D geometry/flow path deviates by ~28% from the flow evaluation through a computational fluid dynamics (CFD) simulation, which has been validated against a flow test performed at Oregon State University. Thermal safety compliance analysis of an experiment planned to be irradiated in the Advanced Test Reactor is usually performed using the finite element analysis code, Abaqus. This research reveals the disadvantages of the Abaqus simulation in the flow instability and departure from nucleate boiling evaluations via a conjugate heat transfer analysis of the AFIP-7 irradiation experiment. As a result, a detailed CFD simulation is suggested for irradiation experiments with complicated flow paths, rather than a simplified RELAP5 simulation or hand calculations. The validated simulation approach will be integrated with the Boehmite correlations to investigate the oxide growth prediction on the fuel cladding in Part II of this research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wave Tank Testing Report for Controls Validation of a Heaving Point Absorber

The core objectives of this project is to improve the power capture of three different wave energy conversion (WEC) devices by more than 50% using an advanced control system and validate the attained improvements using wave tank and full scale testing. In parallel, we will bring along the development of a wave prediction system that is required to enable effective control and test it at full scale. The purposes of this report are to: 1. Plan and document the 1/25th scale device testing at the wave-tank facility; 2. Document the test article, setup and methodology, sensor and instrumentation, mooring, electronics, wiring, and data flow and quality assurance; 3. Communicate the testing results between the associated members; 4. Facilitate reviews that will help to ensure all aspects (risk, safety, testing procedures, etc.); 5. Provide a systematic guide to setting up, executing and decommissioning the experiment.

16 TIDAL AND WAVE POWER↗

Facility Location Optimization Model for COVID-19 Resources

In response to anticipated resource shortfalls related to the treatment and testing of COVID-19, many communities are planning to build additional facilities to increase capacity. These facilities include field hospitals, testing centers, mobile manufacturing units, and distribution centers. In many cases, these facilities are intended to be temporary and are designed to meet an immediate need. When deciding where to place new facilities many factors need to be considered, including the feasibility of potential locations, existing resource availability, anticipated demand, and accessibility between patients and the new facility. In this project, a facility location optimization model was developed to integrate these key pieces of information to help decision makers identify the best place, or places, to build a facility to meet anticipated resource demands. The facility location optimization model uses the location of existing resources and the anticipated resource demand at each location to minimize the distance a patient must travel to get to the resource they need. The optimization formulation is presented below. The model was designed to operate at the county scale, where patients are grouped per county. This assumption can be modified to integrate other scales or include individual patients.

60 APPLIED LIFE SCIENCES↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Materials Management U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO)

In light of the changing Defense Complex mission, the high cost to storing and protecting nuclear materials, and in consideration of scarcity of resources, it is imperative that the U.S. Department of Energy (DOE) owned nuclear materials are managed effectively. The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Strategic Action Plan outlines the strategy for continuing to meet America’s nuclear security goals, meeting the overall mission challenges of DOE and NNSA as well as giving focus to local missions. The mission of the NNSA/NSO Nuclear Materials Management (NMM) Program is to ensure that nuclear material inventories are accurately assessed and reported, future material needs are adequately planned, and that existing Nevada Test Site (NTS) inventories are efficiently utilized, staged, or dispositioned. The NNSA/NSO understands that the NTS has unique characteristics to serve and benefit the nation with innovative solutions to the complex problems involving Special Nuclear Materials, hazardous materials, and multi-agency, integrated operations. The NNSA/NSO is defining infrastructure requirements for known future missions, developing footprint consolidation strategic action plans, and continuing in the path of facility modernization and improvements. The NNSA/NSO is striving for the NTS to be acknowledged as an ideal location towards mission expansion and growth. The NTS has the capability of providing isolated, large scale construction and development locations for nuclear power or alternate energy source facilities, expanded nuclear material storage sites, and for new development in “green” technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Poster — Thur Eve — 58: Dosimetric validation of electronic compensation for radiotherapy treatment planning

In this study we investigate the deliverability of dosimetric plans generated by the irregular surface compensator (ISCOMP) algorithm for 6 MV photon beams in Eclipse (Varian Medical System, CA). In contrast to physical tissue compensation, the electronic ISCOMP uses MLCs to dynamically modulate the fluence of a photon beam in order to deliver a uniform dose at a user defined plane in tissue. This method can be used to shield critical organs that are located within the treatment portal or improve dose uniformity by tissue compensation in inhomogeneous regions. Three site specific plans and a set of test fields were evaluated using the γ-metric of 3%/ 3 mm on Varian EPID, MapCHECK, and Gafchromic EBT3 film with a clinical tolerance of >95% passing rates. Point dose measurements with an NRCC calibrated ionization chamber were also performed to verify the absolute dose delivered. In all cases the MapCHECK measured plans met the gamma criteria. The mean passing rate for the six EBT3 film field measurements was 96.2%, with only two fields at 93.4 and 94.0% passing rates. The EPID plans passed for fields encompassing the central ∼10 × 10 cm{sup 2} region of the detector; however for larger fields and greater off-axis distances discrepancies were observed and attributed to the profile corrections and modeling of backscatter in the portal dose calculation. The magnitude of the average percentage difference for 21 ion chamber point dose measurements and 17 different fields was 1.4 ± 0.9%, and the maximum percentage difference was −3.3%. These measurements qualify the algorithm for routine clinical use subject to the same pre-treatment patient specific QA as IMRT.

60 APPLIED LIFE SCIENCES↗

High-Temperature Salt Pump Review and Guidelines - Phase I Report

Fluoride salt cooled high-temperature reactor (FHR) concepts include pumps for forced circulation of the primary and secondary coolants. As part of a cooperative research and development agreement between the Shanghai Institute of Applied Physics and the Oak Ridge National Laboratory (ORNL), a research project was initiated to aid in the development of pumps for high-temperature salts. The objectives of the task included characterization of the behavior of an existing ORNL LSTL pump; design and test a modified impeller and volute for improved pump characteristics; and finally, provide lessons learned, recommendations, and guidelines for salt pump development and design. The pump included on the liquid salt test loop (LSTL) at ORNL served as a case study. This report summarizes the progress to date. The report is organized as follows. First, there is a review, focused on pumps, of the significant amount of work on salts at ORNL during the 1950s 1970s. The existing pump on the LSTL is then described. Plans for hot and cold testing of the pump are then discussed, including the design for a cold shakedown test stand and the required LSTL modifications for hot testing. Initial hydraulic and vibration modeling of the LSTL pump is documented. Later, test data from the LSTL will be used to validate the modeling approaches, which could then be used for future pump design efforts. Some initial insights and test data from the pump are then provided. Finally, some preliminary design goals and requirements for a future LSTL pump are provided as examples of salt pump design considerations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improving Vertical Velocity Retrievals from Doppler Radar Observations of Convection Field Campaign Report

Our National Science Foundation (NSF)-supported project was designed to address two longstanding challenges in radar-, meso-scale-, and hydro-meteorology: (1) mitigating the effects of non-simultaneous data collection on radar data-based analysis products, and (2) improving estimates of the vertical velocity (w) field in dual-Doppler wind analyses. Errors associated with the non-simultaneous data collection introduce errors in all Doppler analyses, and impose a lower limit on the time and space scales that can be studied. For many investigations the w field is of prime meteorological importance, but it is the velocity component most difficult to accurately synthesize from dual-Doppler wind observations. Our original plan proposed for short field campaigns at the Atmospheric Radiation Measurement (ARM) user facility Southern Great Plains (SGP) Central Facility (CF) was to use multiple-Doppler radial wind data from the scanning ARM X-band radars to test and refine our multiple-Doppler wind analysis algorithms. An important part of our plan was the use of high-temporal-resolution w observations to verify the analyses. In our original plan, these data would be obtained from Doppler lidars, 915 MhZ profilers and Ka-band ARM Zenith Radar (KAZR) zenith-pointing radars at the CF and nearby ARM facilities in north-central Oklahoma. Using the data, we planned to test the utility of new spatially variable advection-correction/analysis procedures, the utility of the anelastic vertical vorticity equation as a constraint in variational multiple-Doppler wind analysis, and other Doppler wind analysis procedures. Idealized tests with numerically-simulated supercell data had suggested the vorticity constraint could help improve the vertical velocity field if the data were gathered with sufficiently high temporal resolution (e.g., volume scans completed in 30-60 sec), so we were interested in exploring the use of rapid-scan data from the X-band Scanning ARM Precipitation Radars (XSAPRs).

Southern Great Plains, convection, KAZR, XSAPR, ve↗

Vector-model-supported approach in prostate plan optimization

Lengthy time consumed in traditional manual plan optimization can limit the use of step-and-shoot intensity-modulated radiotherapy/volumetric-modulated radiotherapy (S&S IMRT/VMAT). A vector model base, retrieving similar radiotherapy cases, was developed with respect to the structural and physiologic features extracted from the Digital Imaging and Communications in Medicine (DICOM) files. Planning parameters were retrieved from the selected similar reference case and applied to the test case to bypass the gradual adjustment of planning parameters. Therefore, the planning time spent on the traditional trial-and-error manual optimization approach in the beginning of optimization could be reduced. Each S&S IMRT/VMAT prostate reference database comprised 100 previously treated cases. Prostate cases were replanned with both traditional optimization and vector-model-supported optimization based on the oncologists' clinical dose prescriptions. A total of 360 plans, which consisted of 30 cases of S&S IMRT, 30 cases of 1-arc VMAT, and 30 cases of 2-arc VMAT plans including first optimization and final optimization with/without vector-model-supported optimization, were compared using the 2-sided t-test and paired Wilcoxon signed rank test, with a significance level of 0.05 and a false discovery rate of less than 0.05. For S&S IMRT, 1-arc VMAT, and 2-arc VMAT prostate plans, there was a significant reduction in the planning time and iteration with vector-model-supported optimization by almost 50%. When the first optimization plans were compared, 2-arc VMAT prostate plans had better plan quality than 1-arc VMAT plans. The volume receiving 35 Gy in the femoral head for 2-arc VMAT plans was reduced with the vector-model-supported optimization compared with the traditional manual optimization approach. Otherwise, the quality of plans from both approaches was comparable. Vector-model-supported optimization was shown to offer much shortened planning time and iteration number without compromising the plan quality.

61 RADIATION PROTECTION AND DOSIMETRY↗