CHLORIDE WASHER PERFORMACE TESTING

Abstract

Testing was performed to determine the chloride (Cl-) removal capabilities of the Savannah River National Laboratory (SRNL) designed and built Cl- washing equipment intended for HB-Line installation. The equipment to be deployed was tested using a cerium oxide (CeO2) based simulant in place of the 3013 plutonium oxide (PuO2) material. Two different simulant mixtures were included in this testing -- one having higher Cl- content than the other. The higher Cl- simulant was based on K-Area Interim Surveillance Inspection Program (KIS) material with Cl- content approximately equal to 70,000 ppm. The lower Cl- level simulant was comparable to KIS material containing approximately 8,000-ppm Cl- content. The performance testing results indicate that the washer is capable of reducing the Cl- content of both surrogates to below 200 ppm with three 1/2-liter washes of 0.1M sodium hydroxide (NaOH) solution. Larger wash volumes were used with similar results - all of the prescribed test parameters consistently reduced the Cl- content of the surrogate to a value below 200 ppm Cl- in the final washed surrogate material. The washer uses a 20-micron filter to retain the surrogate solids. Tests showed that 0.16-0.41% of the insoluble fraction of the starting mass passed through the 20-micron filter. The solids retention performance indicates that the fissile masses passing through the 20-micron filter should not exceed the waste acceptance criteria for discard in grout to TRU waste. It is recommended that additional testing be pursued for further verification and optimization purposes. It is likely that wash volumes smaller than those tested could still reduce the Cl- values to acceptable levels. Along with reduced wash volumes, reuse of the third wash volume (in the next run processed) should be tested as a wash solution minimization plan. A 67% reduction in the number of grouted paint pails could be realized if wash solution minimization testing returned acceptable results.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Coughlin, J, David Best, D, Robert Pierce, R. 2007-11-30. CHLORIDE WASHER PERFORMACE TESTING. https://doi.org/10.2172/915111. https://engineeringpapers.com/record/osti%3A915111/chloride-washer-performace-testing

Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗