Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,441 records · Page 80

EMP, Attachment 1: Sampling and Analysis Plan (Rev.1)

This Sampling and Analysis Plan (SAP) is written for the Environmental Radiation Task activities related to radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance of Pacific Northwest National Laboratory (PNNL) operations at the PNNL-Richland campus and PNNL-Sequim campus. PNNL is a U.S. Department of Energy Office of Science laboratory in Richland, Washington. This plan is an attachment to PNNL’s Environmental Radiological Air Monitoring Plan (EMP) (PNNL-20919) and addresses a discrete, vital subject area that is subject to revision independent of the main text of the EMP document. This SAP provides the requirements for planning sampling events and the requirements imposed on the services provided by the analytical laboratory to the PNNL Environmental Radiation Task.

40 CFR 61 Subpart H↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

EMP - Environmental Radiological Air Monitoring Plan: PNNL Operations in Washington

The Environmental Radiological Air Monitoring Plan (EMP) for Pacific Northwest National Laboratory (PNNL) describes systems/processes/practices related to radiological operations in Richland and Sequim, Washington, that are associated with environmental radiological air monitoring and surveillance activities. The activities described support the lab’s responsibility to maintain safe operations and minimize negative impacts to both onsite and offsite persons and environment. Dose assessments required by regulations and DOE Orders for the public and biota are described. PNNL conducts environmental air surveillance monitoring as part of the PNNL Site Radioactive Air Emissions License (RAEL)-005 for Richland Campus, issued in 2010 with its most recent renewal effective in January 2021. The radioactive air emissions license for the PNNL-Sequim campus (RAEL-014) was issued to the U.S. Department of Energy in 2012 with its most recent renewal effective in January 2023. The EMP is a compilation of the following four documents: - Environmental Radiological Air Monitoring Plan (this main document) (PNNL-20919) - Sampling and Analysis Plan (Attachment 1) (PNNL-20919-1) - Data Management Plan (Attachment 2) (PNNL-20919-2) - Dose Assessment Guidance (Attachment 3) (PNNL-20919-3).

40 CFR 61 Subpart H↗

Aquifer Hydraulic Testing and Characterization Plan for the Ringold Formation Unit A in the Hanford 200-ZP-1 Groundwater Operable Unit and Vicinity

This document presents a plan for testing and characterizing the hydraulic properties of the Ringold Formation, member of Wooded Island – unit A (Rwia) in the 200-ZP groundwater operable unit. The testing approach includes multiple field methods and associated analyses designed to investigate and understand aquifer hydraulic properties over a range of scales. Testing was designed to achieve specific testing objectives identified previously in the 200 ZP-1 Groundwater Operable Unit Ringold Formation Unit A Characterization Sampling and Analysis Plan (Ringold A SAP). The test plan provides necessary technical and operational detail for writing subsequent field test instruction documents specific to each testing location. Hydraulic characterization activities will proceed in a phased manner focusing on areas identified to have knowledge gaps and also critical for remedy modifications and/or selection. These activities are designed to minimize impact to pump-and-treat (P&T) operations and to use existing P&T injection and extraction wells as stress wells, and include use of the new Rwia monitoring wells installed for Ringold A SAP activities. ZP-1 hydraulic testing will include slug testing in new Rwia wells, shutdown-recovery tests in multiple Rwia and composite Ringold Formation member of Wooded Island – unit E (Rwie)-Rwia aquifer test locations, installation of new Automated Water Level Network stations in Rwia monitoring wells, characterization of P&T and barometric responses, identifying the vertical distribution of hydraulic conductivity in the Rwia and Rwie units using electromagnetic borehole flowmeter tests, and single-well tracer testing in select Rwia monitoring wells. Slug testing to be conducted during drilling is described under the Ringold A SAP. The remaining testing activities are to be conducted after well drilling and completion and are described in this test plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Transparency in Electric Distribution System Planning to Support Affordability [Slides]

This resource identifies opportunities for communities to participate in the distribution system planning process to achieve their energy goals, including affordability. It begins with background information on the distribution system and distribution system planning, and then focuses on topical areas where communities could focus their engagement (e.g., non-wires alternatives, DER forecast, scenario analysis). The report concludes with illustrative examples of how communities have engaged in distribution system planning. The appendix provides procedural guidance on engagement in utility planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SiC cladding R&D execution plan

To advance the development of accident-tolerant fuel cladding for light-water reactors, the Advanced Fuels Campaign actively addresses the R&D gap between the specialized technological progress in SiC-based composite materials, led by industrial partners, and the fundamental scientific understanding of material behavior under reactor operating conditions. The laboratory activities are systematically organized based on the Development Strategy document, which outlines critical barriers to the use of SiC composites in nuclear energy applications for the coming decade and beyond. To complement the strategy, this execution plan specifies a detailed year-by-year work package and establishes key milestones for assessing progress in technological advancement. This plan has been formulated in collaboration with principal investigators at national laboratories, stakeholders, and industry partners with the goal of closing technology gaps and readying SiC-based cladding technologies for full-scale commercial testing. The research conducted at the national laboratories is categorized into three primary subjects: (1) addressing challenges associated with the performance of SiC cladding under normal operating environments, (2) identifying the failure limits of SiC cladding under accident conditions, and (3) modeling fuel performance for SiC cladding systems. Comprehensive laboratory activities integrate the development of advanced modeling tools for SiC-based cladding systems with experimental validation via integrated testing of multiphysics phenomena. This document lays out the laboratory plan to support the development of SiC-based technologies, which have the potential for significant operational and safety benefits for the U.S. nuclear industry. This plan aligns with industry developer needs, relevant Nuclear Energy University Programs, and Nuclear Energy Advanced Modeling and Simulation Programs to ensure SiC cladding technologies are matured as efficiently as possible and will be maintained and updated to accommodate the dynamically evolving progress of development, capability needs, and resource availability.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗

American particle and nuclear physics planning

In the United States the planning process relevant to future deep inelastic scattering involves both the high energy physics and nuclear physics funding and the two communities. In Canada there is no such split between the communities. Within the past two years there have been several planning initiatives and there may be more to come. We review the current status of both the planning and the plans.

Montgomery, Hugh E.↗

Hurricane Preparedness and Control Plan

This plan establishes policy and sets forth guidance, responsibilities and procedures utilized by Federal Electric Corp., communications department in support of the KSC Emergency Preparedness Plan, Annex A, Hurricane Control Plan (GP-355) dated 27 May 1971. This plan covers all FEC communications department personnel, facilities, and equipment situated at the Kennedy Space Center that are the responsibility of FEC contract NAS 10-4967.

Source record↗

Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

Dunbar, J. C.↗

First look analyses of five cycles of ERTS-1 imagery over County of Los Angeles: Assessment of data utility for urban development and regional planning

Significant results have been obtained from the analyses of ERTS-1 imagery from five cycles over Test Site SR 124 by classical photointerpretation and by an interactive hybrid multispectral information extraction system (GEMS). The synopticity, periodicity and multispectrality of ERTS coverage, available for the first time to LA County planners, have opened up both a new dimensionality in data and offer new capability in preparation of planning inputs. Photointerpretation of ERTS images has produced over 25 overlays at 1:1,000,000 scale depicting regional relations and urban structure in terms of several hundred linear and areal features. To mention only one such result, a possible new fault lineament has been discovered on the northern slope of the Santa Monica mountains in the scene 1144-18015, composited of MSS bands 4, 5, 6,. GEMS analysis of the ERTS products has provided new or improved information in the following planning data categories: urban vegetation; land cover segregation; man-made and natural impact monitoring; urban design; and suitability. ERTS data analysis has allowed planners to establish trends that directly impact planning policies. This new source of information will not only assist current methods to be more efficient, but permits entirely new planning methodologies to be employed.

Raje, S.↗

Apollo experience report: Evolution of the rendezvous-maneuver plan for the lunar-landing missions

The evolution of the nominal rendezvous-maneuver plan for the lunar landing missions is presented along with a summary of the significant development for the lunar module abort and rescue plan. A general discussion of the rendezvous dispersion analysis that was conducted in support of both the nominal and contingency rendezvous planning is included. Emphasis is placed on the technical developments from the early 1960's through the Apollo 15 mission (July to August 1971), but pertinent organizational factors also are discussed briefly. Recommendations for rendezvous planning for future programs relative to Apollo experience also are included.

Alexander, J. D.↗

WINDOW: A computer program for planning astronomical observations

A FORTRAN computer program called WINDOW was written to simplify the planning of astronomical observations of a number of objects in a limited time. The program lists the azimuths at 15 minute intervals of up to 20 objects while they are in a given range of elevation angles - the window - and gives the elevation angle of each object at its time of transit. This work was motivated by the need to use observing time efficiently on flights of NASA-Ames' Lear Jet and C-141 observatories; WINDOW permits the investigator to prepare preliminary flight plans. However, the program is suited to planning ground-based observations as well. The program and a sample flight plan are described.

Erickson, E. F.↗

The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

Bronstein, L.↗

AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule

The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

Yao, S. S.↗

Airline flight planning - The weather connection

The history of airline flight planning is briefly reviewed. Over half a century ago, when scheduled airline services began, weather data were almost nonexistent. By the early 1950's a reliable synoptic network provided upper air reports. The next 15 years saw a rapid growth in commercial aviation, and airlines introduced computer techniques to flight planning. The 1970's saw the development of weather satellites. The current state of flight planning activities is analyzed. It is found that accurate flight planning will require meteorological information on a finer scale than can be provided by a synoptic forecast. Opportunities for a new approach are examined, giving attention to the available options, a mesoscale numerical weather prediction model, limited area fine mesh models, man-computer interactive display systems, the use of interactive techniques with the present upper air data base, and the implementation of interactive techniques.

Steinberg, R.↗

Planning for rotorcraft and commuter air transportationn

Community planning needs, criteria, and other considerations such as intermodal coordination and regulatory requirements, for rotorcraft and fixed wing commuter air transportation were identified. A broad range of community planning guidelines, issues, and information which can be used to: (1) direct anticipated aircraft technological improvements; (2) assist planners in identifying and evaluating the opportunities and tradeoffs presented by rotorcraft and commuter aircraft options relative to other modes; and (3) increase communication between aircraft technologists and planners for the purpose of on going support in capitalizing on rotorcraft and commuter air opportunities are provided. The primary tool for identifying and analyzing planning requirements was a detailed questionnaire administered to a selected sample of 55 community planners and other involved in planning for helicopters and commuter aviation.

Stockwell, W. L.↗