Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scope”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Scoping Study for Direct Power Extraction (DPE) Systems (Final Report)

NETL led a detailed scoping study of various direct power extraction systems and concepts for utility power generation. The study consisted of qualitative analysis along with quantitative techno-economic analysis of selected systems which use magnetohydrodynamic (MHD) power generators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reservoir Lining for Pumped Storage Hydropower: Scoping Study of Geomembrane Lining Systems

This report summarizes the results of a scoping study performed to research the use of geomembrane lining systems for pumped storage hydropower (PSH) reservoirs. The study consisted of a literature review for pertinent and publicly available information about geomembrane lining materials and their use in dams, reservoirs, and PSH as well as an assessment of the applicability of geomembrane lining systems to PSH reservoirs.

13 HYDRO ENERGY↗

Integrated Basin-Scale Opportunity Assessment Initiative: Scoping Assessment for the Bighorn River Basin

The Basin-Scale Opportunity Assessment (BSOA) Initiative, led by the U.S. Department of Energy’s (DOE’s) Water Power Program, established an integrative, three-phase approach for assessing complementary hydropower-environmental opportunities at the scale of a river basin. Phase 1 of this approach is a scoping assessment process for a given river basin that is intended to provide initial identification, classification, screening, and integration of possible hydropower and environmental opportunities for DOE and basin stakeholders to consider carrying forward as appropriate. Phases 2 and 3 involve greater stakeholder engagement and technical analysis pertaining to potential opportunities identified during Phase 1. Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) developed a technical approach and methodology for BSOA Phase 1 assessments and performed assessments for the Bighorn, Connecticut, and Roanoke River basins. This report summarizes the Phase 1 assessment for the Bighorn River basin.

13 HYDRO ENERGY↗

Scoping Study: Scintillator Array for Fission Correlation Studies

This scoping study uses a simulation based on the PROSPECT (1) detector to assess the conceptual design of a modular system that could efficiently and simultaneously measure the Prompt Fast Neutron Spectrum (PFNS), the prompt fission neutron multiplicity, the prompt fission gamma-ray multiplicity and total energy, as well as temporal and angular correlations between the detected particles. The proposed experiment would require a mono-energetic pulsed neutron beam incident on an actinide target in the center of the detector. Beam induced backgrounds due to elastic and inelastic neutron scattering on the target are considered, while other backgrounds are ignored for this study.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

MARVEL Technical Overview: Breakdown of cost and scope growth through 90% Final Design

This report presents a breakdown of cost and scope growth for the Microreactor Applications Research Validation and Evaluation (MARVEL) project through the design phase, and includes observations, lessons learned, and the results from an independent project assessment. It presents the status and history of the project. Technology maturity is considered in high-level, qualitative comparison to other microreactor design efforts. Its purpose is to record MARVEL’s evolution and lessons learned from the planning and design phases through completion of 90% final design. Analyses included a detailed review of project cost, schedule, and periodic project reports and management documents. The Primary Coolant Apparatus Test (PCAT) is specifically highlighted. It was concluded that MARVEL would have benefited from more extensive planning early in the project to better define cost and schedule to provide more certainty in the total project cost and delivery date. Modest cost and schedule improvements may have been possible, but compared qualitatively, MARVEL’s total cost and schedule performance are consistent with that of other efforts currently underway. Better planning would have provided more certainty, improved risk mitigations, and potentially eliminated delays due to funding shortfalls. A recommended path forward is presented that addresses recommendations in the independent project assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ASIC Scoping Study Final Report

This report documents the results and findings of a one-year scoping study investigating multichannel readout application specific integrated circuits (ASICs) for interfacing to, and processing data from, silicon photomultiplier (SiPM) arrays. We document ASIC desired and required specifications for four applications supporting national security mission areas: neutron radiography, associated particle imaging, and two versions of kinematic neutron imaging cameras. While each application has a few unique requirements that stress capability, there is generally good agreement among most. Two recently developed ASIC devices were evaluated in a system-like configuration by interfacing these to scintillator crystals exposed to gamma and neutron sources. The 64-channel ORNL device delivered functional capability while meeting most mission requirements for neutron radiography. The Nalu Scientific device, a 32-channel full waveform digitizer, did not demonstrate reliable neutron / gamma separation but it is unclear if this was an ASIC issue or problems with test setup or firmware. A literature survey of other commercial and academic ASICs was undertaken to with the conclusion that existing devices do not meet all requirements.

42 ENGINEERING↗

Scoping Study: Highly Enriched Uranium Isotopic Assessments Using Gamma Spectroscopy Relative Efficiency Analysis When No Uranium-232 Is Present

This report documents results for a scoping study evaluating the viability of using the higher energy, low yield U-235 gamma emission at 345.9 keV to link low energy U-235 emissions to high energy U-238 emissions (rather than U-232 decay products gamma emissions) for highly enriched uranium isotopic gamma spectroscopy relative efficiency assessments when no or little U-232 is present and the U-235 signal is strong.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enzyme Engineering for Expanded Product Scope (CRADA Final Report)

As part of the Cyclotron Road program, Aralez Inc. investigated methods for producing chemicals sustainably, with a particular focus on engineering enzymes to make novel chemical products or accept new substrates that aren’t found in nature. We used directed evolution and other protein engineering techniques to create enzymes that perform abiological chemistry or make chemical products through a non-natural synthetic route. This work was an important step towards increasing the scope of compounds that can be manufactured in a sustainable fashion, which in turn will alleviate the high energy consumption, costly emissions, and waste that are hallmarks of current methods in chemical manufacturing.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Field Scoping Study of Gamma-Ray Measurement of UF 6 Cristillini Samples with CZT and HPGe Detectors

A field scoping study was conducted to evaluate the ability of Cd-Zn-Te (CZT) detectors and High Purity Germanium (HPGe) detectors to quantify the U-235 enrichment in UF 6 samples collected on alumina in P-10 tubes, similar to the Cristillini method of sample collection for analysis by mass spectrometry. With in-field gamma-ray spectroscopy methods, international safeguards and verification missions could benefit from quick in-field confirmation of declared enrichment values prior to or without the need for additional shipping, sample preparation and analysis. Samples of depleted (DU), low-enriched (LEU) and high-assay low-enriched (HALEU) uranium were collected on Cristillini-type alumina in P-10 tubes and measured with two H3D, Inc. M400 CZT detectors as well as a Canberra Falcon HPGe detector. The M400 detectors were able to confirm enrichment in the DU and LEU samples but not the HALEU sample in measurements 8-40 hrs after collection. The Falcon system was able to confirm enrichment in all three samples. Improvements in detector geometry, increase in number of detectors as well as increase sample mass loading may allow measurement of U-235 enrichment in these types of samples within 4-8hrs of collection with 5-10% uncertainty.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Scoping Study for Demand Respose DFT II Project in Morgantown, WV

This scoping study describes the underlying data resources and an analysis tool for a demand response assessment specifically tailored toward the needs of the Modern Grid Initiatives Demonstration Field Test in Phase II in Morgantown, WV. To develop demand response strategies as part of more general distribution automation, automated islanding and feeder reconfiguration schemes, an assessment of the demand response resource potential is required. This report provides the data for the resource assessment for residential customers and describes a tool that allows the analyst to estimate demand response in kW for each hour of the day, by end-use, season, day type (weekday versus weekend) with specific saturation rates of residential appliances valid for the Morgantown, WV area.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE/NV/26383-LTR2008-01 Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Crater Flat, Nye County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) (cover page figure) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Pahranagat National Wildlife Refuge, Lincoln County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Pahranagat NWR, Beatty, Rachel, Caliente, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Pahranagat National Wildlife Refuge, Lincoln County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Pahranagat NWR, Beatty, Rachel, Caliente, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Crater Flat, Nye County, Nevada

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) (cover page figure) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗