Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “development design testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

Path Forward for Groundwater Compliance Strategy at the Tuba City, Arizona, Disposal Site - 19581

The Tuba City, Arizona, Disposal Site is located in the Navajo Nation and near the Hopi Reservation. A uranium mill operated at the site from 1956 to 1966. During the operational period, mill tailings were slurried to an unlined impoundment. Excess slurry water was transferred to unlined evaporation ponds. Groundwater contamination resulting from the infiltration of fluids in the mill tailings impoundment and evaporation ponds was characterized in the 1990's. The site's Groundwater Compliance Action Plan was prepared in 1999, and a groundwater extraction and treatment system was constructed in 2002. Issues with aquifer productivity and treatment plant reliability led to the suspension of operations in 2014. The limitations of the remediation system prompted a realization that the site conceptual model should be reevaluated. An integrated study to better understand the geochemical and hydrologic factors affecting contaminant transport, to support the development of a new groundwater compliance strategy, was initiated in 2017 and is ongoing. In addition to the groundwater science components, the study included the evaluation of enhanced evaporation methods. The integrated evaluation will lead to refinement of the site groundwater flow model and development of a contaminant transport model and subsequent development of remedial alternatives. Remedial alternatives will be evaluated to determine a new groundwater compliance strategy. The objectives of geochemical testing were to confirm and quantify geochemical reactions controlling uranium fate and transport. These reactions are important because they control the distribution of uranium on the solid phase; potential for release from the solid phase; mobility of uranium in the water phase; and potential for uranium redistribution onto the currently uncontaminated solid phase. A key outcome is the change in understanding of the mass of uranium in the subsurface that is potentially soluble. These results contradict the previous basis for remediation: that uranium was almost exclusively present in soluble form, within the boundaries of the contaminant plume. Testing showed that uranium sorption downgradient from the plume was measurable but relatively minimal. The movement of other mill-related constituents (nitrate, sulfate, alkalinity) results in the dissolution of naturally occurring uranium and a higher than background concentration of uranium in groundwater. These constituents are not subject to sorption, and their downgradient concentrations are reduced only by diffusion and dispersion. The geochemical testing provides conceptual and quantitative information on potential plume migration. While the testing revealed the potential availability of uranium contaminant sources, the aquifer buffering capacity, pH, and presence of oxygen in groundwater may, individually or in combination, be controlling factors for plume movement. Evaluation of evaporative treatment alternatives was undertaken to determine one or more sustainable and efficient methods capable of treating 151 liters per minute (L/min) (40 gallons per minute), the annual average flow rate. In addition to establishing the baseline capacity for evaporation using the site's existing pond, prospective methods of enhanced evaporation included preheating water before inflow to the evaporation pond, vertical circulation in the pond, dye addition, and Wind-Aided Intensified Evaporation. Consideration of a 151 L/min evaporative treatment arose from previous analysis of extraction well production rates and contaminant mass removal, which indicated that about 80% contaminant removal, relative to full-scale operation of the site's groundwater treatment plant, could be achieved with a smaller capacity system. The lower-flow evaporative option also represented a potentially more sustainable treatment system in comparison to restarting or reconfiguring the groundwater treatment plant. Aquifer pumping tests were designed to develop or improve estimates of hydraulic properties such as transmissivity, horizontal and vertical hydraulic conductivity, storativity, and storage coefficient. Testing involved pumping from one well at a constant flow rate for up to 5 days while monitoring groundwater drawdown in the pumping well and five surrounding wells and then shutting down the pumping well to observe groundwater recovery. The aquifer pumping test results provide insight regarding the hydraulics of the saturated zone. The saturated zone is in a low-conductivity formation with preferential flow in the horizontal direction. The aquifer exhibits low vertical conductance. The use of AQTESOLV software indicates that the saturated zone is a layered system due to the cross-bedded sand-grain orientation within the Navajo Sandstone. These indicators of limited vertical flow provide a potential justification for the observed depth of the contaminant plume of 15-46 meters (50-150 feet) below ground surface). Given the relatively low vertical conductance, groundwater extraction should be focused on the upper portions of the saturated zone. Aquifer response testing provided an improved understanding of aquifer characteristics. However, the primary objective, to identify optimal groundwater extraction strategies, has not been fully addressed. A list of path forward activities for hydrologic analyses was developed, with an overarching objective of providing input parameters for groundwater flow and contaminant transport modeling. Defensible predictions of contaminant transport, through modeling, are critical to the development of a new site groundwater compliance strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on FY17 testing in support of integrated EPP-SMT design methods development

The goal of the proposed integrated Elastic Perfectly-Plastic (EPP) and Simplified Model Test (SMT) methodology is to incorporate a SMT data-based approach for creep-fatigue damage evaluation into the EPP methodology to avoid the separate evaluation of creep and fatigue damage and eliminate the requirement for stress classification in current methods; thus greatly simplifying evaluation of elevated temperature cyclic service. The purpose of this methodology is to minimize over-conservatism while properly accounting for localized defects and stress risers. To support the implementation of the proposed methodology and to verify the applicability of the code rules, thermomechanical tests continued in FY17. This report presents the recent test results for Type 1 SMT specimens on Alloy 617 with long hold times, pressurization SMT on Alloy 617, and two-bar thermal ratcheting test results on SS316H at the temperature range of 405 °C to 705 °C. Preliminary EPP strain range analysis on the two-bar tests are critically evaluated and compared with the experimental results.

97 MATHEMATICS AND COMPUTING↗

Deep Borehole Field Test Conceptual Design Report

This report documents conceptual design development for the Deep Borehole Field Test (DBFT), including test packages (simulated waste packages, not containing waste) and a system for demonstrating emplacement and retrieval of those packages in the planned Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system. This document therefore identifies key options for a DBD system, describes an updated reference DBD concept, and derives a recommended concept for the DBFT demonstration. The objective of the DBFT is to confirm the safety and feasibility of the DBD concept for long-term isolation of radioactive waste. The conceptual design described in this report will demonstrate equipment and operations for safe waste handling and downhole emplacement of test packages, while contributing to an evaluation of the overall safety and practicality of the DBD concept. The DBFT also includes drilling and downhole characterization investigations that are described elsewhere (see Section 1). Importantly, no radioactive waste will be used in the DBFT, nor will the DBFT site be used for disposal of any type of waste. The foremost performance objective for conduct of the DBFT is to demonstrate safe operations in all aspects of the test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Z Machine Detonator Holder Testing

Current packaging for the detonators used on the Z Machine is dirty, not well suited for reusability, and labor intensive to use. A new packaging design is developed, explosively tested, and approved by the numerous stakeholders resulting in more efficient operations and lowered costs.

42 ENGINEERING↗

Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO 2 from Flue Gas

The objective of this project was to demonstrate an innovative process to mineralize CO 2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO 2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO 2 from the flue gas of a power production facility in Moss Landing, CA as well as flue gas from coal combustion. This final report details all development, analysis, design and testing of the project. Also included in the final report are an updated Techno-Economic Analysis and CO 2 Lifecycle Analysis. The subsystems included in the pilot demonstration plant are the mineralization subsystem, the Alkalinity Based on Low Energy (ABLE) subsystem, the waste calcium oxide processing subsystem, and the fiber cement board production subsystem. The fully integrated plant was proven to be capable of capturing CO 2 from various sources (gas and coal) and mineralizing it into a reactive calcium carbonate binder and subsequently producing commercial size (4ftx8ft) fiber cement boards. The final report provides a description of the “as built” design of these subsystems and the results of the commissioning activities that have taken place to confirm operability. The report also discusses the results of the fully integrated operation of the facility. Fiber cement boards have been produced in this facility exclusively using reactive calcium carbonate from captured CO 2 from flue gas. These boards meet all US and China appropriate acceptance standards. Use demonstrations for these boards are now underway.

20 FOSSIL-FUELED POWER PLANTS↗

FY16 Progress Report on Test Results In Support Of Integrated EPP and SMT Design Methods Development

The proposed integrated Elastic Perfectly-Plastic (EPP) and Simplified Model Test (SMT) methodology consists of incorporating an SMT data-based approach for creep-fatigue damage evaluation into the EPP methodology to avoid using the creep-fatigue interaction diagram (the D diagram) and to minimize over-conservatism while properly accounting for localized defects and stress risers. To support the implementation of the proposed code rules and to verify their applicability, a series of thermomechanical tests have been initiated. This report presents the recent test results for Type 2 SMT specimens on Alloy 617, Pressurization SMT on Alloy 617, Type 1 SMT on Gr. 91, and two-bar thermal ratcheting test results on Alloy 617 with a new thermal loading profile.

42 ENGINEERING↗

Design and testing of a combined neutron and gamma assay system for measuring fissile material in fuel and waste items - 15340

A combined neutron and gamma ray assay system for the measurement of fissile material in both fuel and waste items has been designed, modelled, developed and tested. The purpose of the system is to measure and characterize a wide range of fissile materials including uranium, plutonium, americium and mixed oxide fuel arising from a variety of processes and facilities across the United Kingdom. Dounreay Site Restoration Limited at Dounreay currently stores these items form the United Kingdom Nuclear Decommissioning Authority's un-irradiated fuel inventory. This inventory comprises historic materials from ex-United Kingdom Atomic Energy Authority nuclear fuel projects and experiments together with fast reactor fuel materials and some commercial fuel items as delivered to Dounreay for recovery. The combined assay system has been designed and constructed to support the operation of a fuel processing facility, which will be operated at Dounreay to treat these historic legacy fuel materials, making them suitable for long term storage. Appropriate characterization of the fissile material is required for safety, criticality control and nuclear materials safeguards purposes prior to final disposition. The system consists of both gamma ray and neutron measurement components. The results of a neutron measurement are combined with the gamma ray isotopic ratio measurement results to generate the assay result for the fissile material being characterized. The gamma ray component of the system employs a safeguards quality high purity Germanium detector with electro-mechanical cooling and the measurements of fissile material containers are made in a shielded chamber with a tin and copper graded lining. Containers of fissile material are rotated during the gamma ray measurement and a variable automatic steel collimator aperture mechanism is employed to adjust the measured count rate to control detector dead time. Gamma ray spectra are analysed using the plutonium and uranium isotopic ratio code PC/FRAM. The gamma ray system can also be configured to perform a direct assay of small quantities of uranium bearing material. For this assay measurement a series of cadmium filters can be positioned in front of the detector to reduce the contribution from 59 keV gamma rays from Am-241. In addition to gamma ray isotopic measurements, both active and passive neutron assay is performed by the system. The neutron-measuring component consists of a thick walled cylindrical polyethylene chamber, which provides neutron moderation for 30 one-inch diameter He-3 detector tubes located in re-entrant channels in the polyethylene moderator. Two removable polyethylene-inserts incorporating lower plug assemblies are provided, one with and one without a cadmium lining. Also two top plug units are provided, again one with cadmium and one without a cadmium liner. The Neutron Subsystem can be operated both as a passive and as an active neutron coincidence counter. In both fast and thermal active neutron mode, the neutron component employs two americium-beryllium (Am-Be) alpha-n neutron sources, one positioned in the top and the other in the bottom plug unit. The neutron sources are removed when the counter is operated in passive mode. Passive neutron detection efficiency and active neutron performance has been modelled using the MCNP Monte Carlo computer simulation code as part of the design process. In the absence of fissile samples, operation of the gamma ray component of the system has been tested initially using calibrated Eu-152 and Ba-133 gamma ray sources and the use of archived spectra from fissile material measurements. Initial testing of the neutron system has employed a calibrated Cf-252 spontaneous fission neutron source. Neutron testing has been confirmed using further MCNP simulations. The results of test measurements with the system are presented and compared with the results of MCNP measurement simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Borehole Field Test Conceptual Design Report.

This report documents conceptual design development for the Deep Borehole Field Test (DBFT), including test packages (simulated waste packages, not containing waste) and a system for demonstrating emplacement and retrieval of those packages in the planned Field Test Borehole (FTB). For the DBFT to have demonstration value, it must be based on conceptualization of a deep borehole disposal (DBD) system. This document therefore identifies key options for a DBD system, describes an updated reference DBD concept, and derives a recommended concept for the DBFT demonstration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Report on Design and Failure Limits of SiC/SiC and FeCrAl ATF Cladding Concepts under RIA

Pellet-cladding mechanical interaction (PCMI) is a possible failure scenario during a postulated reactivity-initiated accident (RIA). This report summarizes fiscal year 2018 research activities that were undertaken to evaluate the PCMI-like hoop strain–driven mechanical response of accident tolerant fuel cladding candidates of silicon carbide fiber/silicon carbide matrix composite (SiC/SiC) and iron–chromium–aluminum (FeCrAl) tube specimens. To achieve various RIA-like conditions, the modified-burst test device developed during fiscal years 2016 and 2017 was used. A heating capability was also added to the system for high-temperature testing of FeCrAl samples.The first section of this report assesses the accuracy of the two-dimensional digital image correlation calculated strain values for tube samples. The speckle patterns are computer generated in a two-dimensional plane, and the generated images were wrapped into a cylindrical surface for the validation using digital image correlation technique on curved geometries. Subsequent sections address the failure behavior of SiC/SiC composites and long-term heat treated and as-drawn FeCrAl alloy tubes at various strain rates relevant to the postulated RIA events. In the last part, the effect of possible design parameters of failure strain and the strain rate are discussed for SiC/SiC composites and FeCrAl alloys during the PCMI phase of RIA.Future work is planned to develop and design safety tests for accident tolerant fuel cladding candidates and the advanced fuel forms with respect to their transient responses. A broader perspective on the mechanical behavior of the unirradiated and irradiated accident tolerant fuel cladding candidates will be developed using the modified-burst test and other mechanical tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel Safety Research Plan for Accident Tolerant Fuels

This document outlines a strategic plan for a safety research program for accident tolerant fuels. Accident tolerant fuels (ATFs) are nuclear fuel materials and designs for existing and future light water reactors. This effort is under the Department of Energy Office of Nuclear Energy’s Nuclear Technology Research and Development Advanced Fuels Campaign. The development of ATF is an industry lead initiative with fuel designs being championed by Westinghouse, Framatome, and General Electric. Industry goals for ATF deployment include implementing the first batch reloads of coated cladding and doped fuel designs into commercial reactors by 2023 and having the first batch reloads of more advanced designs into commercial reactors by 2026. Follow on goals include implementing the first full cores of coated cladding and doped fuel designs into commercial reactors by 2026 and implementing full cores of more advanced designs by 2030. The objectives of the national laboratory research programs within the Advanced Fuels Campaign related to ATF are: 1. Develop and maintain of unique nuclear testing infrastructure, which includes test reactors, hot cell PIE equipment, and unique out of pile separate effects testing facilities. 2. Respond directly to industry requests for support by partnering with the ATF vendors and executing experiments and/or analysis on their behalf. 3. Conduct independent scientific investigations into the performance of the different ATF concepts that are relevant to Industry designs. To achieve these objectives, the safety research program will execute transient irradiation experiments at the TREAT facility at Idaho National Laboratory with the aim of identifying the relevant transient fuel behaviors for each fuel design in order to establish appropriate fuel safety criteria and thresholds. Two test series are described in this plan, (1) an Integral Test Series, and (2) a Focused Effects Test Series. In fulfillment of the first objective for the safety research program, Integral Effects Tests will be developed and demonstrated using standard UO2 Zircaloy fuel designs in both the fresh and previously irradiated case. The Integral Test Series will consist of three campaigns to evaluate transient fuel performance in Reactivity Initiated Accidents, Loss of Coolant Accidents, and in generalized Power Cooling Mismatch scenarios. Development of these test programs also enables the safety research program to fulfill its second objective by making these three test programs available to each industry team. Initially, priority will be given in the integral test series to the coated cladding and doped fuel concepts as their deployment schedule is the most aggressive. To fulfill the third objective of the safety research program, a Focused Effects Test Series is also being developed which will examine specific transient fuel behaviors that are of general interest to all the ATF designs under development. These tests look at transient fuel behavior related to pellet cladding mechanical interaction, coated cladding swelling, rupture, and time at temperature behavior, non oxide fuel melting and mechanical interaction with Silicon Carbide cladding, UO2 and doped UO2 fuel fragmentation and transient fission gas release, and finally fuel coolant interaction. This document provides a general overview of the objectives of the safety research program as well as providing background into how programs like this have been used in the past to develop the criteria necessary for the safe operation of the present fuel designs. An overview of the materials and methods used for safety testing is presented. Finally the Integral and Focused Effects tests series are introduced and described. This document will be maintained as a “living” document with annual updates to reflect evolving requirements and needs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Melt Infiltrated Ceramic Matrix Composites for Shrouds and Combustor Liners of Advanced Industrial Gas Turbines

This report covers work performed under the Advanced Materials for Advanced Industrial Gas Turbines (AMAIGT) program by GE Global Research and its collaborators from 2000 through 2010. A first stage shroud for a 7FA-class gas turbine engine utilizing HiPerComp{reg_sign}* ceramic matrix composite (CMC) material was developed. The design, fabrication, rig testing and engine testing of this shroud system are described. Through two field engine tests, the latter of which is still in progress at a Jacksonville Electric Authority generating station, the robustness of the CMC material and the shroud system in general were demonstrated, with shrouds having accumulated nearly 7,000 hours of field engine testing at the conclusion of the program. During the latter test the engine performance benefits from utilizing CMC shrouds were verified. Similar development of a CMC combustor liner design for a 7FA-class engine is also described. The feasibility of using the HiPerComp{reg_sign} CMC material for combustor liner applications was demonstrated in a Solar Turbines Ceramic Stationary Gas Turbine (CSGT) engine test where the liner performed without incident for 12,822 hours. The deposition processes for applying environmental barrier coatings to the CMC components were also developed, and the performance of the coatings in the rig and engine tests is described.

33 ADVANCED PROPULSION SYSTEMS↗

Development of an Acoustic Sensor On-Line Gas Temperature Measurement in Gasifiers

This project was awarded under U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) Program Solicitation DE-PS26-02NT41422 and specifically addresses Technical Topical Area 2 - Gasification Technologies. The project team includes Enertechnix, Inc. as the main contractor and ConocoPhillips Company as a technical partner, who also provides access to the SG Solutions Gasification Facility (formerly Wabash River Energy Limited), host for the field-testing portion of the research. The objective of this project was to adapt acoustic pyrometer technology to make it suitable for measuring gas temperature inside a coal gasifier, to develop a prototype sensor based on this technology, and to demonstrate its performance through testing on a commercial gasifier. The project was organized in three phases, each of approximately one year duration. The first phase consisted of researching a variety of sound generation and coupling approaches suitable for use with a high pressure process, evaluation of the impact of gas composition variability on the acoustic temperature measurement approach, evaluation of the impact of suspended particles and gas properties on sound attenuation, evaluation of slagging issues and development of concepts to deal with this issue, development and testing of key prototype components to allow selection of the best approaches, and development of a conceptual design for a field prototype sensor that could be tested on an operating gasifier. The second phase consisted of designing and fabricating a series of prototype sensors, testing them in the laboratory, and developing a conceptual design for a field prototype sensor. The third phase consisted of designing and fabricating the field prototype, and testing it in the lab and in a commercial gasifier to demonstrate the ability to obtain accurate measurements of gas temperature in an operating gasifier. Following the completion of the initial 3 year project, several continuations were awarded by the Department of Energy to allow Enertechnix to conduct extended testing of the sensor at the Wabash River facility. In February, 2008 the sensor was installed on the gasifier in preparation for a long-term test. During the initial testing of the sensor a stainless steel tube on the sensor failed and allowed syngas to escape. The syngas self-ignited and the ensuing small fire damaged some of the components on the sensor. There was no damage to the gasifier or other equipment and no injuries resulted from this incident. Two meetings were held to identify the root causes of the incident-one at Wabash River and one at Enertechnix. A list of recommended improvements that would have addressed the causes of the incident was created and presented to the Department of Energy on May 2, 2008. However, the DOE decided not to pursue these improvements and terminated the project. This report describes all of the activities conducted during the project and reports the findings of each activity in detail. The investigation of potential sound generation and coupling methods led to the selection of a reflected shock method which has been developed into a functioning prototype device. The principles of operation of this device and its performance characteristics are described in the report. Modeling of the attenuation of sound by suspended particles and by interaction of the sound pulses with the high temperature syngas inside the gasifier was conducted and the predictions of those models were used to determine the required sound pulse intensity to allow the sound pulses to be detected after passage through the gasifier environment. These modeling results are presented in this report. A study of the likely spatial and temporal variability of gas composition inside the gasifier was performed and the results of that study was used to predict the impact of that variability on the accuracy of the acoustic temperature method. These results are reported here. A design for a port rodding mechanism was developed to deal with potential slagging issues and was incorporated into the prototype sensor. This port rodding mechanism operated flawlessly during the field testing, but because these tests were performed in a region of the gasifier that experiences little slagging, the effectiveness of the rodding mechanism in dealing with highly slagging conditions was not fully demonstrated. This report describes the design and operation of the automated Gasifier Acoustic Pyrometer (autoGAP) which was tested at the Wabash River facility. The results of the tests are reported and analyzed in detail. All of the objectives of the initial R&D project were achieved and a field prototype acoustic pyrometer sensor was successfully tested at the Wabash River gasifier plant.

01 COAL, LIGNITE, AND PEAT↗

ANS Summary of Safety Design Strategy for the Versatile Test Reactor

This paper describes the unique challenges with developing and documenting the Safety Design Strategy for the Versatile Test Reactor in the following key areas: 1. Identification of the key safety goals in the VTR facility design and operation that are to ensure adequate protection of the public, workers, and environment as required by 10 CFR 830, “Nuclear Safety Management.” These goals are fulfilled by an approach that applies defense-in-depth (DID) by applying various layers (or levels) of protection to prevent the release of radioactive and hazardous materials. 2. Early identification of the hazards that are normally associated with a large fast reactor facility can result from postulated failure conditions in one or more of the reactor systems or from operational errors. 3. Identification of the key decisions that must be made during the initial project life cycle that will affect the eventual design and construction of the VTR and enable clarity in safety expectations. 4. Identification of the applicable regulatory framework requirements for demonstrating compliance with safety basis requirements in 10 CFR 830 Subpart B for the VTR. 5. Application of the proposed Licensing Modernization Program (LMP) recommendations for advanced non-LWR reactors as outlined in Nuclear Energy Institute (NEI)-18-04, “Risk-Informed Performance-Based Guidance for Non-Light Water Reactor Licensing Basis Development.”

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

ORNL Package Testing Program Overview

When transporting radioactive or hazardous materials, safety and security are top priorities. Packaging and transportation regulations require reliable evidence that containers have passed rigorous performance tests to ensure that the public and the environment are protected from the hazardous nature of the cargo. Because of its long history in energy and security research, Oak Ridge National Laboratory (ORNL) has needed to ship hazardous packages for the past 65 years. Since the 1940s, ORNL has made significant contributions to transportation regulations and has been at the forefront of regulatory testing development. Today, ORNL is a leader in standards development and testing of designs of radioactive material packages. ORNL plays a critical role in ensuring the safe transportation of radioactive materials across the United States by executing rigorous testing campaigns of packages that contain radioactive materials. Early testing activities focused on supporting the development of transportation regulations established by both the International Atomic Energy Agency (IAEA) and the United States. Currently, all package testing activities are performed under the Package Testing Program (PTP) at the Package Evaluation Facility (PEF) located at the National Transportation Research Center (NTRC), which is about 10 miles from the main ORNL campus. The PTP develops and evaluates testing solutions, ensuring that they are safe efficient, and in compliance with regulatory requirements. The vision for the PTP is to be a world-class leader in the evaluation and testing of radioactive and hazardous material packages. The key elements necessary to fulfill this mission are an experienced and professional staff; state-of-the-art facilities, equipment, and instrumentation; and completion of challenging programs and projects important to package transportation. Collaborations with other internal and external organizations play a significant role in building stronger teams and achieving this vision. By adhering to and advancing regulatory standards, ORNL’s PTP supports development of safe and compliant packaging, safeguarding the transportation process from potential risks associated with radioactive material logistics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AREVA Team Enhanced Accident Tolerant Fuels Concepts (Phase 1A Final Report)

In response to the Department of Energy (DOE) funded initiative to develop and deploy lead fuel assemblies (LFAs) of Enhanced Accident Tolerant Fuel (EATF) into a US reactor within 10 years, AREVA put together a team to develop promising technologies for improved fuel performance during off normal operations. This team consisted of the University of Florida (UF) and the University of Wisconsin (UW), Savannah River National Laboratory (SRNL), Duke Energy and Tennessee Valley Authority (TVA). This team brought broad experience and expertise to bear on EATF development. AREVA has been designing; manufacturing and testing nuclear fuel for over 50 years and is one of the 3 large international companies supplying fuel to the nuclear industry. The university and National Laboratory team members brought expertise in nuclear fuel concepts and materials development. Duke and TVA brought practical utility operating experience. This report documents the results from the initial “discovery phase” where the team explored options for EATF concepts that provide enhanced accident tolerance for both Design Basis (DB) and Beyond Design Basis Events (BDB). The main driver for the concepts under development were that they could be implemented in a 10 year time frame and be economically viable and acceptable to the nuclear fuel marketplace. The economics of fuel design make this DOE funded project very important to the nuclear industry. Even incremental changes to an existing fuel design can cost in the range of $100M to implement through to LFAs. If this money is invested evenly over 10 years then it can take the fuel vendor several decades after the start of the project to recover their initial investment and reach a breakeven point on the initial investment. Step or radical changes to a fuel assembly design can cost upwards of $500M and will take even longer for the fuel vendor to recover their investment. With the projected lifetimes of the current generation of nuclear power plants large scale investment by the fuel vendors is difficult to justify. Specific EATF enhancements considered by the AREVA team were; Improved performance in DB and BDB conditions; Reduced release to the environment in a catastrophic accident; Improved performance during normal operating conditions; Improved performance if US reactors start to load follow; Equal or improved economics of the fuel; and Improvements to the fuel behavior to support future transportation and storage of the used nuclear fuel (UNF). In pursuit of the above enhancements, EATF technology concepts that our team considered were; Additives to the fuel pellets which included; Chromia doping to increase fission gas retention. Chromia doping has the potential to improve load following characteristics, improve performance of the fuel pellet during clad failure, and potentially lock up cesium into the fuel matrix; Silicon Carbide (SiC) Fibers to improve thermal heat transfer in normal operating conditions which also improves margin in accident conditions and the potential to lock up iodine into the fuel matrix; Nano-diamond particles to enhance thermal conductivity; Coatings on the fuel cladding; and Nine coatings on the existing Zircaloy cladding to increase coping time and reduce clad oxidation and hydrogen generation during accident conditions, as well as reduce hydrogen pickup and mitigate hydride reorientation in the cladding. To facilitate the development process AREVA adopted a formal “Gate Review Process” (GR) that was used to review results and focus resources onto promising technologies to reduce costs and identify the technologies that would potentially be carried forward to LFAs within a 10 year period. During the initial discovery phase of the project AREVA took the decision to be relatively hands off and allow our university and National Laboratory partners to be free thinking and consider options that would not be constrained by preconceived ideas from the fuel vendor. To counter this and to keep the partners focused, the GR process was utilized. During this GR process each of the team members presented their findings to a board made up of technical experts from utilities, fuel manufacturing experts, fuel technical experts, and fuel research and development (R&D) experts. During the initial 2 years of the project there were several major accomplishments. These accomplishments, along with the implications for successfully implementing EATF, are; The experimental spark plasma sintering process (SPS) process was successfully used to produce fuel pellets containing either 10% SiC whiskers or nano-diamond particles. The ability to use this process enables the thermal margin enhancements of the fuel additives to be realized. Without the SPS process, the conventional process cannot support adding pellet additives in the required quantities; Coatings of Ti2AlC were successfully applied to Zircaloy-4 cladding. Testing of Ti2AlC coatings at Loss of Cooling Accident (LOCA) conditions showed reduced cladding oxidation compared to present un-coated Zircaloy-4 cladding. This achievement allows the presently used cladding system to be retained so that the 10 year schedule can be met. Having to implement a new cladding material will extend the development schedule beyond 10 years; Several documents were produced to support future development, testing, and licensing of EATF, including a design requirements traceability matrix, a draft business plan, a draft test plan, a draft regulatory plan, and the acceptance criteria for lead fuel assembly insertion into a commercial reactor. This preparatory work lays the foundation for ensuring the future development plans address all the areas required to test, license, and manufacture the new EATF; and In addition, the high velocity oxy-fuel and electrophoretic deposition (EPD) coating application processes were dropped from further consideration due to their inability to meet manufacturing criteria. This allows the resources to be focused on the most promising EATF concepts identified. Future development opportunities that were identified during this work include; The use of SiC or diamond requires that a new pellet production technique (Spark Plasma Sintering), be developed. This entails investment in developing, proving and implementing a new commercial pellet production process. Development of the process to apply thinner coatings is required; Coatings cannot be too “thick” or they will displace a significant volume of water in the core resulting in reduced thermal hydraulic characteristics; Application of the coating at high temperature can affect the Zircaloy substrate. This will require the development and implementation of a new cladding coating manufacturing process; and Replace the Cold Spray (CS) cladding coating application with the Physical Vapor Deposition (PVD) process to eliminate duplication of work and provide greater control over coating thicknesses. This can result in a reduction in the final cycle economic penalty of coatings.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Polymer Additive Manufacturing for Marine Renewable Energy Applications: Best Practices, Research Trends, and Current Challenges

Additive manufacturing (AM) is a rapidly growing technology space, not only for prototyping, but is also becoming more feasible at larger scales and increasing component quantities. There are a large variety of AM processes and materials available to users and effectively applying those processes and materials to a specific use case can be challenging. One specific area where AM could be particularly beneficial is marine renewable energy (MRE). Not only is MRE a relatively nascent industry with a near-term need for rapid deployments and prototype testing, but developers could also see long-term benefits from the broad variety of environmentally resistant materials available and the ability to manufacture complex geometries that AM technologies offer. Over the past 4 years, AM materials have played an increasing role in the Advanced Materials project; a multi-year, multi-laboratory research project funded by the U.S. Department of Energy's Water Power Technologies Office, with the main goal of reducing barriers to the adoption of complex materials in the MRE industry. The primary focus of this project is to develop test methods and generate datasets to understand the long-term performance of advanced materials in marine environmental and address specific material challenges as they arise. This report provides an extensive overview of the research that has been performed specific to AM polymers as part of the Advanced Materials project. The intention of this document is to provide recommendations of best practices with regards to material selection, mechanical test method development, and design practices, lessons learned along the way, current research trends, and ongoing challenges with regards to AM polymers in marine environments. In particular, this report focuses on several key aspects: Material and process selection, Environmental conditioning and subsequent degradation quantification through mechanical characterization, Composite reinforcements on AM polymer substrates, Adhesion of instrumentation for mechanical characterization and loads measurements, Protective coatings for preventing biofouling and water ingress, Other MRE case studies where AM has proved particularly useful. Ultimately, we hope that the test methods that have been developed, data generated, and lessons learned from this research will be valuable to the MRE community (researchers and developers alike), as well as other industries, and can be used as a reference point as the respective MRE and AM industries continue to grow and mature.

16 TIDAL AND WAVE POWER↗