Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “charging stations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 145 records · Page 8

USAID Colombia Young Leaders Workforce Training Program Action Plans: Planning for Electric Vehicle Charging Infrastructure in Bogotá

As part of the U.S. Agency for International Development (USAID)-National Renewable Energy Laboratory (NREL) Young Leaders Workforce Training Program in Colombia, the Grupo Energía Bogotá (GEB) participants leveraged their training and professional experience to develop an action plan for modeling and evaluating Bogotá's projected electric vehicle (EV) charging needs to meet future demand. This case study summarizes the collaboration between USAID-NREL, GEB, and the Bogotá Department of Transportation Mobility Secretariat (SDM) to estimate EV charging station needs to meet projected future EV sales in the city of Bogotá and determine high-priority locations within the greater Bogotá metropolitan area for planning and applying EVSE investment and installation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Power-to-Gas Systems for Active Load Management at EV Charging Sites with High DER Penetration

Intermittent renewable systems and increasing electric vehicle (EV) penetrations increase load intermittency—and will require expensive distribution system infrastructure upgrades. Power-to-gas (P2G) systems are highly controllable loads that can be modulated to regulate the net load behind the meter. In this work, we present an active load management approach using P2G systems to regulate the net load for an EV charging station with high penetrations of renewable generation. The system also validates the feasibility of the proposed approach using a 750-kW electrolyzer operated with the distribution system in a real-time power-hardware-in-the-loop test. Finally, we evaluate the impact of the size of the P2G system on its ability to regulate the net load.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Automated Electric Vehicle Fleet Operations for On-Demand Service: Challenges and Opportunities

Automated/autonomous vehicle fleet operations within automated mobility districts have been studied over the past five years by the National Renewable Energy Laboratory, a US Department of Energy federally funded research and development center. This paper extends the analysis in this third phase of research underway to include considerations for electric vehicle operations and charging within a fleet of right-sized automated vehicles providing on-demand public mobility services. The current focus of research is on the operational complexities and associated challenges for automated/autonomous vehicles employing electric drivetrains and the resultant need for an efficient battery charging process while vehicles are operating in an "on-demand" mode of service. The blossoming of microtransit with shared-ride and point-to-point dispatching of each vehicle instills complex operations, with multiple mobility-on-demand transit operating sites being deployed, studied, and analyzed across North America. As a starting point, the authors' experience over the past 20 years with the analysis of automated transit network systems operating on and within dedicated and protected transitways provides initial insights into the system-level operational implications for maintaining a sufficient battery charge for a fleet of automated vehicles. Lessons learned through the prior analyses of automated transit network systems operating in on-demand service are identified, along with the capital cost implications for the requisite operating fleet size and charging station infrastructure for various approaches. These costs are summarized in juxtaposition with the benefits of realizing the higher goals of reducing environmental impacts and energy use within automated mobility districts as automated/autonomous vehicle technology matures. Finally, the discussion addresses key aspects of battery-electric propulsion for managed fleets in fully automated operation that will be studied as the third phase of research continues.

ADVANCED PROPULSION SYSTEMS↗

Control and Real-Time Simulation of Microgrids with EV Fast-Charging and Grid-Forming Resources

Fast charging stations (FCSs) for electric vehicles (EVs) can behave as constant power loads, which is problematic for the operation of grid-forming (GFM) inverter-based resources (IBRs). To tackle this problem, this paper proposes a control suite that makes FCSs responsive to ac voltage and frequency disturbances. To test the performance of the FCS controls, the paper also sets forth theory to compensate for time-delays appearing in the real-time simulation of microgrid models divided into several central processing units (CPUs). Furthermore, these contributions are showcased via multi-CPU real-time simulations of a faulted microgrid having EV FCSs and GFM IBRs powered by photovoltaic solar arrays as well as power hardware-in-the-loop experiments. These contributions are significant to address NERC recommendations and IEEE standards.

14 SOLAR ENERGY↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

There's No Place Like Home: Residential Parking, Electrical Access, and Implications for the Future of Electric Vehicle Charging Infrastructure

In March 2021, the cumulative sale of plug-in electric vehicles (PEVs), including plug-in hybrid electric vehicles (PHEV) and battery electric vehicles (BEV), reached 1.8 million in the United States (Argonne National Laboratory 2021). However, PEV adoption is still in its infancy; its market share has just reached around 3% of new light-duty vehicle (LDV) sales by the end of 2020 (Alliance for Automotive Innovation 2021). Current trends suggest that PEV market share in the United States is increasing. The U.S. Energy Information Administration's (EIA's) 2020 Annual Energy Outlook forecasts PEV registrations to exceed 8 million vehicles by 2030 (AEO 2020). PEV adoption is expected to be led by states that are regulating the sale of zero emission vehicles (ZEVs) (California Air Resources Board). California continues to push for more aggressive ZEV regulations; the state recently issued an executive order aimed at 100% of LDV sales being ZEVs by 2035 (Office of Governor Newsom). At the federal level, the Biden administration has shown great ambition in encouraging broader electric vehicle (EV) adoption, including setting the goal of installing 500,000 new chargers nationwide (The White House 2021). Access to charging infrastructure is consistently cited as one of the primary barriers to the increased sale of PHEVs and BEVs (Carley et al. 2019). In the United States, PEV charging options are often described using a pyramid structure, with residential charging as the foundation, workplace charging in the middle, and public charging on top (Figure 1). The existing electricity system, which generates, transmits, and distributes electric fuel to residential households, has helped PEVs partially overcome the "chicken and egg" conundrum that has haunted other alternative fuels. Viable home access to electric charging is also an important equity issue, because non-residential PEV charging options (e.g., workplace or public charging stations) are generally more expensive. Households without residential charging access may experience higher total cost of PEV ownership if non-residential charging options are more costly.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Infrastructure Consequence Assessment

With consumers’ growing interest in electric vehicles, extreme fast charging stations are poised to provide high-power charging to rapidly recharge light-duty passenger vehicles. High-power charging requires high-level communication between vehicle and charger to govern the charging process. The coupling of power and communication increases the potential scale of cyberattacks. Using a full Western Electricity Coordinating Council planning model, load manipulation from high-power charging infrastructure is investigated. Two cases of load manipulation are studied: (i) a discrete, widespread system event and (ii) loads modulated near the Western Interconnect’s resonant frequency. In (i) some generation trips and in (ii) oscillations are observed on the California Oregon Intertie. Neither scenario results in significant adverse effects to the grid.

33 ADVANCED PROPULSION SYSTEMS↗

Universal Battery Supercharger

During the course of the UBS project a dc-fast charger was developed to be used in off board high power charging stations. High efficiency is targeted to reduce the charging price for the consumer while reducing the charge time. In the meantime, the size of the converter is minimized so that it could be used in small spaces and potentially urban areas. The topology is modular, and the power level can be expanded for charging higher power vehicles like trucks and buses. During the course of this research several key technologies was developed in LESES that improve the performance of the power electronics system used in EV charger. Integrated magnetics was developed for DMCR to improve the power density as well as efficiency of the magnetic components which is one of the main bottlenecks of EV development. Triangular mode EV current conduction mode is using to perform soft switching (increase efficiency) without adding any new components to the existing topology. Passive and active damping are developed to suppress the interaction between grid and converter, stabilizing the control system. Further numerous other technical problems have been solved to pave the way for even higher performance converters in the future.

25 ENERGY STORAGE↗

Thermal Evaluation of CCS and NACS Reference Devices and Adapters

It is important for manufacturers of electric vehicle charging connectors, inlets, and adapters to understand the thermal performance of their devices. Various standards, such as SAE J1772, SAE J3400, IEC 62196, UL 2251, and UL 2252, list temperature limits that charging hardware needs to meet. However, there are currently very limited standardized reference devices against which to measure connector performance, and those that do currently exist generally serve charging currents less than 500A. This can make determining whether a charging connector meets the appropriate temperature limits difficult. Additionally, as automakers and charging station suppliers transition from the SAE J1772 CCS charging standard to SAE J3400 NACS, a number of CCS-to-NACS and NACS-to-CCS adapters are entering the market. These devices are being produced both by well-known automakers/equipment OEMs and lesser-known third-party suppliers, across a wide range of price points and construction qualities. Though SAE J3400/1 and UL 2252 lay out standards for adapter construction, performance and overtemperature response, there is no guarantee that any particular adapter will follow these standards and react to overtemperature events appropriately. This work addresses these issues by developing and evaluating a set of CCS and NACS reference inlet devices to validate the performance of charging connectors in the 500-800A range. The work also evaluates the performance of multiple NACS-to-CCS and CCS-to-NACS charging adapters with respect to UL 2252 temperature limits and SAE J3400/1 overtemperature signaling criteria.

33 ADVANCED PROPULSION SYSTEMS↗

National Electric Vehicle Infrastructure Formula Program (ANNUAL REPORT | PLAN YEAR 2023–2024)

The 2021 Infrastructure Investment and Jobs Act, also known as the Bipartisan Infrastructure Law (BIL), invests $\$$7.5 billion to build out a national electric vehicle (EV) charging network and created the Joint Office of Energy and Transportation (Joint Office) to “study, plan, coordinate, and implement issues of joint concern between the two agencies.” The BIL represents a historic effort to electrify the U.S. transportation system, which has significant potential to reduce U.S. greenhouse gas emissions and help tackle the climate crisis. The U.S. transportation sector accounts for one-third of the nation’s greenhouse gas emissions—the largest share of all primary sectors, including electricity production, industry, commercial and residential, and agriculture. The National Electric Vehicle Infrastructure (NEVI) Formula Program, one of the BIL funding programs, was launched in February 2022, providing nearly $\$$5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of EV charging stations beginning with designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with an emphasis on the Interstate Highway System. The funding is made available to the states in allocations each year pending FHWA certification of the state’s annual deployment plan. The NEVI program is in its third year, so there's a lot to celebrate. As of July 2024, 39 states have released solicitations for their NEVI programs and eight states have opened their first NEVI-funded stations (61 ports in total), which have already powered thousands of charging sessions for EV drivers across America. Additional stations are in the pipeline with more than 2,500 additional ports having been awarded or conditionally awarded by the states. All states released their Fiscal Year (FY) 2024 deployment plan updates to reflect the new minimum requirements and guidance, and several states added newly designated EV AFCs in their FY 2024 deployment plan updates, bringing the total AFC network of EV corridors to more than 81,000 miles.

33 ADVANCED PROPULSION SYSTEMS↗

Cybersecurity for Electric Vehicle Charging Infrastructure

As the U.S. electrifies the transportation sector, cyberattacks targeting vehicle charging could impact several critical infrastructure sectors including power systems, manufacturing, medical services, and agriculture. This is a growing area of concern as charging stations increase power delivery capabilities and must communicate to authorize charging, sequence the charging process, and manage load (grid operators, vehicles, OEM vendors, charging network operators, etc.). The research challenges are numerous and complicated because there are many end users, stakeholders, and software and equipment vendors interests involved. Poorly implemented electric vehicle supply equipment (EVSE), electric vehicle (EV), or grid operator communication systems could be a significant risk to EV adoption because the political, social, and financial impact of cyberattacks — or public perception of such — would ripple across the industry and produce lasting effects. Unfortunately, there is currently no comprehensive EVSE cybersecurity approach and limited best practices have been adopted by the EV/EVSE industry. There is an incomplete industry understanding of the attack surface, interconnected assets, and unsecured inter faces. Comprehensive cybersecurity recommendations founded on sound research are necessary to secure EV charging infrastructure. This project provided the power, security, and automotive industry with a strong technical basis for securing this infrastructure by developing threat models, determining technology gaps, and identifying or developing effective countermeasures. Specifically, the team created a cybersecurity threat model and performed a technical risk assessment of EVSE assets across multiple manufacturers and vendors, so that automotive, charging, and utility stakeholders could better protect customers, vehicles, and power systems in the face of new cyber threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Charging Demand in the Chicago Metropolitan Area through 2030

This report outlines the collaborative efforts between Argonne National Laboratory and Exelon in advancing the Agent-Based Transportation Energy Analysis Model (ATEAM). Aligning with ComEd’s beneficial electrification plan, this study developed eight scenarios to access the temporal and spatial distribution of charging load and demand stemming from the widespread adoption of battery electric vehicles (BEV) adoption, augmented public charging infrastructure deployment, and increased multi-unit dwelling (MUD) charging availability. Enhancements to the ATEAM model encompassed the simulation of multiple days of travel behavior, estimation of total public charging infrastructure needs, user interface refinements, and output tracking at both vehicle and charging station levels. The total electricity consumption for residential and public charging to support over 800,000 BEVs in Chicago in 2029 is projected at approximately 10.2 GWh. Enhanced MUD home charging accessibility (70%) amplifies the home charging load in the study area by 1.5% compared to the baseline scenario (10%). The widespread adoption of BEVs reduces peak charging loads, owing to their inclusion across households with diverse income levels, thus fostering a more dispersed charging activity pattern. However, widespread BEV adoption increases the peak home charging load in areas with lower median household incomes, reflecting a higher BEV concentration in these locales and, subsequently, heightened peak charging demands. In the Widespread BEV adoption scenario, fewer census tracts exhibit elevated peak loads for combined home and public charging, indicating a more even distribution of charging demand across the study area. Predominantly, peak loads for combined charging—both home and public— occur between 2 p.m. and 10 p.m. across all scenarios, encompassing the majority of census tracts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ChargeX OCPI Recommendations

The Open Charge Point Interface (OCPI) is an open protocol that enables electric vehicle (EV) charging systems to work together across networks. It supports communication and data sharing between Charge Point Operators (CPOs), who manage charging stations, and e-Mobility Service Providers (eMSPs), who provide charging services to EV drivers. OCPI facilitates functions like user authorization, remote charge point control, charging session data exchange, and billing through Charge Detail Records (CDRs). This allows EV roaming, so drivers can charge at different networks without multiple accounts. As the EV market grows due to increased adoption and technological advancements, OCPI faces higher demands. This has revealed issues with CDR format consistency, timestamp standardization across regions, transmission of EV-side error codes for troubleshooting, and support for new use cases. These challenges can affect operations and user experience, particularly as the industry starts considering Vehicle-to-Grid (V2G) systems, where EVs supply energy to the grid, and Vehicle-to-Everything (V2X) technologies for broader energy interactions. Using feedback from the ChargeX Diagnostics taskforce discussions, industry 1-on-1 meetings, technical standards, and OCPI’s evolution through versions (e.g., OCPI 2.1.1, 2.2, and 2.2.1), this report identifies these issues and suggests practical recommendations. These aim to improve interoperability, streamline operations, and prepare OCPI for future trends in the EV charging ecosystem.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Electric Vehicles for Consumers

More consumers are choosing electric vehicles (EVs) as new, competitively priced models with longer ranges hit the market. More public charging stations are also rapidly becoming available, and some offer quick charges to get drivers back on the road in minutes. New EVs are released all the time, with models designed to meet a wider variety of needs. To learn whether an EV is right for you, assess your driving requirements, available vehicles, and cost considerations. Easily compare costs and benefits of specific vehicles using the FuelEconomy.gov vehicle comparison tool.

ADVANCED PROPULSION SYSTEMS↗

Electric Vehicles for Consumers

More consumers are choosing electric vehicles (EVs) as new, competitively priced models with longer ranges hit the market. More public charging stations are also rapidly becoming available, and some offer quick charges to get drivers back on the road in minutes. New EVs are released all the time, with models designed to meet a wider variety of needs. To learn whether an EV is right for you, assess your driving requirements, available vehicles, and cost considerations. Easily compare costs and benefits of specific vehicles using the FuelEconomy.gov vehicle comparison tool.

charging↗

Optimizing dynamic wireless charging for electric buses: A data-driven approach to infrastructure planning

The network configuration significantly impacts the performance of dynamic wireless charging (DWC) technology for electric buses. Here, this study presents a novel approach to planning charging infrastructure for public transit using data-driven nonconvex mixed-integer optimization. Integrating DWC and charging station technologies reveals a trade-off between enroute and stationary charging times. Our framework optimizes bus frequency settings and transmitter coil arrangements to minimize operational and infrastructure costs. A case study in Chattanooga, Tennessee, demonstrates the method's effectiveness in mitigating range anxiety and reducing charging expenses. This research implies that integrating DWC technology into public transit systems can enhance the feasibility and cost-effectiveness of electric bus operations, promoting sustainable urban mobility.

33 ADVANCED PROPULSION SYSTEMS↗

Fast Charging Infrastructure for Electrifying Road Trips to and from National Parks in the Western United States

National parks in the Western United States draw over 80 million visitors every year, and most visitors rely on personal cars for their road trips (or long-distance travels). Travel to national parks represents distinct travel demand, as they are typically located in remote areas necessitating long-distance trips. This study investigates the quantity and locations of on-route fast charging infrastructure needed by 2030 to enable seamless travel to/from national parks using electric vehicles in seven target states in the region, employing unprecedented high-resolution spatial and temporal analysis. We find that the required number of fast charging ports for on-route charging infrastructure ranges from 1,200 to 22,000, depending on different assumptions of key input parameters - vehicle electrification rate, charging behavior, average gap between charging stations, port utilization rate, and towing trailers. Our analysis also indicates that electrical load for on-route fast charging infrastructure would peak in the afternoon, in the range of 70-400 MW, varying with the key input parameters. This study illustrates how different input parameters result in different degrees of impact on various aspects of charging infrastructure. We also examine the characteristics of projected charging infrastructure in terms of land use type, relationship with traffic volume, size of stations, and other variables.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Charging Rendezvous and Motion Planning for a Multi-AGV Team Including a Mobile Charging Host

Teams of automated battery-powered electric vehicles have the potential to execute complex mission tasks in off-road environments for agriculture, military, and other applications. Limited onboard energy reserves hinder their adoption in large-scale resource-constrained environments, where recharging is a necessity. It may be infeasible to install a network of static charging stations in off-road environments. For this reason, dedicated mobile host vehicles with charging capabilities are proposed as a means to increase range and capabilities of the multivehicle team. Here, in this study, we consider an ad hoc planning framework, where results from a high-confidence trajectory planner are leveraged to plan charging rendezvous between a host and other worker vehicles in a receding horizon fashion to provide high confidence that energy reserves will not be prematurely exhausted. The core problem is posed so as to minimize the impact of recharging on the mission in terms of task delays, overall energy utilization, and costs of fast charging. Through extensive Monte Carlo simulations of an off-road mission, we show a decrease in task delays without substantial increases in energy needs by updating the charging rendezvous plan during the mission. However, if updates are made too often, model mismatch may cause unnecessary cycling and mission failure.

Energy constraints↗