At least 145 records · Page 8

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Improving Real-world Measurement-based Phase Identification in Power Distribution Feeders with a Novel Reliability Criteria Assessment

This paper is concerned with solving the phase identification problem in a real-world smart grid project; where there is only a few smart meters available on each of the five power distribution feeders in the test site in Riverside, CA. The main idea is to develop and use two reliability criteria that can identify the most reliable components in a broken-down phase identification analysis; thereby significantly improving the accuracy of phase identification. The proposed method consists of three steps. The results from field implementation reveal the accuracy and consistency of the proposed method in practice, in correctly and reliability identifying the phase connectivity.

Phase identification Data-driven method Sliding wi↗

Human Reliability and the Cost of Doing Business

Most businesses recognize that people will make mistakes and assume errors are just part of the cost of doing business, but does it need to be? Companies with high risk, or major consequences, should consider the effect of human error. In a variety of industries, Human Errors have caused costly failures and workplace injuries. These have included: airline mishaps, medical malpractice, administration of medication and major oil spills have all been blamed on human error. A technique to mitigate or even eliminate some of these costly human errors is the use of Human Reliability Analysis (HRA). Various methodologies are available to perform Human Reliability Assessments that range from identifying the most likely areas for concern to detailed assessments with human error failure probabilities calculated. Which methodology to use would be based on a variety of factors that would include: 1) how people react and act in different industries, and differing expectations based on industries standards, 2) factors that influence how the human errors could occur such as tasks, tools, environment, workplace, support, training and procedure, 3) type and availability of data and 4) how the industry views risk & reliability influences ( types of emergencies, contingencies and routine tasks versus cost based concerns). The Human Reliability Assessments should be the first step to reduce, mitigate or eliminate the costly mistakes or catastrophic failures. Using Human Reliability techniques to identify and classify human error risks allows a company more opportunities to mitigate or eliminate these risks and prevent costly failures.

DeMott, Diana↗

Improving the Reliability and Modal Stability of High Power 870 nm AlGaAs CSP Laser Diodes for Applications to Free Space Communication Systems

The operating characteristics (power-current, beam divergence, etc.) and reliability assessment of high-power CSP lasers is discussed. The emission wavelength of these lasers was optimized at 860 to 880 nm. The operational characteristics of a new laser, the inverse channel substrate planar (ICSP) laser, grown by metalorganic chemical vapor deposition (MOCVD), is discussed and the reliability assessment of this laser is reported. The highlights of this study include a reduction in the threshold current value for the laser to 15 mA and a degradation rate of less than 2 kW/hr for the lasers operating at 60 mW of peak output power.

Connolly, J. C.↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly↗

Stochastic Reconstruction of Thermal Protection Material Properties from Arc-Jet Experiments

Material response models are used to assess reliability using variances in the bond-line temperature predictions based on uncertainties in trajectory, aerothermal environment, and material properties. A key deficiency in the current approach is that input uncertainties are too often subjective, empirical, or ad-hoc, and are not rigorously linked to the arc-jet test data used to develop the TPS material model. While materials such as PICA are well understood, future missions may require more novel materials such as HEEET where unknown uncertainties have real consequences on the ability to assess reliability. A quantifiable estimate of reliability requires an iterative methodology where the parameters driving the variance in bond-line temperature (for example) are systematically identified. A test campaign to collect data or develop new models can then be identified to reduce those input uncertainties. A Bayesian inference loop defines these connections mathematically, i.e., prior knowledge about uncertainty is updated based on observation. While these concepts are well known (and often applied intuitively in a non-rigorous approach), only recent advances in reduced-order modelling have made them computationally viable methods for engineering. By replacing deterministic inverse methods with stochastic approaches, the hope is new materials proposed for future missions can more rapidly be developed with a greater understanding of the TPS material reliability. Two additional steps for the analysis of arc jet test data are discussed. The first is ability to construct a reduced-order model using material response simulations (Icarus/US3D) of the arc-jet test articles, and the second is the inclusion of this surrogate model in the Bayesian inversion process. Both capabilities will be demonstrated using prior PICA arc-jet test data. The quality of a surrogate model will be investigated and the variances on the calibrated material properties will be compared to our current understanding of the PICA material model.

Material response↗

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Mary-Elizabeth Davis↗

Assessing the reliability of medical resource demand models in the context of COVID-19

Abstract Background Numerous medical resource demand models have been created as tools for governments or hospitals, aiming to predict the need for crucial resources like ventilators, hospital beds, personal protective equipment (PPE), and diagnostic kits during crises such as the COVID-19 pandemic. However, the reliability of these demand models remains uncertain. Methods Demand models typically consist of two main components: hospital use epidemiological models that predict hospitalizations or daily admissions, and a demand calculator that translates the outputs of the epidemiological model into predictions for resource usage. We conducted separate analyses to evaluate each of these components. In the first analysis, we validated various hospital use epidemiological models using a recent validation framework designed for epidemiological models. This allowed us to quantify the accuracy of the models in predicting critical aspects such as the date and magnitude of local COVID-19 peaks, among other factors. In the second analysis, we evaluated a range of demand calculators for ventilators, medical gowns, and COVID-19 test kits. To achieve this, we decoupled these demand calculators from the underlying epidemiological models and provided ground truth data for their inputs. This approach enabled a direct comparison of the demand calculators, comparing them against each other and actual usage data when available. The code is available athttps://doi.org/10.5281/zenodo.13712387. Results Performance varied greatly across the epidemiological models, with greater variability in COVID-19 hospital use predictions than for COVID-19 deaths as analyzed previously. Some models did not have any peaks. Among those that did, the models under-estimated date of peak approximately as often as they over-estimated, but were more likely to under-estimate magnitude of peak, with typical relative errors around 50%. Regarding demand calculator predictions, there was significant variability, including five-fold differences in predictions for gown models. Validation against actual or surrogate usage data illustrated the potential value of demand models while demonstrating their limitations. Conclusions The emerging field of demand modeling holds promise in averting medical resource shortages during future public health emergencies. However, achieving this potential necessitates focused efforts on standardization, transparency, and rigorous model validation before placing reliance on demand models in critical public health decision-making.

Medical Informatics↗

Assessing the Resource Adequacy and Community Impacts of an Evolving Grid: Considerations for State Regulators

As U.S. power systems continue to decarbonize, state regulators must be able to broadly assess the cost and reliability implications of proposed fossil retirements and the corresponding resources that are coming online to replace them. Specifically, regulators must evaluate whether proposed infrastructure investments are sufficient to ensure the long-term reliability of the system, while also protecting rate payers by ensuring that such investments are necessary and not excessive. Broadly speaking, this objective is typically framed in terms of maintaining long-term resource adequacy at the lowest cost, while also ensuring that other social and/or environmental objectives are satisfied. System planners currently have a host of sophisticated analytical tools at their disposal to evaluate the cost-benefit trade-offs of different approaches to ensuring resource adequacy. However, most of these tools and associated metrics were designed with traditional power systems in mind. Over the past decade, it has become increasingly clear that the metrics and models that have reliably assessed resource adequacy in systems dominated by large thermal and hydropower resources will be insufficient for systems with significant contributions from emerging technologies such as wind, solar and storage. Therefore, in recent years many new metrics and modeling approaches have been developed, and are increasingly being implemented, to meet the needs of the clean energy transition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Direct Metallization with Reactive Inks – Assessment of Reliability and Process Sensitivities

This project will reduce silver consumption in photovoltaic cells by a factor of almost ten – from 95 mg/cell (the median across technologies) to 10 mg/cell. To achieve this goal, we will replace screen-printed silver pastes with contact dispensed reactive inks that produce lower resistivity metallizations at lower temperatures and with thinner films. This project will generate the understanding necessary to scale this reactive ink technology from the bench-scale to commercial throughputs. Specifically, it will combine fundamental understanding on physics and chemistries involved in contact printing of reactive inks with detailed performance and reliability studies to quantify how tightly processing parameters need to be controlled in order to reliably metallize high efficiency solar cells at commercial throughputs of 36,000 cells/hour.

14 SOLAR ENERGY↗

Assessing the Reliability of Relevant Tweets and Validation Using Manual and Automatic Approaches for Flood Risk Communication

While Twitter has been touted as a preeminent source of up-to-date information on hazard events, the reliability of tweets is still a concern. Our previous publication extracted relevant tweets containing information about the 2013 Colorado flood event and its impacts. Using the relevant tweets, this research further examined the reliability (accuracy and trueness) of the tweets by examining the text and image content and comparing them to other publicly available data sources. Both manual identification of text information and automated (Google Cloud Vision, application programming interface (API)) extraction of images were implemented to balance accurate information verification and efficient processing time. The results showed that both the text and images contained useful information about damaged/flooded roads/streets. This information will help emergency response coordination efforts and informed allocation of resources when enough tweets contain geocoordinates or location/venue names. This research will identify reliable crowdsourced risk information to facilitate near real-time emergency response through better use of crowdsourced risk communication platforms.

54 ENVIRONMENTAL SCIENCES↗

A cost assessment of reliability requirements for shuttle-recoverable experiments

The relaunching of unsuccessful experiments or satellites will become a real option with the advent of the space shuttle. An examination was made of the cost effectiveness of relaxing reliability requirements for experiment hardware by allowing more than one flight of an experiment in the event of its failure. Any desired overall reliability or probability of mission success can be acquired by launching an experiment with less reliability two or more times if necessary. Although this procedure leads to uncertainty in total cost projections, because the number of flights is not known in advance, a considerable cost reduction can sometimes be achieved. In cases where reflight costs are low relative to the experiment's cost, three flights with overall reliability 0.9 can be made for less than half the cost of one flight with a reliability of 0.9. An example typical of shuttle payload cost projections is cited where three low reliability flights would cost less than $50 million and a single high reliability flight would cost over $100 million. The ratio of reflight cost to experiment cost is varied and its effect on the range in total cost is observed. An optimum design reliability selection criterion to minimize expected cost is proposed, and a simple graphical method of determining this reliability is demonstrated.

Campbell, J. W.↗

Study of SEM induced current and voltage contrast modes to assess semiconductor reliability

The purpose of the scanning electron microscopy study was to review the failure history of existing integrated circuit technologies to identify predominant failure mechanisms, and to evaluate the feasibility of their detection using SEM application techniques. The study investigated the effects of E-beam irradiation damage and contamination deposition rates; developed the necessary methods for applying the techniques to the detection of latent defects and weaknesses in integrated circuits; and made recommendations for applying the techniques.

Beall, J. R.↗

Assessing the Reliability of NDE

Versatile FORTRAN computer algorithm developed for calculating and plotting reliability of nondestructive evaluation (NDE) technique for inspection of flaws. Developed specifically to determine reliability of radiographic and ultrasonic methods for detection of critical flaws in structural ceramic materials. Reliability displayed in form of plot of probability of detection versus flaw size. NDE methods used in such applications as diagnostic medicine, quality control in industrial production, and prediction of failure in structural components.

Roth, Don J.↗